• Title/Summary/Keyword: TOC Theory

검색결과 65건 처리시간 0.022초

의왕ICD 철도수송 활성화 방안에 관한 연구 (A study on the promotion for rail transport in Ui-Wang ICD)

  • 조욱래;장성용
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.2359-2373
    • /
    • 2008
  • In 1991, Korean government decided to establish the Inland Container Depot for activating transportation of rail freight container and encourage the effectiveness of intermodal transport system. Therefore, the Ui-Wang ICD has been built in Kyonggi province and began to operate in 1993. However, Despite of original purpose of the Inland Container Depot, rail freight volume at public CY(Container Yard) in Ui-Wang ICD has been recorded very low. This paper deals with the promotion strategy for rail transport in Ui-Wang ICD. The relationship of conflicts between the rail-oriented transporters and road-oriented transporters in Ui-Wang ICD have been found through the TOC thinking process and some solutions are suggested. Some undesirable effects in operation of Ui-Wang ICD are listed and current reality tree(CRT) has been established and future reality tree(FRT) which includes some injections to active the rail transport in ICD has been recommended based on CRT. In order to make good solutions the situation in Busan-jin station ICD known as similar to Ui-Wang ICD has been analyzed.

  • PDF

건설프로젝트에 CCPM의 적용 (Application of CCPM to Construction Project)

  • 김영;이영대;김옥수;김성환;박혁
    • 한국건설관리학회논문집
    • /
    • 제4권3호
    • /
    • pp.95-101
    • /
    • 2003
  • 제약이론은 특정한 관리기술을 개발하는데 사용되는 접근방법이며, 철학이다. 운영관리상에 적용되었던 소설 "The Goal"에 의해서 처음으로 널리 보급되었다. 1997이후로 프로젝트관리의 두 가지 영역에서 적용되어 왔으며, 그 첫 번째 적용은 단일프로젝트에 대한 공기단축과 프로젝트 통제관리의 간소화를 위한 공정관리분야이며, 두 번째 적용은 동시에 수행되는 여러 프로젝트에 의해서 공유되는 자원의 효과적 관리이다. 이 논문은 프로젝트 관리에 적용된 제약이론인 애로사슬(Critical chain)의 원리에 대해서 연구하고, 국내의 건설프로젝트에 적용하는 것을 목적으로 한다.

납기를 갖는 Job Shop 생산시스템에 대한 Simplified-DBR Scheduling 적용방안에 관한 연구 (A Study on Simplified-DBR Scheduling in Job Shop Environment with Due Dates)

  • 한원규;박창권
    • 산업공학
    • /
    • 제25권1호
    • /
    • pp.106-113
    • /
    • 2012
  • There are few factors like a due date observance of the customer's order, reducing the manufacturing lead time, and minimizing the inventory investment to successfully run the manufacturing system. It is difficult for corporation and a person concerned to be offered indicators to achieve few factors mentioned above from complex manufacturing systems having much fluctuations. Simplified-DBR based on TOC(Theory of Constraints) is a management paradigm which can offer indicators to effectively face with fluctuating market's needs when market's demand is smaller than a capacity of manufacturing system. This paper is offering a core indicator and management model which is needed to successfully run the manufacturing system for corporation and a person concerned who have short experience and knowledge and newly construct Sinplified-DBR manufacturing system. Thus, this paper provides a systemic guidance in the offered model through the simulation.

TOC 이론을 기반으로 한 전략적 관점에서의 공급사슬관리 (Supply Chain Management from the Strategic Perspective through the Theory of Constraints)

  • 간형식;김기주;황재훈
    • 한국산업정보학회논문지
    • /
    • 제7권3호
    • /
    • pp.95-106
    • /
    • 2002
  • As the information technology including Internet not only opened the cyber world but also has evolved as a platform that enables a new generation of businesses and remolds the shape of thinking and the rules of supply chain management (SCM). By using the Theory of Constraints, which seems simple but robust to review the traditional SCM context, the paper proposes a conceptual framework to handle the SCM issues. From the strategic perspective, this paper focuses on three policy constraints: supplier-manufacturer oriented constraints, manufacturer-distributor oriented constraints, and supply chain oriented constraints. To optimize the throughput and sustain the competitiveness of supply chain members in the dynamic business environment, the companies should utilize the potential competency of information technology and consistently perform the activities of removing and/or reinforcing the constraints.

  • PDF

Research on the Throughput Impact of the Strategic Stabilizing Capacity Constraint Resources by Prolonging Planning Period

  • Wu, Horng-Huei;Chen, Ching-Piao;Tsai, Chih-Hung;Huang, Kuo-Wei
    • International Journal of Quality Innovation
    • /
    • 제10권2호
    • /
    • pp.29-42
    • /
    • 2009
  • The issue of capacity constraint resources (CCR) or bottlenecks wandering in product mix decision by applying Theory of Constraints (TOC) management philosophy has been mentioned and demonstrated in several papers. In this study, the effect for prolonging the planning period (PPP) so as to stabilize the CCR is investigated. The results show that the effect for PPP alternative will be positive or negative which is depending on the environment condition. However, a majority cases which have positive effect for PPP alternative can be recognized prior knowing the marketing demand, which is significant in the real application.

DBR 시뮬레이션을 통한 Job Shop 시스템 분석 (Job Shop System Analysis through DBR Simulation)

  • 심윤섭;변지환;황순현;전태보
    • 산업기술연구
    • /
    • 제31권B호
    • /
    • pp.51-58
    • /
    • 2011
  • Simulation plays a pivotal role in the analysis of complex systems. In this study, a job shop manufacturing system has been analyzed through DBR (Drum-buffer-rope) simulation. Specific attention has been put to examine the rate of due-date achievement. We first derived key factors affecting the system performance. We then developed ARENA simulation program based on DBR of TOC (Theory of Constraints) concepts. Based on the performance measure, factors, and experimental design, we obtained the results. We have drawn meaningful results through examination of the results. The results obtained from this study may provide a good base for practical applications.

  • PDF

주문형 생산에서의 실시간 납기 산정 (Real-time Delivery Estimation in Build-to-order Manufacturing)

  • 홍태영;강무진;박세형;이상봉
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2002년도 추계학술대회 논문집
    • /
    • pp.101-104
    • /
    • 2002
  • Leading companies have embraced the new economy with new and innovative BTO models. Instead of conventional company-oriented manufacturing scheduling, customer-oriented scheduling method attracts more and more attention. To evaluate the delivery of customer order in advance, the real production capacity as well as procurement lead time should be taken into account. This paper describes a quasi-real-time order delivery estimation system using TOC(Theory of Constraints) based scheduling method.

  • PDF

TOD이론의 발전과 입지효율성에 관한 연구 (A Study on the Location Efficiency and the Development of Transit-Oriented Development Theory)

  • 곽동화
    • 한국디지털건축인테리어학회논문집
    • /
    • 제12권3호
    • /
    • pp.27-38
    • /
    • 2012
  • The purpose of this study is to analysis the concept of location efficiency, a base for the qualitative evaluation of TOD, and to propose the method of urban design for the improvement of location efficiency. Because of the environmental crisis by urbanization, sprawl and global warming, the importance of the solution through TOD has been increasing. For the future development of TOD, it becomes important to evaluate TOD qualitatively. From the study, it is grasped that location efficiency contains the concepts of value recapture, QoL and choice, financial return, and efficient regional land use and patterns. And the method of urban design for location efficiency is proposed as the followings: Form Based Zoning as land use plan, TOD and TOC model as node function, and street systems, mixed-use development, characteristic housing with various types, and networking of neighborhood facilities as place function.

반도체 Intra-Bay 물류시스템에서의 차량 배차 (A New Vehicle Dispatching in Semiconductor Intra-Bay Material Handling System)

  • 구평회;서정대;장재진
    • 산업공학
    • /
    • 제16권spc호
    • /
    • pp.93-98
    • /
    • 2003
  • This paper addresses an AGV dispatching problem in semiconductor clean-room bays where AGVs move cassettes of wafers between machines or machines and a central buffer. Since each machine in a bay has a local buffer of limited capacity, material flow should be controlled in a careful way to maintain high system performance. It is regarded that two most important performance measures in a semiconductor bay are throughput rate and lead-time. The throughput rate is determined by a bottleneck resource and the lead-time depends on smooth material flow in the system. This paper presents an AGV dispatching procedure based on the concept of theory of constraints (TOC), by which dispatching decisions are made to utilize the bottleneck resource at the maximum level and to smooth the flow of material. The new dispatching procedure is compared with existing dispatching rules through simulation experiments.

THE APPLICATION OF THEORY OF CONSTRAINT IN SCHEDULING

  • Tsung-Chieh Tsai;Min-Lan Young
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.902-907
    • /
    • 2005
  • This study was undertaken to develop a comprehensive scheduling method which applied the core concept(DBR) of TOC to PERT, and to combine Monte Carlo Simulation to revise the uncertainties of activities then to eliminate project duration uncertainty. Most of the project duration overlooks the fact that in spite of minimizing the project duration, the uncertainty of constrained resources still puts the reliability of project duration in jeopardy. For the contractor, however, the most important thing is to comply the project scheduling with the planning to reduce the uncertainty of the project activities, operational interaction and project duration. In order to demonstrate that the model can be used in construction project, the scheduling of a steel-structure project was used as a case study to verify the validity of this model.

  • PDF