• Title/Summary/Keyword: TASK project

Search Result 482, Processing Time 0.031 seconds

A Study on the Contingency Model for S/W Development Project Management (S/W 개발 프로젝트 관리를 위한 상황 모형 연구)

  • Hong Myung-Hon;Kim Jeong-Gon;Kim Shin-Kon
    • Journal of Information Technology Applications and Management
    • /
    • v.13 no.2
    • /
    • pp.145-162
    • /
    • 2006
  • Despite the careful attention paid by managers and researchers to the effective administration of the S/W Development Project, there are cases where the project goes over-budget or misses deadlines. Existing research blames these problems on task complexity or mismanagement. In order to verify the results that varied according to the fitness between the Task Characteristics and the Project Management Types, a contingency model was employed. The verification of the contingency model demonstrated that the greater the task complexity, the greater the effectiveness of the project coordination, and the lesser the task complexity, the greater the effectiveness of project control. This research is theoretically important in that it develops a composite model to verify the relation between the three factors of Task Characteristics, Project Management Types, and Project Performance that compose the S/W Development Project.

  • PDF

The Effect on Task Performance Ability of Project Method to Develop Solar Tracking Control System in Specialized High School (특성화고의 태양광 추적 제어 시스템 개발 프로젝트법이 학습자의 과제 수행 능력에 미치는 효과)

  • Han, Yu-Jin;Kim, Bang-Hee;Kim, Jinsoo
    • Journal of Engineering Education Research
    • /
    • v.17 no.1
    • /
    • pp.3-11
    • /
    • 2014
  • The purpose of this study was to verity the effect of project method on the task performance ability in development of a solar-tracking-control-system of specialized high school. In order to carry out this study, 2 classes of technical high school in Jeonbuk are chosen as experimental and control groups. The experimental group was taught by project method and the control group was taught by traditional instruction. Project method was designed by 4 stages-selection of goal, planning, implementation and evaluation. According to these stages, experimental group's students carried out the project that developing solar tracking control system in solar generation. The results of this study are as follows; the project method was more effective than the traditional instruction in planning ability for task performance and implementation ability, subordinates of task performance ability. However, information gathering ability and evaluation ability on task performance, others in subordinates, it is not clear that the project method is more effective.

Construction for the Design Project Management System(DPMS) (디자인 프로젝트 관리 시스템(DPMS)의 구성)

  • 우흥룡
    • Archives of design research
    • /
    • v.12 no.3
    • /
    • pp.227-234
    • /
    • 1999
  • We paid attention to the fact that a project will always tend to increase in size even if its scope is narrowing. The complexities and multidisciplinary aspects of projects require that the many parts should be put together so that the prime objectives- performance, time, and cost- are met. These aspects lead to the use of teams to solve problems that used to be solved by individuals. Firstly, We surveyed the design companies and their clients on the design projects, and categorized the design task into 5 phases, that are marketing, planning, idea development, presentation, and follow-up. Among the phases, the presentation has the most difficult task, longest processing time, and highest cost, whereas idea development phase has relatively low cost, longer processing time, and more difficult task. Most of the companies used to be faced several bottlenecks on their design projects - time control, budget control, and resource control. Secondly, for improving the project managing process, we adopted that dividing and analyzing the sub critical paths may help in the effective managing.(Badiru, Adedeji B., 1995) Some critical paths require almost as much attention as the critical path since they have a high potential of becoming critical when changes occur in the network. Therefrom we suggest the Total task weight(Gt) as a management formula for the design project management.${Gt=\mathrm{T}\ast\leftthreetimes\ast1/100}$<\TEX> ( Gt = Total task weight, mathrm{T} = Task Weight, \leftthreetimes= Criticality ) Thirdly, In order to support to managing for the design projects, we set up an application system, which is graphically planning and implementing a complex undertaking. It is helpful to make the control of a project easy. The DPMS(Design Project Management System), which has two sub system. One is Project Screening System(PSS), and another Project Managing System(PMS). In PMS, we divided the design project into three modules; Project Planning, Project Implementation, and Project Evaluation. As a result, the DPMS will contribute to supply the control of a project easily and effectively. Also teams are used for making decisions and taking action with the DPMS. But we need to get further studies on the relationships between the whole project and its tasks.

  • PDF

R & D 프로젝트 팀의 과업 불확실성, 조직구조, 커뮤니케이선 유형 - 구조적 상황이론

  • ;;Kim, Youngbae
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.17 no.2
    • /
    • pp.53-90
    • /
    • 1992
  • THis study examines a contingency relationship between task uncertainty and structure of project teams in conjunction with the leader-member communication patterns. Multivariate analyses are used to analyze the data from 63 R & D project teams of research laboratory in a large manufacturing corporation. Major findings for this study can be summarized as follows. First, project teams with an organic structure are found to yield high performance when task uncertainty is high, while project teams with a mechanistic structure achieve high performance when their tasks are relatively certain. Second, patterns of leader-member comunication are significantly associated with both task uncertainty and structural characteristics of project teams. This implies that leaders of project teams communicate with their members in more conslutative manner when their tasks are uncertain or when their team structure exhibits organic characteristics. Finally, task uncertainty playus a significant moderating role in the relationship between consultative communication patterns and performance of project teams. Based upon these findings, this study offers several theoretical, practical, and methodological implications.

  • PDF

The Effect of Task Interdependence and User Participation on Software Development Project Performance (업무상호의존성과 사용자참여가 소프트웨어 개발 프로젝트 성과에 미치는 영향)

  • Hong Myung-Hon;Kim Shinkon;Kim Jeonggon
    • Journal of Information Technology Applications and Management
    • /
    • v.12 no.1
    • /
    • pp.213-229
    • /
    • 2005
  • Cost overrun or schedule delay of the software development project happens frequently despite that software developers continue to make every effort for the effective management of the projects. Previous researches have ascertained that these problems are ascribed to the uncertainty of projects and the improper management of the projects. The purposes of this research are to investigate the impacts of user participation and task interdependence on the performance of the projects and also to find out the appropriate project management method to improve the project performance. Even though the model fitness of the path model is proved to be very high, the verification of the hypotheses showed a variety of results including the four verifications and the one refutation of the hypotheses as well as the suggestion of one alternative hypothesis. The contribution of this research is that the integration model is proposed and verified, comprising the relationship among the user participation, the task interdependence, and the performance of software development projects. A project manager can utilize the implication of this research for an effective management of software development project.

  • PDF

Proposal for Improvement on the Task of Construction Project Management Service(CM) for the Customized Service Project of the Public Procurement Service (조달청 맞춤형서비스 사업에 대한 '감독 권한대행 등 건설사업관리용역(CM)' 과업내용 개선방향)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.3-11
    • /
    • 2021
  • The construction project manager must clearly carry out the activities of each construction stage specified in the 'Task Description'. In this study, 'design change' and 'completion process' were classified as core tasks in consideration of the frequency and importance of tasks. And, by analyzing the actual construction project, the task contents for the core work were standardized. This laid the foundation for the ordering office, construction project management technicians, and builders to clearly understand the business areas of construction project management and fulfill their responsibilities for their respective tasks.

Study on Improving of Creativity of Gifted Students using the Project-based Task (프로젝트 수행 활동을 통한 영재들의 창의성 신장에 대한 연구)

  • Yang, Hee-Sun;Hong, Jin-Gu;Shim, Kew-Cheol
    • Journal of Gifted/Talented Education
    • /
    • v.18 no.1
    • /
    • pp.111-137
    • /
    • 2008
  • The purpose of this study is to develop learning materials and teaching model for the gifted, and to examine the improvement of creativity of them in middle schools. Subjects were 126 gifted students, who were the 7th or 8th graders and have been taught in gifted classes of the adjacent Education Institute for the gifted of Boryeong Education Districts, Chungnam Province Office Of Education. Divisions of gifted Classes were logical reasoning, mathematics, foreign language, science. After the instruction of project-based task, gifted students had improved creativity. Especially, instruction using project-based task was more effective on scientifically gifted students. Most gifted students were satisfied with the instruction using project-based task, and attractive in it. Finally, it was suggested that the instruction using project-based task should be actively used for the gifted students.