A Study on Application of Lean Construction Theory in Schedule Management (린 건설 공정관리이론의 현장적용에 관한 연구)

  • Jung, Joo-Young;Kwon, Won;Park, Sang-Jun;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.515-518
    • /
    • 2006
  • Construction project has various effective factor and many producer in multifarious process of the work. Thus it has many variation. However, Process management up to now is management method of conclusion oriented. So, it do not consider sequency and variation occurrence. In a result that a lot of problems happen. Lean Construction can solve limit of the present management method. And Lean Construction is estimated new management method of process management for reliance on process plan, safety of process and promotion of effectiveness. This study analysed application of real construction project in Lean Construction theory and examined to utilize VSM and TACT for field application.

  • PDF

Improvement of Construction Process management dividing the work area reasonably in Building Construction (작업구역의 합리적 분할에 의한 건축 마감공사의 공정운영 개선)

  • Yoon You-Sang;Joung Young-Kwon;Suh Sang-Wook;Shin Dong-Woo;Kim Chang-Duk;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.59-65
    • /
    • 2003
  • The purpose of this study is to suggest a improved tact planning and scheduling by reliable Toning of work area in high-rise building construction. To do this, the characteristics of main work including electric & mechanical work were considered through the interview with field work forces. The content of the study is focused mainly on reliable work flow and rhythmical repetition of uniform resource quantity to manage effective tact planning & scheduling. And also the study recommends more implement of tact planning and scheduling to manage human resources successfully in repetitive building construction.

The Analysis of the Heat Transfer Characteristic in a PDP Ventilation Chamber (PDP용 배기로내 열전달 현상에 관한 해석)

  • Park, Hyung-Gyu;Chung, Jae-Dong;Kim, Charn-Jung;Lee, Joon-Sik;Park, Heui-Jae;Cho, Young-Man;Cho, Hae-Kyun;Park, Deuk-Il
    • Proceedings of the KSME Conference
    • /
    • 2000.04b
    • /
    • pp.385-391
    • /
    • 2000
  • An analysis of the heat transfer in a PDP ventilation chamber has been conducted to investigate the required heat curve and temperature uniformity of the panels. Firstly, experiment in a test chamber has been carried out and compared with the unsteady 3D numerical simulation. Reasonable agreement was found, which suggested that the employed numerical model had its credibility in an actual PDP ventilation process. On this ground, tact-type heating/cooling system was analyzed. The panel temperature was more uniform in the $40^{\circ}C$ tact-type system than in the $80^{\circ}C$ one. Comparison of full simulation of a cart and simplified simulation of one panel shows the panel pitch, which is closely related to a production rate, can be also predicted.

  • PDF

Heat Transfer Analysis in a PDP Ventilation Chamber (PDP용 배기로내 열전달 현상 해석)

  • Park, Hyeong-Gyu;Jeong, Jae-Dong;Kim, Chan-Jung;Lee, Jun-Sik;Park, Hui-Jae;Jo, Yeong-Man;Jo, Hae-Gyun;Park, Deuk-Il
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.25 no.3
    • /
    • pp.347-355
    • /
    • 2001
  • A heat transfer analysis in a ventilation chamber of Plasma Display Panel(PDP) has been conducted. The process requirement is to precisely follow prescribed temperature trajectory while maintaining temperature uniformity for each panel. Firstly, experiment in a test chamber has been carried out and the results are compared with the unsteady 3D numerical data. Reasonable agreement was found, which suggested that the employed numerical model had its credibility in actual PDP ventilation processes. On this ground, a tact-type heating/cooling system was analyzed. The panel temperature in the 40$^{\circ}C$ tact-type system was more uniform than that in the 80$^{\circ}C$ one. For improving the uniformity of panel temperature, relocation of ventilation head to the rear part and inlet flow control are required. Comparison of full simulation of a cart and simplified simulation of one panel indicates the optimized panel pitch can also be predicted.

TACT Productivity Management for Finish Works of Residential Buildings using Productivity Achievement Ratio (PAR) (공동주택 마감공사 TACT 기법 생산성 관리 - Productivity Achievement Ratio를 활용한 생산성 관리 -)

  • Joo, Seonu;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.36-48
    • /
    • 2015
  • To complete various types of finish works with higher quality in much less time, TACT, which was mostly used for high-rise buildings, has been adapted to meet the needs for systematic schedule management in construction sites. However, the effectiveness of adapting TACT has not been shown as expected due to the different perspectives on productivity from both general contractor and subcontractors based on unforeseen conditions according to the types of site. Furthermore, not enough theoretical backgrounds, empirical data, and systematic approaches to solve the fundamental problems caused by each participants' different views on productivity has produced obstacles for establishing effective solutions. Therefore, this research aims to analyze the possible main reasons for having different point of views regarding productivity among various participants of residential building sites using TACT based on literature review, site survey, and interviews. Also, case study was conducted to propose obtainable productivity (OP) regression equation and productivity achievement ratio (PAR) with reduction factors (RFs) and actual productivity (AP) data from an actual construction site. The proposed outcome may assist general contractors converting output management with PPC to productivity management with actual data using PAR. On the other hand, subcontractors would be able to estimate theory-based maximum productivity of construction sites with TACT by using OP. The PAR will enhance the communication between general and sub-contractors for their decision making process. Finally, the main RFs derived from PAR could be used as essential keys for productivity management to increase the economical and operational effectiveness of the construction project.

LEAN CONSTRUCTION MANAGEMENT OF BPIMT(BUILDIN-CONSTRUCTION PROCESS INNOVATION MANAGEMENT TOOLS & TECHNIQUES) THAT BASED VSM &TACT

  • Sang-Hyuk Lee;Chul-Woo Lim;Chang-duk Kim;Sang-Wook Suh;Yoon-Ki Choi;Jae-Youl Chun;Jung-Ho Yu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1089-1093
    • /
    • 2005
  • Proving the effect of lean construction has yet to be done for its staying poor basic building though there has been efforts and wants to introduce the theory and concept of lean construction in practical site. Therefore, we need to specify the methods of productivity improvement and construction process through various adaptations in the site. Also, to apply such improvement methods systematically, we need active participation of owners, contractors and supply chain members in relation to construction industry and are also require appropriate methods to adapt. At first, this study thinks over the techniques of lean construction that has been verified through studies carried before. For second, it selects the technique of lean construction with the practicality in the construction site. For third, it is aimed to make a manual of lean process management by the use of TACT and V.S.M. For fifth, it will show the method of management for repeated activity and develop a guide-line and procedure that applies the concept of work sequence and resource equalization to each phase of process management. At last, it will show methods of reflecting V.S.M. to improve and grasp the waste factor from the step of managing an activity process and develop the form to analyze the waste in construction site by mapping the value flow.

  • PDF

Reliability Verification of the Clothing Pressure Meter Utilizing the Arduino Board (아두이노 활용 의복압 측정기 제작 및 신뢰도 검증)

  • Kim, Nam Yim;Park, Gin Ah
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.46 no.5
    • /
    • pp.723-740
    • /
    • 2022
  • This study aimed to develop an Arduino-based garment pressure device (APD) on the basis of using Single-Tact sensor by suggesting the reliable clothing pressure range and coefficient of selected sensors through the APD calibration process. Once the APD was validated, the pressure of the experimental men's lower body compression wears was measured using the APD and was compared to the pressure measured using the existing air-pack type pressure meter. The subjects were one mannequin and eight men in their 20's, and the trial compression wears were calf sleeves and pants. Clothing pressures were measured in hip, mid-thigh, calf, and ankle. In terms of the 99% confidence level, the experimental clothing pressure measured at the designated measuring points using the APD was considered identical to the one measured using an existing clothing pressure meter. Therefore, on the basis of the experiment results, this study demonstrated that the APD is as reliable as the existing clothing pressure meter within the pressure ranges of 0.54-16.79 kPa and 0.18-25.47 kPa as provided by the SingleTact sensor supplier's data on the basis of using an external ADC (Analog to Digital Converter) module.

A Study on the Efficiency Improvement of Wet Etching Equipment using 6-Sigma Method (6-시그마 기법을 이용한 습식식각 설비의 효율 개선에 관한 연구)

  • Yu, Jong-Hyeon;Kim, Chang-Eob
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.05a
    • /
    • pp.347-350
    • /
    • 2011
  • 본 논문에서는 습식식각 설비의 Process 동작 간에 발생되는 설비의 비 가동 시간을 최소화하여 Throughput을 향상시키기 위하여 Monitoring 한 결과 Recipe 변경, 액 교환 발생, Tact 변경 등의 공정간 조건에 따라 대기시간이 발생(생산 지연시간 발생) 하는 것을 확인 하고 이를 개선하기 위한 연구이다. 연구 방법으로, Recipe Data 적용 시점을 약액 구간 처리 완료 시점에서 후속 기판이 대기하지 않고 연속 투입을 실시, Chamber Drain과 약액 Tank 전환이 동시에 이루어지고 액 교환 동작 중 Pump Spray의 연속성을 유지하는 무정지 액 교환 Sequence 적용, Tact 적용 시점을 전 기판 배출 확인 후 실시하는 것을 약액 구간 처리 완료 후 적용의 3가지 방법을 6시그마의 DMAIC 기법을 활용하였다. 연구 결과 개선 전 비 가동 시간이 설비 대당 1일 28분 시그마 Level 3.40 이었던 것을 개선 후 설비 대당 1일 17분 시그마 Level 5.3 으로 개선됨을 확인 할 수 있다.

  • PDF

New SMOLED Deposition System for Mass Production

  • Lee, J.H.;Kim, C.W.;Choi, D.K.;Kim, D.S.;Bae, K.B.
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2003.07a
    • /
    • pp.407-410
    • /
    • 2003
  • We will introduce our new concept deposition system for SMOLED manufacturing in this conference. This system is designed to deposit organic and metal material to downward to overcome the limit of substrate size and process tact time hurdle for OLED mass production, and is organized with organic deposition chamber, substrate pre-cleaning chamber, metal deposition chamber and encapsulation system. These entire process chambers are integrated with linear type substrate transfer system. We also compare our new SMOLED manufacturing system with conventional vacuum deposition systems, and show basic organic thin film property data, organic material deposition property data, and basic device property.

  • PDF

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.