• Title/Summary/Keyword: TBM 터널

Search Result 354, Processing Time 0.023 seconds

A study on numerical modeling method considering gap parameter and backfill grouting of the shield TBM tunnel (쉴드 TBM 터널의 gap parameter와 뒤채움재를 고려한 수치모델링 방법에 대한 연구)

  • You, Kwang-Ho;Kim, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.5
    • /
    • pp.799-812
    • /
    • 2017
  • Backfill grouting and realistic convergence distribution were not properly considered in previous studies on 2D numerical analysis of a shield TBM tunnel. In this study, a modeling method was suggested to cope with this problem by considering a realistic convergence distribution and proper properties of backfill grouting. To this end, the influence of gap parameter and depth of rock cover on volume loss and composed of ground volume loss around tunnel excavation and surface volume loss were analyzed with a single layer of weathered soil. As a result, most of surface settlements were occurred immediately after excavation. Additional, as depth of rock cover and gap parameter increased, the influence range of surface settlement curves obtained from 2D numerical analyses became broader than a suggested theoretical equation. Therefore, it is inferred that gap parameter should be applied based on load distribution ratio and the property of backfill grouting properly considered for the estimation of the precise behavior of a shield TBM tunnel in 2D numerical analysis.

A fundamental study of slurry management for slurry shield TBM by sea water influence (해수의 영향에 따른 이수식 TBM의 슬러리 관리를 위한 기초적 연구)

  • Kim, Dae-Young;Lee, Jae-won;Jung, Jae-Hoon;Kang, Han-Byul;Jee, Sung-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.463-473
    • /
    • 2017
  • Bentonite swells when it comes into contact with water and makes it a viscous fluid. Thus it is widely used in civil engineering works for waterproofing. Utilizing the properties of bentonite, the slurry shield TBM supports excavated face with pressurized slurry as well as transporting excavated muck. When bentonite is in contact with seawater, due to the change of double layer thickness, its expandability and viscosity are lowered. This may cause problems for excavation stability and muck discharge due to the increase of sea water inflow when Slurry TBM is used under sea water conditions. In this study, the change of slurry condition caused by the inflow of sea water during tunnel excavation with Slurry TBM was investigated and a slurry management guideline was proposed. For this purpose, a laboratory test was carried out based on the slurry management criterions applied in the field, and a method applicable to the field where sea water is affected has been proposed.

An Experimental Study on Shield TBM Tunnel Face Stability in Soft Ground (연약지반에서의 쉴드 TBM 굴착시 막장면 안정성 평가를 위한 실험적 연구)

  • Kim, Yong-Man;Lee, Sang-Duk;Choo, Seok-Yeon;Koh, Sung-Yil
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.1
    • /
    • pp.47-51
    • /
    • 2013
  • In this study, we carried out an experimental shield TBM excavation model test using a down-scale device in soft clay, to understand tunnel-face stability properties in relation to changes in slurry pressure. We performed five tests according to tunnel depth (0.5D, 0.75D, 1.0D, 1.25D, 1.5D), and compared theoretical tunnel-face pressure with model test results. The range in theoretical tunnel-face slurry pressure ($P_{min}{\leq}P_{slurry\;pressure}{\leq}P_{max}$), which is determined by earth pressure and water level, was very similar to the model test result. This result was due to the more isotropic condition of the soft clay ground, than of rocky ground.

Improvement Plan of Excavation Performance Based on Shield TBM Performance Prediction Models and Field Data (쉴드 TBM 성능예측모델과 굴진자료 분석을 통한 굴진성능 개선방안)

  • Jung, Hyuksang;Kang, Hyoungnam;Choi, Jungmyung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.2
    • /
    • pp.43-52
    • /
    • 2010
  • Shield method is the tunnel boring method that propels a steel cylinder in the ground and excavates tunnels at once. After Marc Isambard Brunel started using the method for the Thames Riverbed Tunnel excavation in London, many kinds of TBM (Tunnel Boring Machine) developed and applied for the construction of road, railway, electricity channel, pipeline, etc. In comparison with NATM concept that allows to observe ground condition and copes with difficulty. The machine selected before starting construction is not able to be changed during construction in shield TBM. Therefore the machine should be designed based on the ground survey result and experiment, so that the tunnel might be excavated effectively by controlling penetration speed, excavation depth and cutter head speed according to the ground condition change. This research was conducted to estimate penetration depth, excavate speed, wear of disc cutter on Boondang Railway of the Han Riverbed Tunnel ground condition by TBM performance prediction models such as NTNU, $Q_{TBM}$, Total Hardness, KICT-SNU and compare the estimated value with the field data. The estimation method is also used to analyze the reason of poor excavation efficiency at south bound tunnel.

Relationship Between Net Penetration Rate and Thrust of Shielded TBM in Hard Rock (암반층에서 Shield TBM의 굴착속도와 추력과의 관계)

  • Park, Chul-Hwan;Park, Chan;Jeon, Yang-Soo;Park, Yeon-Jun
    • Tunnel and Underground Space
    • /
    • v.12 no.2
    • /
    • pp.115-119
    • /
    • 2002
  • Four tunnels have been planned to operate a large diameter shielded TBM in Gwangju urban subway construction site. No.1 tunnel has completely been excavated for 13 months operating. Net penetration rate and its relations with thrust farce of the shielded TBM are analysis in this report. This shallow depth tunnel of 536m length is located in soil layers at launching and in hard rocks at ending with 84 m length. The weekly net penetration rates haute dropped down as low as 20∼110 mm/hr in rock while 400∼800 mm/hr in soil. The actual penetration rates we proved to be high as the theoretical penetration rate which is analysis in consideration of conditions of machine and rock. And net penetration rate is investigated to increase linearly thrust force.

Comparative risk analysis of NATM and TBM for mixed-face large-diameter urban tunneling (도심지 대단면 복합지반 NATM 과 TBM 터널공법의 비교위험도 분석)

  • Kim, Young-Geun;Moon, Joon-Shik;Shim, Jai-Beom;Lee, Seung-Bok;Choi, Chang-Rim;Chun, Youn-Chul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.1
    • /
    • pp.19-32
    • /
    • 2011
  • The risk assessment is essential for tunnel design in order to minimize risks associated with uncertainty about geological conditions and tunneling method. This paper provides a comparative risk analysis of a large single bore TBM driven tunnel against sequentially excavated NATM tunnel for a mixed-face large-diameter urban tunnel project near or under a river. The focus of this assessment is on the risks associated with the tunnel excavation methods, in particular whether a TBM or NATM presents more or less risk to achieve the planned excavation duration and bring the project within the estimated bid price. First, the impacts and risks to tunnel construction under each method were discussed, and the risks were scored and ranked in the order of perceived severity and likelihood. Finally, the assessment from a risk based perspective was conducted to decide which alternate tunneling method is more likely to deliver the project with the least time and cost. It is very important to note that this study is only applied to this tunnel project with specific geological conditions and other contract requirements.

이중 터널막을 사용한 엔지니어드 터널베리어의 메모리 특성에 관한 연구

  • Son, Jeong-U;Jo, Won-Ju
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2010.08a
    • /
    • pp.198-198
    • /
    • 2010
  • 전하 트랩형 비휘발성 메모리는 10년 이상의 데이터 보존 능력과 빠른 쓰기/지우기 속도가 요구 된다. 그러나 두 가지 특성은 터널 산화막의 두께에 따라 서로 trade off 관계를 갖는다. 즉, 두 가지 특성을 모두 만족 시키면서 scaling down 하기는 매우 힘들다. 이것의 해결책으로 적층된 유전막을 터널 산화막으로 사용하여 쓰기/지우기 속도와 데이터 보존 특성을 만족하는 Tunnel Barrier engineered Memory (TBM)이 있다. TBM은 가운데 장벽은 높고 기판과 전극쪽의 장벽이 낮은 crested barrier type이 있으며, 이와 반대로 가운데 장벽은 낮고 기판과 전극쪽의 장벽이 높은 VARIOT barrier type이 있다. 일반적으로 유전율과 밴드갭(band gap)의 관계는 유전율이 클수록 밴드갭이 작은 특성을 갖는다. 이러한 관계로 인해 일반적으로 crested type의 터널산화막층은 high-k/low-k/high-k의 물질로 적층되며, VARIOT type은 low-k/high-k/low-k의 물질로 적층된다. 이 형태는 밴드갭이 다른 물질을 적층했을 때 전계에 따라 터널 장벽의 변화가 민감하여 전자의 장벽 투과율이 매우 빠르게 변화하는 특징을 갖는다. 결국 전계에 민감도 향상으로 쓰기/지우기 속도가 향상되며 적층된 유전막의 물리적 두께의 증가로 인해 데이터 보존 특성 또한 향상되는 장점을 갖는다. 본 연구에서는 기존의 TBM과 다른 형태의 staggered tunnel barrier를 제안한다. staggered tunnel barrier는 heterostructure의 에너지 밴드 구조 중 하나로 밴드 line up은 두 밴드들이 같은 방향으로 shift된 형태이다. 즉, 가전자대 에너지 장벽의 minimum이 한 쪽에 생기면 전도대 에너지 장벽의 maximum은 반대쪽에 생기는 형태를 갖는다. 이러한 밴드구조를 갖는 물질을 터널 산화막층으로 하게 되면 쓰기/지우기 속도를 증가시킬 수 있으며, 데이터 보존 능력 모두 만족할 수 있어 TBM의 터널 산화막으로의 사용이 기대된다. 본 연구에서 제작한 staggered TBM소자의 터널 산화막으로는 Si3N4/HfAlO (3/3 nm)을 사용하여 I-V(current-voltage), Retention, Endurance를 측정하여 메모리 소자로서의 특성을 분석하였으며, 제 1 터널 산화막(Si3N4)의 두께를 wet etching 시간 (0, 10, 20 sec)에 따른 메모리 특성을 비교 분석하였다.

  • PDF

TBM segment lining section design of hypothetical subsea tunnels (가상 해저터널 TBM공법 적용 시 세그먼트 단면설계)

  • Choi, Jung-Hyuk;Yoo, Chung-Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.1
    • /
    • pp.49-63
    • /
    • 2015
  • In this paper, the results of evaluation on the member forces in the virtual subsea tunnel lining segments and optimal thickness of the segment with changes in depth were presented. To evaluate member forces on the hypothetical subsea tunnelling cases were developed and the segmental lining member forces were calculated by performing structural analysis using the 2-Ring Beam model. Through a preliminary reinforcement design review of the cross-section using calculated member force, optimal reinforcement design was selected. Based on the results, the variations of member forces with construction conditions such as the cover depth and the hydraulic pressure are presented. In addition, optimum segment lining designs were developed for various tunnelling conditions.

A probabilistic assessment of ground condition prediction ahead of TBM tunnels combining each geophysical prediction method (TBM 현장에서 막장전방 예측기법 결과의 확률론적 분석을 통한 지반상태 평가)

  • Lee, Kang-Hyun;Seo, Hyung-Joon;Park, Jeongjun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.3
    • /
    • pp.257-272
    • /
    • 2016
  • It is usually not an easy task to counter-measure on time and appropriately when confronting with troubles in mechanized tunnelling job-sites because of the limitation of available spaces to perform those actions with the existence of disk cutter, cutter head, chamber and other various apparatus in Tunnel Boring Machine (TBM). So, it is important to predict the ground condition ahead of a tunnel face during tunnel excavation. Efforts have been made to utilize geophysical methods such as elastic wave survey, electromagnetic wave survey, electrical resistivity survey, etc for predicting the ground condition ahead of the TBM tunnel face. Each prediction method among these geophysical methods has its own advantage and disadvantage. Therefore, it might be needed to apply several geophysical methods rather than just one to predict the ground condition ahead of the tunnel face in the complex and/or mixed grounds since those methods will compensate among others. The problem is that each prediction method will give us different answer on the predicted ground condition; how to combine different solutions into a most reasonable and representative predicted value might be important. Therefore, in this study, we proposed a methodology how to systematically combine each prediction method utilizing probabilistic analysis as well as analytic hierarchy process. The proposed methods is applied to a virtual job site to confirm the applicability of the model to predict the ground condition ahead of the tunnel face in the mechanized tunnelling.

TBM tunnelling on Rock

  • Pelizza, Sebastiano;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.2
    • /
    • pp.85-100
    • /
    • 2004
  • In this paper the historical and technological developments of rock TBM and the technical classification of the machines proposed by ITA (International Tunnelling Association) are initially presented. Then the general criteria for the TBMs selection are discussed and at the end the limiting geological conditions for the application of TBMs are analysed.

  • PDF