• Title/Summary/Keyword: Surplus electric power

Search Result 39, Processing Time 0.026 seconds

Study on the Power-Grid Impact and Optimal Charging Control Strategy with PHEV Market Penetration (PHEV 시장 형성 시 전력망에 미치는 영향 및 최적 충전 제어 전략에 관한 연구)

  • Roh, Chul-Woo;Kim, Min-Soo
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.33 no.4
    • /
    • pp.278-287
    • /
    • 2009
  • Plug-in hybrid electric vehicle (PHEV) with capability of being recharged from the power-grid will reduce oil consumption. Also, the PHEV will affect the utility operations by adding additional electricity demand for charging. In this research, the power-grid impact by demand of PHEV charging is presented and the optimal charging control strategy for utility operators is proposed with simulated data. The penetration of PHEV is assumed to be 50% in the circumstances of Korean passenger car market and Korean power-grid market limitedly. To obtain smooth load shape and utilize the surplus electricity in power-grid at midnight and dawn, the peak of charging demand should be controlled to be located before 4:00 a.m., and the time slot which can supply the electricity power to PHEV should be allowed between 1:00 a.m.$\sim$7:00 a.m.

DC-DC Converter for Integrated Voltage Control Method (전압 적분 제어법에 의한 DC-DC 컨버터)

  • 이현우;서기영
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.18 no.10
    • /
    • pp.1590-1597
    • /
    • 1993
  • Power conversion system generally requires bidirectional converter. A storage energy of reactor is suppressed by regeneration of surplus electic energy in converter to power source. When an electric isolation in the power conversion system is required. the most suitable position for the isolation is the DC-Link part. A transformer in the DC part is minimized because of high repetition frequency. This paper proposes that power conversion system becomes bidirectional DC-DC converter with electric isolation by intergrated voltage control method. It is intergrated voltage control that makes system construciton simple, has control errow little quantity ans gets output response Quick. And the power-switches which should be operated is selected automatically without a detection of the current-direction.

  • PDF

Simulation study of a regenerative inverter for absorption of regenerative energy in a DC traction substation (도시철도직류변전소의 회생전력 흡수를 위한 회생인버터 시뮬레이션)

  • Bae C. H.;Han M. S.;Kim Y. G.;Kwon S. Y.;Park H. J.
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.705-711
    • /
    • 2005
  • In DC traction substation with 12-pulse diode rectifiers, the DC line voltage tends to rise above noload voltage because it can't absorb the regenerative power caused by electric brakes of train. To solve this problem, an IGBT regenerative inverter should be installed and recycles the surplus regenerative power by delivering it. to the supply grid. In this paper, the DC traction substation equipped with a IGBT regenerative inverter is studied using computer simulation. Matlab/simulink is used to simulate the operation of regenerative inverter which injects the regenerative power into the supply grid and stabilizes the DC line voltage. It is confirmed that the high quality regenerative power is delivered to the supply grid thorough computer simulation.

  • PDF

Simulation study of a grid-connected inverter for absorption of regenerative energy in a DC traction substation (도시철도 직류변전소의 회생전력흡수를 위한 계통연계형 인버터 시뮬레이션)

  • Bae, C.H.;Han, M.S.;Jung, H.S.;Kim, Y.K.;Park, H.J.
    • Proceedings of the KIEE Conference
    • /
    • 2005.10c
    • /
    • pp.279-281
    • /
    • 2005
  • In DC traction substation with 12-pulse diode rectifiers, the DC line voltage tends to rise above noload voltage because it can't absorb the regenerative power caused by electric brakes of train. To solve this problem, an IGBT regenerative inverter should be installed and thus recycles the surplus regenerative power by delivering it to the supply grid. In this paper, the DC traction substation equipped with a IGBT regenerative inverter is studied using computer simulation. Matlab/simulink is used to simulate the operation of regenerative inverter which injects the regenerative power into the supply grid and stabilizes the DC line voltage. It is confirmed that the high quality regenerative power is delivered to the supply grid thorough computer simulation.

  • PDF

Reduction of the Unbalanced Three Phase Input Current by Variable Notch Filter in Active AC Electronic Load (가변 노치필터에 의한 능동형 AC 전자부하의 3상 전류 불평형 저감)

  • Kim, Do-Yun;Lee, Jung-Hyo;Lee, Yong-Seok;Jung, Doo-Yong;Jung, Yong-Chae;Won, Chung-Yuen
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.17 no.2
    • /
    • pp.158-165
    • /
    • 2012
  • In this paper, the test bed using three-phase PWM converter connected with single phase inverter in series is set up to configure an active AC electric load. Since the two topologies, three-phase PWM converter and single-phase inverter, can be operated bidirectionally, the system not only re-generates surplus power to grid but also prevents power dissipation. However, the construction of system has a drawback. That is, ripple components two times of inverter operation frequency occur at DC-Link due to cascade connection, it can be cause of three phase unbalance Since the operational characteristic of the active AC electric load, the power frequency entered into the electric load can be varied, and the ripple of DC-Link is changed as well. In this paper, the three-phase PWM converter using a variable notch filter is proposed, and the reduction of three-phase current unbalance is presented. the validity of the proposed PWM converter using a variable notch filter is verified by the simulation and experimental results.

A Study on Determining an Appropriate Power Trading Contracts to Promote Renewable Energy Systems

  • Choi, Yeon-Ju;Kim, Sung-Yul
    • International Journal of Precision Engineering and Manufacturing-Green Technology
    • /
    • v.5 no.5
    • /
    • pp.623-630
    • /
    • 2018
  • The renewable energy systems have been in the spotlight as an alternative for environmental issues. Therefore, the governmental policies are being implemented to spread of promote power generation system using renewable energy in various countries around the world. In addition, Korea has also developed a policy called the power trading contract which can profit from electricity produced from renewable power generation system through Korea Electric Power Corporation (KEPCO) and Korea Power Exchange (KPX). As a result, the power trading contracts can trade power after self-consuming in-house by using small-scale renewable power system for residential customers as well as electricity retailers. The power trading contracts applicable as a small-scale power system have a 'Net metering (NM)' and a 'Power Purchase Agreement (PPA)', and these two types of power trading contracts trade surplus power, but payment method of each power trading is different. The microgrid proposed in this paper is based on grid connected microgrid using Photovoltaic (PV) system and Energy Storage System (ESS), that supplied power to residential demand, we evaluate the operation cost of microgrid by power demand in each power trading contracts and propose the appropriate power trading contracts according to electricity demand.

Measurement and Analysis of Regenerative Energy in DC 1500V Electric Traction Substation (직류 1500V 전철변전소의 회생전력량 측정 및 분석)

  • Bae, Chang-Han;Jang, Dong-Uk;Kim, Ju-Rak;Han, Moon-Seub;Kim, Yong-Ki
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.717-722
    • /
    • 2007
  • Most of DC 1500V electric railway substations have adopted diode rectifiers to supply stable DC power. However, the diode rectifiers operate in the first quadrant of the voltage-current plane and thus need regenerative inverters which transfer the surplus regenerative power caused by regenerative braking of electric train sets into the grid. In order to select the proper capacity and installation position of regenerative inverter, it needs to investigate the consumed and regenerative energy of the electric traction substations in advance. This paper presents an analysis of regenerative energy in two substations operating in Seoul Seolleung and Kwangju Yangdong substations. DC line voltage and feeder currents are measured for a day to calculate consumed and regenerative power far four feeders. We calculated an amount of regenerative energy consumed in other feeders and estimated the cost reduction in energy consumption due to the reuse of regenerative energy

A Study on the Convective Heat Transfer in a Regenerative Ice Energy System by a Bundle of the Heat-pipes. (히이트파이프 다발을 이용한 냉축열시스템에서의 대류열전달에 관한 연구)

  • 권형정;김경석;김경근
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.14 no.4
    • /
    • pp.57-66
    • /
    • 1990
  • In the design of an electric power plant, the capacity to meet the peak load demand is one of the important factors to be considered. This peak load usually occurs when the most of the cooling air conditioning systems are being operated during daytime in summer season, which inevitably entails the construction of an additional electric power plant. This study is aimed to carry out a basic experiment for the development of a cooling air conditioning system using the ice energy by the surplus electric power during the night-time. The experimental apparatus consists of four major parts; (1) the heating section consisting of the air duct and I.D. fan, (2) the cold section with the ice chamber, (3) the bundle of heat pipes made in a form of the staggered arrangement with ${C_y}/{d_o}$=2.0 and ${C_x}/{d_o}$=1.73, (4) the refrigerator system to cool down the ice chamber. This study involves an intensive experiment concerning the convective heat transfer of the air flow surrounding the bundle of heat pipes. This major experimental parameters are the amount of working fluid, the velocity of air and the working temperature. The major findings of the present study are as follows; (1) The optimum amount of the working fluid necessary for the horizontal heat pipes is much more than that for the vertical type. (2) The convective heat transfer coefficients of the air are coincided with the empirical equations of Grimson and ${\breve{Z}ukauskas}$. (3) The equation of the mean heat transfer coefficient obtained in the present study is ${N_um}=0.32 {Re_max^{0.63}}$.

  • PDF

Development of Regenerative Inverter for Electric Railway Using Space Vector PWM (SVPWM을 이용한 전기철도용 회생 인버터 개발)

  • 백병산;정문구;김태완
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.9 no.2
    • /
    • pp.97-104
    • /
    • 2004
  • As a device that returns surplus energy, regenerated from trains to d.c. source, to a.c. system and reuses it, the thyristor Inverter has been widely used. Because the conventional thyristor inverter is a unidirectional phase-controlled device, it Is Impossible to control the power factor of its output. Moreover, harmonics emission is high and it needs to take a additional filter. In this paper, to solve the problems stated above, the inverter, which can control real and reactive power by adopting IGBT modules as switching elements and being controlled by means of space vector PWM, is developed. Considering high economical efficiency and reliability in order to apply to the system for commercial use, the developed inverter is equipped with fully digital control system and low pass filter, and reduces harmonics and has compact size. The detail description about the developed inverter is stated in various respects: design criteria, technical description, power circuits, control techniques, the developed system, test results, etc.

A Study on Development of Small Scale Electric Power Management System for Smart Grid (스마트 그리드를 위한 소규모 전력에너지 관리 시스템 개발에 관한 연구)

  • Lee, Chang-Soo;Oh, Hea-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.6
    • /
    • pp.2826-2832
    • /
    • 2012
  • A smart grid is an electric-power grid that employs a new information technology.This technology makes it possible to exchange real-time energy information between suppliers and consumers, finally resulting in high energy efficiency. The energy management system in smart grid provides up to date information on electricity consumption as well as dynamic electricity price to consumers of smart grid system. However, the existing energy management systems only focus on pricing system, for example, real-time electricity prices. In this paper, we try to improve the existing energy management system and propose the energy management system that mainly focuses on the efficiency of electricity consumption. In the proposed management system, PMU(Phasor Measurement Units) installed in switchboards gathers electricity data in a real time. We also propose to use data mining method, which is applied to analyzed electricity data for improving energy efficiency. Also, the proposed energy management system is designed to efficiently control the electricity between PMU and management system in case of a shortage of electricity or surplus electricity.