• Title/Summary/Keyword: Synchronization Test

Search Result 165, Processing Time 0.033 seconds

Synchronization and identification of ship shaft power and speed for energy efficiency design index verification

  • Lee, Donchool;Barro, Ronald Dela Cruz;Nam, Jeonggil
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.2
    • /
    • pp.123-132
    • /
    • 2014
  • The maritime sector is advancing with dedicated endeavor to reduce greenhouse gas in addressing issues with regards to global warming. Since 01 January 2013, the International Maritime Organization (IMO) regulation mandatory requirement for Energy Efficiency Design Index (EEDI) has been in place and should be satisfied by newly-built ships of more than 400 gross tonnage and the Ship Energy Efficiency Management Plan (SEEMP) for all ships type. Therefore, compliance to this necessitates planning during the design stage whereas verification can be carried-out through an acceptable method during sea trial. The MEPC-approved 2013 guidance, ISO 15016 and ISO 19019 on EEDI serves the purpose for calculation and verification of attained EEDI value. Individual ships EEDI value should be lower than the required value set by these regulations. The key factors for EEDI verification are power and speed assessment and their synchronization. The shaft power can be measured by telemeter system using strain gage during sea trial. However, calibration of shaft power onboard condition is complicated. Hence, it relies only on proficient technology that operates within the permitted ISO allowance. On the other hand, the ship speed can be measured and calibrated by differential ground positioning system (DGPS). An actual test on a newly-built vessel was carried out to assess the correlation of power and speed. The Energy-efficiency Design Index or Operational Indicator Monitoring System (EDiMS) software developed by the Dynamics Laboratory-Mokpo Maritime University (DL-MMU) and Green Marine Equipment RIS Center (GMERC) of Mokpo Maritime University was utilized for this investigation. In addition, the software can continuously monitor air emission and is a useful tool for inventory and ship energy management plan. This paper introduces the synchronization and identification method between shaft power and ship speed for EEDI verification in accordance with the ISO guidance.

End-to-end Delay Analysis and On-line Global Clock Synchronization Algorithm for CAN-based Distributed Control Systems (CAN 기반 분산 제어시스템의 종단 간 지연 시간 분석과 온라인 글로벌 클럭 동기화 알고리즘 개발)

  • Lee, Hee-Bae;Kim, Hong-Ryeol;Kim, Dae-Won
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.677-680
    • /
    • 2003
  • In this paper, the analysis of practical end-to-end delay in worst case is performed for distributed control system considering the implementation of the system. The control system delay is composed of the delay caused by multi-task scheduling of operating system, the delay caused by network communication, and the delay caused by the asynchronous between them. Through simulation tests based on CAN(Controller Area Network), the proposed end-to-end delay in worst case is validated. Additionally, online clock synchronization algorithm is proposed here for the control system. Through another simulation test, the online algorithm is proved to have better performance than offline one in the view of network bandwidth utilization.

  • PDF

DTV Lip-Sync Test Using Embedded Audio-Video Time Indexed Signals (숨겨진 오디오 비디오 시간 인덱스 신호를 사용한 DTV 립싱크 테스트)

  • 한찬호;송규익
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.41 no.3
    • /
    • pp.155-162
    • /
    • 2004
  • This paper concentrated on lip synchronization (lip sync) test for DTV with respect to audio and video signals using a finite digital bitstream In this paper, we propose a new lip sync test method which does not effect on the current program by use of the transient effect area test signals (TATS) and audio-video time index lip sync test signals (TILS).the experimental result shows that the time difference between audio and video signal can be easily measured by captured oscilloscope waveform at any time.

A simulation test of lone rejection for steam turbine generator in nuclear power plant (원자력발전소 증기터빈 발전기의 부하차단 모의시험)

  • Choi, In-Kyu;Jeong, Tae-Woon;Lee, Ki-Seong
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2301-2303
    • /
    • 2003
  • A steam turnine in thermal/nuclear power plant drives generator and maintains it at rated speed using high temperature and high pressure steam energy. After synchronization in parallel with the power system, generator output increases according as the governor, that is the controller, increases steam flow into turbine. By the way, as the steam flow into turbine can not be reduced fast even though the electrical load is lost, the turbine gets into dangerous situation due to the increase of its speed. At this time, the duty of the turbine governor is to limit the speed to its overspeed trip setpoint by stopping the steam flow as soon as possible, the test of which is called load rejection test. It is introduced in this paper for a simulation test of generator load rejection to be implemented on the turbine governor in a 600MW nuclear power plant before its startup.

  • PDF

A Simulation Test of Load Rejection for Steam Turbine Generator in a 680MW Nuclear Power Plant (680MW 원자력발전소 증기터빈 발전기의 부하차단 모의시험)

  • Choi, In-Kyu;Jeong, Chang-Ki
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1605-1606
    • /
    • 2007
  • An electrical generator in power plant is driven and maintained its speed at rated by steam turbine. By the way, after synchronization in parallel with the power system, as the steam flow into turbine can not be reduced fast even though the electrical load is lost, the turbine gets into dangerous situation due to the increase of its speed. At this time, the duty of the turbine governor is to limit the speed to its overspeed trip set point by stopping the steam flow as soon as possible, the test of which is called load rejection test. It is introduced in this paper for a field simulation test of generator load rejection to be implemented on the turbine governor in a 680MW nuclear power plant before its startup.

  • PDF

An Integrated Development Environment for SyncML Server Applications (SyncML 서버 응용 개발을 위한 통합 개발 환경)

  • Lee, Ji-Yeon;Choi, Hoon
    • The KIPS Transactions:PartA
    • /
    • v.11A no.1
    • /
    • pp.37-48
    • /
    • 2004
  • The SyncML, the standard synchronization protocol, supports the synchronization of various application services between a client and a server such as an address book, a calendar. Even with this standard protocol, SyncML application developers usually spend a long time and efforts implementing service specific logics and databases. This paper designed and implemented the SDE(Service Development Environment) which is an integrated development environment for SyncML server developers to develop an application service rapidly and correctly. The SDE consists of two components i.e., the Sync Library and the SEG(Sync Engine Generator) tool. To prove the applicability of this study we implemented a SyncML server by using the SDE and also carried out the correctness tests and the performance test. We hope this system helps developers implement mobile application services more efficiently.

Mobile Camera Processor Design with Multi-lane Serial Interface (멀티레인을 지원하는 모바일 카메라용 직렬 인터페이스 프로세서 설계)

  • Hyun, Eu-Gin;Kwon, Soon;Lee, Jong-Hun;Jung, Woo-Young
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.44 no.7 s.361
    • /
    • pp.62-70
    • /
    • 2007
  • In this paper, we design a mobile camera processor to support the MIPI CSI-2 and DPHY specification. The lane management sub-layer of CIS2 handles multi-lane configuration. Thus conceptually, the transmitter and receiver have each independent buffer on multi lanes. In the proposed architecture, the independent buffers are merged into a single common buffer. The single buffer architecture can flexibly manage data on multi lanes though the number of supported lanes are mismatched in a camera processor transmitter and a host processor. For a key issue for the data synchronization problem, the synchronization start codes are added as the starting for image data. We design synchronization logic to synchronize the received clock and to generate the byte clock. We present the verification results under proposed test bench. And we show the waves of simulation and logic synthesis results of the designed processor.

Efficacy of a Cue-Mate Intravaginal Insert and Injection of Prostaglandin $F_{a{\alpha}}$ for Synchronizing Estrus in Hanwoo Cattle

  • Cho, Sang-Rae;Kumar, Kuldeep;Yeon, Seong-Heum;Lee, Sung-Hwan;Kim, Ui-Hyung;Chung, Ki-Yong;Kim, Hyeon-Shup;Lee, Myeung Sik;Park, Chang-Seok;Yang, Byoung-Chul
    • Journal of Embryo Transfer
    • /
    • v.29 no.4
    • /
    • pp.321-325
    • /
    • 2014
  • The present study was performed on farm animals to test the effectiveness of progesterone-releasing intravaginal device (Cue-Mate$^{(R)}$ 1.56 g) and injection of prostaglandin $F_{2{\alpha}}$ ($PGF_{2{\alpha}}$) for synchronization estrus in Hanwoo cattle. The cattle were at random stage of the estrus cycle. The cows were artificially inseminated at day 7 after Cue-Mate withdrawal, using commercial semen from Korean native bulls. There was a season effect on the estrus synchronization rate. It was higher in spring (94.3%) followed by winter (93.3%), autumn (90.4%) and summer (67.2%). In summary, The results of this study revealed that season has influences on estrus behavior of cattle with no significant effect on pregnancy rate. In summary, we suggest summer reproductive management to alleviate the effects of heat stress. It should be based on intensive cooling combined with hormonal treatment. Given that different subgroups of cows benefit differently from the treatments, selective hormonal administration should be considered.

Study of Analysis Technique of Flight Compatibility Test Data using Instrumented Pod for External Store (외부장착 계측포드를 사용한 비행적합성 자료 분석기법 연구)

  • Kim, Jong-Heon;Jun, Oo-Chul;Jun, Seung-Moon
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.33 no.8
    • /
    • pp.105-110
    • /
    • 2005
  • Analysis technique of flight compatibility test results using instrumented pod for external store is studied. Raw data of sensors and MIL-STD-1553B acquired from instrumented pod are analyzed separately. Besides, tuning and synchronization of sensor data enable the analysis of those two type of data simultaneously. Evaluation of analysis result shows that the analyzed data represent maneuvers of the aircraft successfully and agree the values of the real flight tests.

Improved Phase and Harmonic Detection Scheme using Fast Fourier Transform with Minimum Sampling Data under Distorted Grid Voltage (최소 샘플링의 고속푸리에 변환을 이용한 비정상 계통의 향상된 위상추종 및 고조파 검출 기법)

  • Kim, Hyun-Sou;Kim, Kyeong-Hwa
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.20 no.1
    • /
    • pp.72-80
    • /
    • 2015
  • In distributed generation systems, a grid-connected inverter should operate with synchronization to grid voltage. Considering that synchronization requires the phase angle of grid voltage, a phase locked loop (PLL) scheme is often used. The synchronous reference frame phase locked loop (SRF-PLL) is generally known to provide reasonable performance under ideal grid voltage. However, this scheme indicates performance degradation under the harmonic distorted or unbalanced grid voltage condition. To overcome this limitation, this paper proposes a phase and harmonic detection method of grid voltage using fast Fourier transform (FFT). To reduce the calculation time of FFT algorithm, minimum sampling data is taken from the voltage measurement to determine the phase angle and the magnitude of harmonic components. An experimental test setup for a grid-connected inverter system has been constructed. By comparative simulations and experiments under various abnormal grid voltage conditions, the proposed scheme has been proven to effectively track the phase angle of the grid voltage.