Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.515-518
/
2006
Construction project has various effective factor and many producer in multifarious process of the work. Thus it has many variation. However, Process management up to now is management method of conclusion oriented. So, it do not consider sequency and variation occurrence. In a result that a lot of problems happen. Lean Construction can solve limit of the present management method. And Lean Construction is estimated new management method of process management for reliance on process plan, safety of process and promotion of effectiveness. This study analysed application of real construction project in Lean Construction theory and examined to utilize VSM and TACT for field application.
Korean Journal of Construction Engineering and Management
/
v.4
no.2
s.14
/
pp.59-65
/
2003
The purpose of this study is to suggest a improved tact planning and scheduling by reliable Toning of work area in high-rise building construction. To do this, the characteristics of main work including electric & mechanical work were considered through the interview with field work forces. The content of the study is focused mainly on reliable work flow and rhythmical repetition of uniform resource quantity to manage effective tact planning & scheduling. And also the study recommends more implement of tact planning and scheduling to manage human resources successfully in repetitive building construction.
Park, Hyung-Gyu;Chung, Jae-Dong;Kim, Charn-Jung;Lee, Joon-Sik;Park, Heui-Jae;Cho, Young-Man;Cho, Hae-Kyun;Park, Deuk-Il
Proceedings of the KSME Conference
/
2000.04b
/
pp.385-391
/
2000
An analysis of the heat transfer in a PDP ventilation chamber has been conducted to investigate the required heat curve and temperature uniformity of the panels. Firstly, experiment in a test chamber has been carried out and compared with the unsteady 3D numerical simulation. Reasonable agreement was found, which suggested that the employed numerical model had its credibility in an actual PDP ventilation process. On this ground, tact-type heating/cooling system was analyzed. The panel temperature was more uniform in the $40^{\circ}C$ tact-type system than in the $80^{\circ}C$ one. Comparison of full simulation of a cart and simplified simulation of one panel shows the panel pitch, which is closely related to a production rate, can be also predicted.
Park, Hyeong-Gyu;Jeong, Jae-Dong;Kim, Chan-Jung;Lee, Jun-Sik;Park, Hui-Jae;Jo, Yeong-Man;Jo, Hae-Gyun;Park, Deuk-Il
Transactions of the Korean Society of Mechanical Engineers B
/
v.25
no.3
/
pp.347-355
/
2001
A heat transfer analysis in a ventilation chamber of Plasma Display Panel(PDP) has been conducted. The process requirement is to precisely follow prescribed temperature trajectory while maintaining temperature uniformity for each panel. Firstly, experiment in a test chamber has been carried out and the results are compared with the unsteady 3D numerical data. Reasonable agreement was found, which suggested that the employed numerical model had its credibility in actual PDP ventilation processes. On this ground, a tact-type heating/cooling system was analyzed. The panel temperature in the 40$^{\circ}C$ tact-type system was more uniform than that in the 80$^{\circ}C$ one. For improving the uniformity of panel temperature, relocation of ventilation head to the rear part and inlet flow control are required. Comparison of full simulation of a cart and simplified simulation of one panel indicates the optimized panel pitch can also be predicted.
Korean Journal of Construction Engineering and Management
/
v.16
no.3
/
pp.36-48
/
2015
To complete various types of finish works with higher quality in much less time, TACT, which was mostly used for high-rise buildings, has been adapted to meet the needs for systematic schedule management in construction sites. However, the effectiveness of adapting TACT has not been shown as expected due to the different perspectives on productivity from both general contractor and subcontractors based on unforeseen conditions according to the types of site. Furthermore, not enough theoretical backgrounds, empirical data, and systematic approaches to solve the fundamental problems caused by each participants' different views on productivity has produced obstacles for establishing effective solutions. Therefore, this research aims to analyze the possible main reasons for having different point of views regarding productivity among various participants of residential building sites using TACT based on literature review, site survey, and interviews. Also, case study was conducted to propose obtainable productivity (OP) regression equation and productivity achievement ratio (PAR) with reduction factors (RFs) and actual productivity (AP) data from an actual construction site. The proposed outcome may assist general contractors converting output management with PPC to productivity management with actual data using PAR. On the other hand, subcontractors would be able to estimate theory-based maximum productivity of construction sites with TACT by using OP. The PAR will enhance the communication between general and sub-contractors for their decision making process. Finally, the main RFs derived from PAR could be used as essential keys for productivity management to increase the economical and operational effectiveness of the construction project.
International conference on construction engineering and project management
/
2005.10a
/
pp.1089-1093
/
2005
Proving the effect of lean construction has yet to be done for its staying poor basic building though there has been efforts and wants to introduce the theory and concept of lean construction in practical site. Therefore, we need to specify the methods of productivity improvement and construction process through various adaptations in the site. Also, to apply such improvement methods systematically, we need active participation of owners, contractors and supply chain members in relation to construction industry and are also require appropriate methods to adapt. At first, this study thinks over the techniques of lean construction that has been verified through studies carried before. For second, it selects the technique of lean construction with the practicality in the construction site. For third, it is aimed to make a manual of lean process management by the use of TACT and V.S.M. For fifth, it will show the method of management for repeated activity and develop a guide-line and procedure that applies the concept of work sequence and resource equalization to each phase of process management. At last, it will show methods of reflecting V.S.M. to improve and grasp the waste factor from the step of managing an activity process and develop the form to analyze the waste in construction site by mapping the value flow.
Journal of the Korean Society of Clothing and Textiles
/
v.46
no.5
/
pp.723-740
/
2022
This study aimed to develop an Arduino-based garment pressure device (APD) on the basis of using Single-Tact sensor by suggesting the reliable clothing pressure range and coefficient of selected sensors through the APD calibration process. Once the APD was validated, the pressure of the experimental men's lower body compression wears was measured using the APD and was compared to the pressure measured using the existing air-pack type pressure meter. The subjects were one mannequin and eight men in their 20's, and the trial compression wears were calf sleeves and pants. Clothing pressures were measured in hip, mid-thigh, calf, and ankle. In terms of the 99% confidence level, the experimental clothing pressure measured at the designated measuring points using the APD was considered identical to the one measured using an existing clothing pressure meter. Therefore, on the basis of the experiment results, this study demonstrated that the APD is as reliable as the existing clothing pressure meter within the pressure ranges of 0.54-16.79 kPa and 0.18-25.47 kPa as provided by the SingleTact sensor supplier's data on the basis of using an external ADC (Analog to Digital Converter) module.
본 논문에서는 습식식각 설비의 Process 동작 간에 발생되는 설비의 비 가동 시간을 최소화하여 Throughput을 향상시키기 위하여 Monitoring 한 결과 Recipe 변경, 액 교환 발생, Tact 변경 등의 공정간 조건에 따라 대기시간이 발생(생산 지연시간 발생) 하는 것을 확인 하고 이를 개선하기 위한 연구이다. 연구 방법으로, Recipe Data 적용 시점을 약액 구간 처리 완료 시점에서 후속 기판이 대기하지 않고 연속 투입을 실시, Chamber Drain과 약액 Tank 전환이 동시에 이루어지고 액 교환 동작 중 Pump Spray의 연속성을 유지하는 무정지 액 교환 Sequence 적용, Tact 적용 시점을 전 기판 배출 확인 후 실시하는 것을 약액 구간 처리 완료 후 적용의 3가지 방법을 6시그마의 DMAIC 기법을 활용하였다. 연구 결과 개선 전 비 가동 시간이 설비 대당 1일 28분 시그마 Level 3.40 이었던 것을 개선 후 설비 대당 1일 17분 시그마 Level 5.3 으로 개선됨을 확인 할 수 있다.
We will introduce our new concept deposition system for SMOLED manufacturing in this conference. This system is designed to deposit organic and metal material to downward to overcome the limit of substrate size and process tact time hurdle for OLED mass production, and is organized with organic deposition chamber, substrate pre-cleaning chamber, metal deposition chamber and encapsulation system. These entire process chambers are integrated with linear type substrate transfer system. We also compare our new SMOLED manufacturing system with conventional vacuum deposition systems, and show basic organic thin film property data, organic material deposition property data, and basic device property.
This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.