• Title/Summary/Keyword: Survey method

Search Result 10,044, Processing Time 0.037 seconds

Suggest on Standardization of Ecological Survey Methods in the Korean Watershed (한국연안에서의 해양생물 생태 조사방법 표준화)

  • 이재학
    • Korean Journal of Environmental Biology
    • /
    • v.22 no.1
    • /
    • pp.1-11
    • /
    • 2004
  • Ecological methods were reviewed through reports such as environmental impact assessment and damage effect of fishery in the Korean watershed. Survey items in marine ecological field were included: phytoplankton, zooplankton, benthic animal, algae, adult fish, egg and juvenile of fish. A standardization of survey method in the field of community ecology was suggested to consider the convenience, Sequency in Use of device, accuracy of data collected from that. It is necessary that spatial data should be sufficiently acquired toy statistical analysis of biodiversity and spatial comparison. Quantitative sampling method must be inevitably adopted based nature of biota and geographical type of the survey area. The same sampling method can make the data compared spatially but can't be applicable in all area. Standardizing survey method should be by no means under certain restriction of study and would become different according to survey environments. The first thing is minutely understanding about ecological character of biota inhabiting in certain area, and then determining survey method.

Analysis of optimized survey methods for tunnel construction using IT (터널 정보화 시공을 위한 계측 최적방안 분석)

  • Choi, Won-Il;Cho, Kook-Hwan;Park, Sung-Wook
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.941-946
    • /
    • 2008
  • D&B method in tunnel construction requires accurate and rapid measurement of the ground movement, which of essential for feedback analysis. Recently, survey technique adapting IT is getting more and more emphasized in the field of construction and tunnel survey also follow the same trend. Case study and adaptability of IT technique for tunnel survey will be discussed in this study. The application of laserscannig method in the field of tunnel construction was reported in several advanced country including Austria and Japan. Survey for the crown and shoulder movements by IT survey method was conducted and the results were compared to those do the conventional method. The pipe-roof, grouting, ring-cut are installed in the this site to prevent expected large ground settlement. The result show that laserscanner system is prefered rather than conventional method in that better understanding for the displacement condition and origin condition was liable by the lasersacnnig method. IT survey solution makes if possible to execute more economic and safe construction.

  • PDF

Precise Surveying of Ship Launching Distance Using RTK-GPS (RTK-GPS를 이용한 선박진수거리 정밀측량)

  • 장용구;송석진;강인준
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2004.03a
    • /
    • pp.455-461
    • /
    • 2004
  • Now, GPS survey is used on equipment from leisure to precise geodetic survey and nation admits the result of GPS survey. When surveyors perform precise GPS survey, they use post processing method but they greatly use real time processing method to consider field status. Especially, when surveyors measure the result of moving target, they use real time GPS survey to the best method. For this study, the author precisely surveyed distance of ship launching from shipyard on real time using real time precise GPS method. In this paper, the author compares and examines the accuracy of first real time precise GPS survey method nationally and the capability on use. And the author performed real time precise GPS survey in NOKBONG and 21C shipyard positioning at GEOJEDO.

  • PDF

Utilization of IT Survey Method in the National Statistics Survey (국가통계조사에서의 IT조사방법 활용에 대한 연구)

  • Shim, Kyu-Ho;Lee, Eui-Kyoo
    • Survey Research
    • /
    • v.10 no.2
    • /
    • pp.137-161
    • /
    • 2009
  • Survey environment has recently been changed along with its bad conditions. Surveyors feel difficult to meet respondents because the number of one person-household and working-together-household has rapidly increased. With a growing awareness of protecting personal information, respondents no longer want to response to a questionnaire. To get responses form an increasing number of non-response houses and respondents who are difficult to meet, Korea National Statistical Office(KNSO) has changed its survey methods and thus introduced new survey methods, free from face-to-face interviews. A telephone interview has officially been allowed for some reasonable situations and it shows a tendency that the trend of interviewing method is moving toward Internet survey. This paper focuses on how survey methods should be changed with the use of IT in response to changes in the survey environment. Survey methods combined with IT have many excellent advantages, Korea has been an enviable World IT contest for a long time. If Korea can apply such an advanced IT environment to survey methods successfully, it will make a great contribution toward improving the survey quality. This paper also reviews which survey method is most appropriate for National Statistics as the survey environment has changed.

  • PDF

Research for the survey of method to serviced customer Interruption cost evaluation (전력수용가 정전비용 산출물 위한 설문조사 방법론에 관한 연구)

  • Park, Soo-Man;Kim, Jae-Chul;Moon, Jong-Fil;Bae, Ju-Chun
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.259-261
    • /
    • 2002
  • KEPCO(Korea Electric Power Corporation) has been management alone before some time. However through the electrical industry reorganization generation and KPX(Korea Power Exchange) were separated on 2001. A marketing and distribution part will be separated in the future. While many problem for appear in future. how to management for power system network is important. unfortunallity, electrical power industry is starting point right now. Thus, detail data is incomplete for this field and detail research for this field is required with distribution reorganazation. In this paper suggest for customer interruption cost compute method to establish a standard. The standard is need to security operation of power system network. The customer interruption cost compute method necessity of customer interruption cost compute method is minimizing process for total cost. As final total cost compute through the interruption cost compute, we can recognize investment point exactly. We cited foreign survey questions, because exactly matched survey questions for in the country circumstance is not exist. And process to survey performance suggest after modify for match in the country circumstance. Survey questions that suggested fer this paper are classified five categories. This paper suggests to detail survey questions and survey method before survey and suggest to how to customer interruption compute when survey data is ensured. Moreover this paper suggest to average interruption cost compute for residential customer using statistical method.

  • PDF

Development of Practical Investigation and Diagnosis Model in Rural Villages(II) - Development of Efficient Application Procedures and Investigation Methodologies - (농촌마을의 실증적 조사·진단기법 개발(II) - 효율적 적용절차 및 조사방법론 개발 -)

  • Koo, Hee-Dong;Park, Mi-Ran;Kim, Dae-Sik
    • Journal of Korean Society of Rural Planning
    • /
    • v.27 no.4
    • /
    • pp.109-122
    • /
    • 2021
  • The purpose of this study is to develop a application procedure and survey method for the empirical diagnostic indices system. In order to know the survey method, which has 65 investigation items for 52 indicators, this study not only presented so that the each survey items could be surveyed in at least 1 to 3 steps, but also presented the 4 survey method for each investigation items: preliminary survey, administrative survey, field survey, and interview survey. As a result of applying to 15 sample villages, the period of surveying a village of 100 households was 1.4 days, and it was confirmed that the survey was generally efficient in a short time. As a result of applying the survey system to the sample village, the developed survey system showed the possibility of investigating even the details of rural villages. Therefore, it was judged that it could be used as a basic procedure for a rural village unit survey.

The Study on the Survey Technique and a Development of Measuring Method about a Wooden Pattern of the Small Vessel (소형선박 완성목형의 검사기법 및 측정방법 개발에 관한 연구)

  • +Jeong, Yong-Geun;Kang, Dae-Sun;Ku, Hyoun-Mo;Lee, Ki-Dong
    • Journal of Korea Ship Safrty Technology Authority
    • /
    • s.23
    • /
    • pp.65-77
    • /
    • 2007
  • This study is about the survey technique and the development of measuring method about a wooden pattern of the small vessel made by CNC Machine. we will propose a survey method about processing grade, objectivity of survey, an external shape and a surface defect survey method, Furthermore, CMM(Coordinate Measuring Machine) and OMM(On Machine Measurement).

  • PDF

A Study on DEM-based Automatic Calculation of Earthwork Volume for BIM Application

  • Cho, Sun Il;Lim, Jae Hyoung;Lim, Soo Bong;Yun, Hee Cheon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.38 no.2
    • /
    • pp.131-140
    • /
    • 2020
  • Recently the importance of BIM (Building Information Modeling) that enables 3D location-based design and construction work is being highlighted around the world. In Korea, the road map has been established to settle the design based on BIM using drone survey results by 2025. As the first step, BIM would be applied to road construction projects worth more than 50 billion Korean Won from 2020. On the other hand, drone survey regulation has been enacted and the data for drone survey cost were also included on Standard of construction estimate in 2020. However, more careful improvement is required to reflect drone survey results in BIM design and construction. Currently, Engineering instructions and Standard of construction estimate specifies that earthwork volume must be calculated by cross section method only. So it is required to add the method of DEM (Digital Elevation Model) based volume calculation on these regulations to realize BIM application. In order for that, this study verified the method of DEM based earthwork volume calculation. To get an accurate DEM for accurate volume computation, drone survey was carried out according to the drone survey regulation and then could get an accurate DEM data which have errors less than 3cm in X, Y and 6.8cm in H. As each DEM cell has 3D coordinate component, the volume of each cell can be calculated by obtaining the height of area of the cell then total volume is calculated by multiplying total number of cells by volume of each cell for the construction area. Verification for the new calculation method compare with existing method was carried out. The difference between DEM based volume by drone survey and cross section based volume by traditional survey was less than 1.33% and it can be seen that new DEM method will be able to be applied to BIM design and construction instead of cross section method.

A STUDY ON THE STORE SEPARATION PREDICTION TECHNIQUE USING GRID SURVEY METHOD (GRID SURVEY 방법을 이용한 무장분리예측 기법 연구)

  • Kim, Sang-Jin;Kang, In-Mo;Kim, Myung-Seong
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2006.10a
    • /
    • pp.136-141
    • /
    • 2006
  • A prediction of store separation trajectory using grid survey method has been conducted. For the grid survey method, store's aerodynamic flowfield data such as freestream and grid data is needed to solve 6 degree of freedom(6-DOF) equations of motion. In the presented study, aerodynamic flowfield data was generated by Euler solver instead of CTS wind tunnel test. The predicted trajectories shows good agreement with CTS test results.

  • PDF

A Study on Cost Reduction Effect of Drone Implementation in Traffic Survey (교통조사부문 드론 활용시 비용절감효과 분석 연구)

  • Kim, Dongjun;Ahn, Hyosub;Kim, Jin-tae
    • International Journal of Highway Engineering
    • /
    • v.20 no.4
    • /
    • pp.73-84
    • /
    • 2018
  • PURPOSES : Most of the traffic surveys are carried out by an inspection method by the manpower. In some cases, the video equipment is used only in some regions when the traffic volume is surveyed. In this case, there is environmental restriction that the road equipment to fix the video equipment should exist. Also, in areas where information such as digital maps and satellite photographs is old or not provided, they are forced to rely on manpower research, but it is difficult to put huge amounts of time and money into the research in places where labor supply and demand is difficult. This difficulty is particularly pronounced in overseas business. METHODS : The purpose of this study is to improve the efficiency of business by using the drones in the traffic investigation through analysis of the cost reduction effect between the existing method and the proposed method in the overseas business traffic survey. The scope of the research is limited to the scope of research, and based on the case of overseas projects, the method of using drone for each research sector is suggested. RESULTS : In the traffic condition survey section, we propose the use of drone for traffic survey and queue length survey, and it is confirmed that there is a cost saving effect of 16% ~ 27% compared with the existing method. In the road condition survey, we propose the use of drones for road surface linear survey, geometry survey, and obstacle survey, and it was confirmed that the cost reduction effect is 39% ~ 93% compared to the existing method. CONCLUSIONS : In addition to overseas business, it is expected that it will have a positive effect on research time and cost reduction by using drone in traffic survey in domestic area where labor supply is not easy or basic data is insufficient.