This paper defines the Safety Management System (SMS) based on the rail safety act and surveys the status of the English rail SMS and International Civil Aviation Organization (ICAO) SMS and OHSAS18001 SMS. Through the analysis of the domestic rail operators' safety management regulations and the results of the universal rail safety audit, the status and problems of domestic rail operators' SMS are investigated and the improvement scheme are derived. First, to establish the continual improvement system for SMS, the instruction which describe the detailed continual improvement method for each steps of SMS including management review by CEO shall be established. Second, to settle the risk management based SMS, converting the rail operators mind and establishing the supply system of safety risk operating model and basic data for the risk analysis and safety evaluation and including the precise requirement for the risk management in the related instruction should be conducted.
This research conducted an the failure analysis was performed based on the failure and operation data for Seven years using the Reliability, Availability, Maintainability, and Safety(RAMS) constructed at the operation stage after the opening of the D urban railway. therefore, the risk priority was selected for failure frequency component within the door system that showed high failure. Finally, the goal was to suggest ways to improve the door system. For this purpose, the analysis of thermal characteristics of failed components such as Door Control Unit(DCU) in the door system based on the Seven-year failure analysis data of RAMS was performed. These results were applied to the main component exchange cycle of the door unit, the mean time between failure(MTBF) and mean kilometer between failure(MKBF) values of RAMS increased by 26% in 2017-2018 when the improvement measures were taken, and the MTBF value of DCU was 300,000 hours, which was a 57% improvement in reliability. The results of this thesis identify potential enhancements in reliability and improvements in maintenance of the door system that, if implemented, would contribute to train safety and reduce instances of failure in the future.
This paper reviews and classify fault-tree analysis methods developed since 1960 for system safety and reliability. Fault-tree analysis is a useful analytic tool for the reliability and safety of complex systems. The literature on fault-tree analysis is, for the most part, scattered through conference proceedings and company reports. This paper classify the literature according to system definition, fault-tree construction, qualitative evaluation, quantitative evaluation, and available computer codes for fault-tree analysis.
International conference on construction engineering and project management
/
2015.10a
/
pp.255-258
/
2015
Scaffolds are frequently used in construction projects. Despite the impact on the entire safety, scaffolds are rarely analyzed as part of the safety planning. While recent advances in BIM (Building Information Modeling) provides opportunity to address potential safety issues in the early planning stages, it is still labor-intensive and challenging to incorporate scaffolds into current manual jobsite safety analysis which is time-consuming and error-prone. Consequently, potential safety hazards related to scaffolds are identified and presented during the construction phase. The objective of this research is to integrate scaffolds into automated safety analysis using BIM. A safety checking system was created to simulate the movements of scaffolds along the paths of crews using the scaffolds. Algorithms in the system automatically identify safety hazards related to activities working on scaffolds. Then, the system was implemented in a commercially available BIM software program for case studies. The results show that the algorithms successfully identified safety hazards that were not noticed by project managers of the projects. The results were visualized in BIM to facilitate early safety communications.
Purpose: This study was designed to draw up problems with the safety and health diagnosis system, and designed a hierarchical survey model of the clauses prescribed by the Occupational Safety and Health Act. The purpose of the survey is to derive the effectiveness of the safety and health diagnosis system at the construction site by targeting three groups of experts. Method: This paper set up the legal status analysis and overseas related system analysis and AHP hierarchy analysis survey model. In addition, the validity of the analysis results was verified by a survey. Results: The analysis of the survey items showed a high importance on items included in the human utilization and the precision of the pre-plan. In particular, mid-sized construction companies showed the highest importance for their active activities after the safety and health diagnosis. Conclusion: Through this study, we should recognize problems for improving the safety and health system of construction industry and prepare policy and institutional improvement measures for experts.
In this study, safety requirement & criteria for high-speed rail system were developed for safety verification as a national rules and regulations. Safety criteria were presented through analysis of high-speed rail development specification, survey of related regulations for safety requirements. and review of operation compatibility with domestic rail system. Finally, safety rule consist of system safety requirements and safety criteria for technical parts.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2016.05a
/
pp.404-406
/
2016
Due to the localization process of offshore drilling system, ensuring safety has emerged as an important. Therefore, step by stem safety analysis about each development process of offshore drilling system is becoming compulsory. Hazard and operability analysis is a method that was successfully used for system safety analysis in industries such as chemical plants. Through this hazard and operability analysis study, to conduct step by step safety analysis accorsing to process, the study conducted hazard and operability analysis in Lp mud system, an area of offshore drilling system.
The regulatory periodic safety inspection system is one of the most important methods for confirming the safety of nuclear power plants and the defense in depth in nuclear safety is the most important basic means for accident prevention and mitigation. Recently, a new regulatory technology based on risk-informed and safety performance has been developed and used in advanced countries. However, since the domestic periodic inspection system is being used in the same way over 30 years, it is necessary to know how the inspection contributes to the safety confirmation of the nuclear power plants. In this study, the domestic periodic inspection system currently in use was analyzed from the perspective of defense in depth in nuclear safety. In addition, the analysis results were compared to the U.S. NRC's safety inspection system to obtain consistency and lessons in this study. As a result of analysis, the NRC's safety inspections were distributed almost evenly at the all levels of defense in depth, while in the case of domestic inspection, they were heavily focused on the level 1 of defense in depth. Therefore, it appeared urgent to improve the inspection system to strengthen the other levels of defense in depth in nuclear safety.
The purpose of this research is to understand the role of safety climate in the safety management system. Based on the 121 responses from facilities got Occupational Health & Safety Assessment Series (OHSAS) 18000 certification, the results of statistic analysis show that there is significant relationship between safety climate, work attitudes and Organizational Citizenship Behaviors (OCB). The most important finding is the relationship between safety climate and organizational commitment will mediate the relationship.
Purpose: This study aimed to examine the impact of FSSC 22000 food safety management system characteristics on the business performance of food-related companies and to verify the mediating effect of organizational capabilities in the relationship between them. Methods: To achieve this, a survey was conducted among employees of food companies in Seoul and the metropolitan area that have implemented the FSSC 22000 food safety management system, and the following main results were derived. Results: First, the FSSC food safety management system factors, such as measurement/analysis and improve- ment, documentation, management responsibility, and service and product realization, were found to have a significant positive (+) impact on organizational capabilities. The relative impact was in the order of measurement/analysis and improvement, documentation, management responsibility, and service and product realization. Second, organizational capabilities were found to have a significant positive (+) impact on business performance. Third, the FSSC food safety management system factors, such as measurement/analysis and improvement, management responsibility, resource management, and documentation, were found to have a significant positive (+) impact on business performance. The relative impact was in the order of measure- ment/analysis and improvement, management responsibility, resource management, and documentation. Fourth, the factors of management responsibility, resource management, measurement/analysis and improvement, and documentation, excluding resource management factors, were found to have a positive impact on business performance through the mediation of organizational capabilities. Conclusion: The results of this study may provide important implications for the implementation and efficient operation and management of the FSSC 22000 food safety management system in enhancing the business performance of food-related companies.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.