The Systems Engineering Management Plan (SEMP) is the primary, top level technical management document for the integration of all engineering activities at the project plan phase. This document defined the activities to plan, control, and perform overall engineering integration. To develop the SEMP for Railway Safety System, several standards are reviewed and analyzed. And then a common requirement for SEMP preparation is derived from the results of analysis. Also, the SEMP example available practically applies to Railway Safety System. In particular, The SEMP focused on controling technical program management has been organized so far, but in this study the detailed contents of SEMP put stress on project management is derived. And it is related to each other between project management and technical engineering management. At the end, to continuously manage the items and contents of the SEMP, a database management and an automatic document generation system is presented using Computer-Aided Systems Engineering (CASE) tool.
The Systems Engineering Management Plan (SEMP) is the primary, top level technical management document for the integration of all engineering activities at the project plan phase. This document defined the activities to plan, control, and perform overall engineering integration. To develop the SEMP for Railway Safety System, several standards are reviewed and analyzed. And then a common requirement for SEMP preparation is derived from the results of analysis. Also, the SEMP example available practically applies to Railway Safety System. In particular, The SEMP focused on controling technical program management has been organized so far, but in this study the detailed contents of SEMP put stress on project management is derived. And it is related to each other between project management and technical engineering management. At the end, to continuously manage the items and contents of the SEMP, a database management and an automatic document generation system is presented using Computer-Aided Systems Engineering (CASE) tool.
This paper is a study on the practical Systems Engineering Management Plan(SEMP) for the LRT Project. A SEMP shall be developed and applied to define and manage the systems engineering activities during the beginning of LRT Project. This paper is addressed contents and description of the practical systems engineering management plan based on the existing practices about system engineering management plan in LRT Project domain as well as the systems engineering standard as MI-STD 499A, IEEE 1220 etc. In the early stage of a LRT Project, An acquirer should provide a Systems Engineering Plan(SEP), and a contractor should summit a Systems Engineering Management Plan as the SEP in proposal. This addressed the SEMP as an aspect of the system and sub-systems supplier to systematically and effectively accomplish the systems engineering activities in LRT Project generally.
The Systems Engineering, as a methodology for engineering and management of today's ever-growing complex system, is a comprehensive and iterative problem-solving process. The process centers on the analysis and management of the stakeholders' needs throughout the entire life-cycle of a system and searches for an optimized system architecture. There are many essential needs and requirements to be met when a system development task is carried out. Systems Engineering Management Plan(SEMP), as a specification for system development process, must be established to satisfy constraints and requirements of stakeholders successfully and to prevent cost overrun and schedule delay. SEMP defines technical management functions and comprehensive plans for managing and controlling the entire system development process, specialty engineering processes, etc. Especially. in the case of a large-scale complex system development program where various disciplinary engineering such as mechanical; electrical; electronics; control; telecommunication; material; civil engineering etc. must be synthesized, it Is essential to develop SEMP to ensure systematic and continuous process improvements for quality and to prevent cost/schedule overruns. This study will enable the process knowledge management on the subject of SEMP as a core systems engineering management effort, that is, definitely defining and continuously managing specification of development process about requirements, functions, and process realization of it using a computer-aided systems engineering software. The paper suggests a systematic SEMP development process and demonstrates a data model and schema for computer-aided systems engineering software, RDD-100, for use in the development and management of SEMP. These are being applied to the systems engineering technology development task for the next-generation high-speed railway systems in progress.
The Systems Engineering, as a methodology for engineering and management of today's ever-growing complex system, is a comprehensive and iterative problem-solving process. The process centers on the analysis and management of the stakeholders'needs throughout the entire Life-cycle of a system and searches for an optimized system architecture. There are many essential needs and requirements to be met when a system development task is carried out. Systems Engineering Management PLan(SEMP), as a specification for system development process, must be established to satisfy constraints and requirements of stakeholders successfully and to prevent cost overrun and schedule delay. The paper suggests a systematic SEMP development process and demonstrates a data model and schema for computer-aided systems engineering software, RDD-100, for use in the development and management of SEMP These are being applied to the systems engineering technology development task for the next-generation high-speed railway systems in progress.
본 논문은 SE & SW Infra를 활용한 실용적인 시스템엔지니어링관리계획서(SEMP) 템플릿 개발에 관한 연구이다. SEMP는 시스템엔지니어링 업무활동 관리를 위한 최상위 수준의 계획서로서 경량전철 사업 수행 시 국내 실정에 맞도록 개발 하였다. 경량전철사업 수행 시 생성 되는 SEMP를 효과적이고 효율적으로 관리 및 개발하기 위하여 SE & SW 연계 Infra를 구축하였다. 본 논문을 통해서 전산기반의 SE & SW Infra 도구간 통합하는 것을 사례로 제시함으로써 향후 인력, 비용, 일정을 줄일 수 있을 것이다.
On last year's KSR conference, the general of systems engineering technology was introduced on the focus that the SEMP(Systems Engineering Management Plan) being applied for a national project of 'Urban Maglev Program'. Since this SEMP covers very wide work scopes of 'plan, application, control of the program', 'design, analysis, test & evaluation of the system', and 'special engineering activities', it is very important that the tasks and responsibilities of all participants of the project, involving the tasks to collaborate between them, are clearly defined and described. By the point, the updating of SEMP should be done continuously. In this paper, the updating points and typically the management plan of TPM (Technical Performance Measurement), which is more concretely defined, will be explained.
The Railroad Safety Technology R&D Program has been supported by the Ministry of Land, Transport and Maritime Affairs. The Program consists of dozen or more projects and thus is quite complex, which requires effective project management. This paper is discussing how to effectively manage the railroad safety technology R&D program based on systems engineering management plan (SEMP). The key issues dealt in this paper include the SE management, requirements management, verification and validation, integrated data base management, and traceability management. To achieve the goal, we first defined an appropriate SE process to be adopted in the program and the result was documented in the systems engineering management plan. According to the process defined, we set up the environmental frame in database. Using the database and SEMP, each project of the program was verified with respect to the corresponding requirements utilizing the traceability. All these efforts were carried out using a computer-aided SE tool, which enables efficient management of complex database.
System engineering(SE) management techniques applied for space launch system development are introduced to assess the current status and address the effwctiveness of these techniques. Management plans and guides are prepared for the work breakdown structure , data, comfiguration, interface control, Quality assurance, procurement, reliability, risk and verification/validation . Further improvement is required for the system engineering management plan(SEMP) to merge the international cooperation into current engineering managment system.
During the complex systems development, a great deal of data are generated from both the systems engineering process and project management process, and also some data are required to be prepared for the system engineering management plan (SEMP). For the successful completion of the project, it is necessary to effectively manage all the data in order to maintain data consistency and traceability. To fulfill the necessity, this paper introduces the concept of an integrated data architecture and discusses its realization with $Cradle^{(R)}$(a computer aided systems engineering tool). Also, it was described how to automate the production of the SEMP in that working environment. The result of the approach, managing complex data efficiently in the systems engineering view, has been successfully applied in the Railway Safety Development Program.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.