1 |
KTA (2008), "3rd Mechanized tunnel construction tunnel design service technical conference", KTA, pp. 457-458.
|
2 |
Hong, E.S., Park, H.S., Shin, H.S., Kim, H.M., Ryu, D.W (2008), "A numerical analysis : Effects of hydraulic characteristics of a hazardous zone on the face stability in subsea tunnelling" Journal of Korean Society for Rock Mechanics, Vol. 18, No. 5 pp. 366-374.
|
3 |
Kim, S.H., Par, I.J., Moon, H.K., Shin, Y.S. (2010), "A study on behavioral characteristics of concrete lining based on the equations of relaxed rock loads" Korean Tunnelling and Underground space Association, Vol. 12, No. 6, pp. 443-4450.
|
4 |
Murillo, C.A., Shin, J.H., Kim, K.H., Colmenares, J.E. (2014), "Performance tests of geotextile permeability for tunnel drainage systems" KSCE, Vol. 18, No. 5, pp. 827-830.
|
5 |
Bieniawski, Z.T. (1973), "Engineering rock mass classifications of jointed rock masses", Trans. s Afr. Inst Cv. Eng, Vol. 15, pp. 335-344.
|
6 |
Barton, N., Lien, R., Lunde, J. (1974), "Engineering classification of rock Masses for the design of tunnel support" Rock Mechanics. Vol. 6, No. 4, pp. 189-236.
|
7 |
Sun, J., Zhao, Z., Zhang, Y. (2011), "Determination of three dimensional hydraulic conductivities using a combined analytical neural network model" Tunnelling and Underground space Technology, Vol. 26, pp. 310-319.
DOI
|
8 |
Lee, I.M., Son, Y.J., Park, K.J. (1998), "A3-Dimensional analysis for assessing change of ground-condition ahead of the tunnel face", Journal of Korean Civil Engineering Society, Vol. 18, No. 3-4, pp. 505-519.
|
9 |
Kim, K.S., Kim, Y.S., Yoo, K.H., Park, Y.J., Lee, D.H. (2003), "Prediction of change in ground condition ahead of tunnel face using threedimensional convergence analysis", Tunnel and Underground Space, Vol. 13, No. 6, pp. 476-485.
|
10 |
Yoo, C.S., Kim, S.B. (2006), "Stress-pore pressure coupled finite element modeling of NATM Tunneling", KGS Spring Conference, pp. 189-198.
|
11 |
Oh, B.S., Youn, H.D., Choi, K.H., Im, J.S. (2007), "A study of large diameter shield TBM excavation passing through soo-young riverbed in busan (Busan Subway Line II, Section 230)", KSCE Tunnel Committee Special Conference 27th, pp. 75-95.
|