• Title/Summary/Keyword: Support Projects

Search Result 1,235, Processing Time 0.026 seconds

A Research Study on the Level of Satisfaction with the Farming and Fishing Village Housing Improvement Projects (농어촌주택개량사업 만족도 조사 연구)

  • Park, Heon-Choon;Kim, Seung-Keun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.16 no.4
    • /
    • pp.91-98
    • /
    • 2014
  • In this study, the current conditions of the farming and fishing village housing improvement projects that were promoted for the last five years were examined, the results of the survey conducted among the promoters of the farming and fishing village housing improvement projects with regard to their level of satisfaction were analyzed, and the outcomes of the housing improvement projects and the improvement needs were derived for utilization as basic data for preparing an improvement plan for "the farming and fishing village housing improvement projects". Below are the results of this study and the proposals based on such. In view of the reality that the recipients of the farming and fishing village housing improvement projects are limited to the rural residents who are able to repay their loans, ways of actualizing the current loan limit of 60 million won should be prepared, taking into account the actual construction cost. Moreover, as the rural residents do not live on monthly salaries, the repayment periods of their loans should be adjusted to make them payable on a quarterly or a semi-annual basis, reflecting the reality of the farming villages, where loan repayment is based on the residents' yearly income. Further, policies guaranteeing the residential rights of those belonging to the low-income bracket who are unable to repay their loans must be established at the soonest possible time. In view of the realities in the farming villages, where there are 640,000 houses that are over 31 years old, the supply of 10,000 houses as part of the housing improvement projects is grossly inadequate. Of course, it cannot be said that all the residents who are living in worn-out houses have the necessary conditions for receiving support from the housing improvement fund. Therefore, policies supporting the speedy improvement of worn-out houses and guaranteeing the residential rights of those belonging to the low-income bracket are urgently needed.

Software Size Measurement from Information Strategy Planning With the Function Point Method (정보전략계획 단계에서의 정보시스템 규모 예측:기능점수모형을 중심으로)

  • Bae, Joon-Soo;Jung, Jae-Yoon
    • The Journal of Society for e-Business Studies
    • /
    • v.14 no.3
    • /
    • pp.153-168
    • /
    • 2009
  • Many companies and governments perform information technology (IT) projections repeatedly for higher competitiveness and efficiency. Moreover, as the sizes of IT projects increase, the manpower and cost estimation of the projects are getting more important. In this research, we present a size estimation method of information system development projects on the basis of the function point method at the stage of information strategy planning(ISP), and illustrate the size calculation of an example IT project. According to the method, we first identify the types of projects, the scope and boundaries of size estimation, then count data and transaction functions from the artifacts of the ISP project. The unadjusted function points are adjusted to function point by the table of the Early Function Point. The way of calculating the sizes of IT projects will support successful IT projects by estimating reasonable manpower and cost for the projects.

  • PDF

A Comparative Analysis of Risk Assessment Depending on International Project Types (플랜트, 건축, 토목 공종별 해외건설 리스크평가 비교분석)

  • Baek, Seungwon;Han, Seung-Heon;Jung, Wooyong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.125-136
    • /
    • 2019
  • This study investigated checked risk level before bid, actual risk level after award, contingency, and cost growth rate in the 124 international construction projects executed by Korean major companies. This study conducted comparative analysis by product type using rank analysis, ANOVA and correlation analysis. As a result, plant and civil projects have worse risk level than architecture projects not only in before bid but also in after award. Especially, country risk is the worst risk in both plant and civil projects, followed by project risk and capability risk. Also, although plant and civil projects reflect more contingency than architecture projects, contingency is not correlated with the checked risk level before bid. Lastly, the cost growth rate is correlated with the actual risk level in all product types. This study is expected to support in planning better practical risk management for international construction projects.

Success Factors of Commercialization in IT Technology (정보통신 기술의 상용화 성공요인 분석)

  • Lee, Young-Duck
    • Journal of Technology Innovation
    • /
    • v.12 no.3
    • /
    • pp.259-276
    • /
    • 2004
  • This paper identifies success factors influencing technology commercialization, develops a framework for technology commercialization model among factors, commercialization, empirically investigates the framework, and suggests policy alternatives for more effective technology commercialization in the areas of information and communication technology industries in Korea. To facilitate commercialization of government-sponsored R&D projects, the following policy implications are suggested; manager's willingness and support on commercialization, and more abundant commercialization fund, former experience on commercialization, strong linkage with present business and technology, more information about government commercialization programs and technologies, and improved environment of commercialization including market protection and penetration support.

  • PDF

Teaching-Learning Model of Convergence Project Based on Team Teaching in Engineering Education (공학교육에서의 팀티칭기반 융합프로젝트중심 교수학습모형의 개발)

  • Park, Kyungsun
    • Journal of Engineering Education Research
    • /
    • v.17 no.2
    • /
    • pp.11-24
    • /
    • 2014
  • The purpose of this study is to develop a teaching-learning model of convergence project based on team teaching. Based on development research methodology which explored a university case, the teaching-learning model was developed including three phases such as preparation, planning, and implementation & evaluation. The preparation phase has three steps as follows: to organize team teaching faculty; to develop convergence projects cooperated by industry and university; and to design instructions based on supporting convergence projects. The last step of preparation phase consists of five design activities of: (1) instructions and teaching contents; (2) communication channel among faculty members; (3) feedback system on students' performance; (4) tools to support learners' activity; and (5) evaluation system. The planning phase has two steps to analyze learners and to introduce and modify instruction and themes of convergence projects. The implementation & evaluation phase includes five steps as bellow: (1) to organize project teams and match teams with faculty members; (2) to do team building and assign duties to students of a team; (3) to provide instruction and consulting to teams; (4) to help teams to conduct projects through creative problem solving; and (5) to design mid-term/final presentation and evaluation. Lastly, the research implications and limitations were discussed for future studies.

A Study on the Analysis of SE Process Implementation for the Light Rail Transit Project (경량전철사업의 시스템엔지니어링 적용 실태분석 연구)

  • Kim, Chul Whan;Han, Myeung-Duk;Lee, Jae Hong
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.2
    • /
    • pp.1-10
    • /
    • 2012
  • This paper aims to analyze the result of SE Process Implementation on Light Rail Transit(LRT) Project. Currently the Light Rail Transit Project of Korea applies SE to the intermediate phase, that is, E&M phase which is a manufacturing and designing procedure. More seriously, the application effect of SE is not remarkable because it applies to some specific engineering fields like RAMS and it depends on superficial consulting of foreign companies with low SE support capability and investment capital. This study points out that the "Requirement Analysis" and "System Alternative Review" has not been conducted from the initial phase (basic plan and basic design) of the LRT projects. Several projects indicate that the amount of investments for SE activities through the Korea LRT project is relatively very small in comparison with the global capital which is about 10% of total project budget. Furthermore, Korea LRT projects have very few SE professionals and weak SE organization with no government directions and guide book for the efficient implementation of SE for the LRT projects.

Review of Rural Housing Policies for Rural Revitalization Based on the Analysis of Rural Newtown Projects (농어촌 뉴타운조성사업을 토대로 본 농촌 활성화를 위한 주거환경 정책 방향)

  • Park, Jung-a;Choi, Byungsook;Kang, Inho
    • Korean Journal of Human Ecology
    • /
    • v.24 no.6
    • /
    • pp.887-901
    • /
    • 2015
  • This study aims to identify limitations and pending problems after reviewing the overall policies and status of rural Newtown projects, and to seek solutions to its problems. This study targeted the villages of 5 districts, which were developed as rural new-towns after 2009 and included the basic status and progress of the pilot districts. This study conducted a literature review to examine the basic status and progress of the pilot districts, and based on this, analyzed the demand prediction, site selection, project implementation, and housing and amenity facilities of the pilot districts. The study methods included literature reviews, on-site surveys, interviews with village representatives, and consultations with experts. According to the analysis results, a low occupancy rate of the Newtown project districts is because the prediction of occupancy demand was incorrectly completed before implementing the projects. Also, the eligibility for occupancy, such as age restriction and mandatory farming was too strict. Other problems included an absence of income generation support policies for rural returnees, a housing supply policy in disregard of agricultural characteristics, and a lack of understanding of maintenance of communal space, etc.

Residents' Perception and Participation Satisfaction on Rural Landscape Improvement Projects - Focused on the Rural Revitalization Project in Geumsan - (농촌경관 개선사업에 대한 주민인식 및 참여만족도 연구 - 금산읍 농촌중심지 활성화사업을 대상으로 -)

  • Park, Eun-Yeong;Lee, Hyung-Sook
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.1
    • /
    • pp.1-10
    • /
    • 2019
  • This purpose of this study was to investigate the perception and participation satisfaction of residents who participated in the rural landscape improvement project in Geumsan. The projects were conducted in three villages of Geumsan in 2018 and total 96 residents had participated. The results of the questionnaire survey on the participants showed that they usually have interests in community activities and actively participated. As a result of analyzing factors related to the change of residents' perceptions and satisfaction. It was found that there was significant difference in perception and satisfaction according to frequency of participation, not demographic factors. It is interesting that active interaction among residents during the projects and satisfaction on process are important factor for overall project satisfaction. For successful rural landscape improvement projects, it is necessary to encourage and support interaction and communication among residents. In addition, more various programs need to be developed to foster residents' attachment and sense of community.

Prediction of duration and construction cost of road tunnels using Gaussian process regression

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Abdulhamid, Sazan Nariman;Ibrahim, Hawkar Hashim;Ali, Hunar Farid Hama;Nejati, Hamid Reza;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • v.28 no.1
    • /
    • pp.65-75
    • /
    • 2022
  • Time and cost of construction are key factors in decision-making during a tunnel project's planning and design phase. Estimations of time and cost of tunnel construction projects are subject to significant uncertainties caused by uncertain geotechnical and geological conditions. The Gaussian Process Regression (GPR) technique for predicting ground condition and construction time and cost of mountain tunnel projects is used in this work. The GPR model is trained with data from past mountain tunnel projects. The model is applied to a case study in which the predicted time and cost of tunnel construction using the GPR model are compared with the actual construction time and cost for model validation and reducing the uncertainty for the future projects. In addition, the results obtained from the GPR have been compared with to other models of artificial neural network (ANN) and support vector regression (SVR) that the GPR model provides more accurate results.

Identification of Critical Success Factors (CSFs) for Public-Private Partnerships Across Infrastructure Sectors

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.83-90
    • /
    • 2022
  • Public-private partnerships (PPP) projects are becoming popular in both developed and developing countries due to their ability to access new financing sources and transfer certain project risks to the private sector. PPP has been an active research area where the concept of Critical Success Factors (CSF) is often discussed by researchers. This study aims to identify the CSFs for various PPP infrastructure projects that have been explored in previous CSF studies. This article reviewed the literature about CSF in PPP projects from the years 2002 to 2021, compared the findings of studies regarding the identified CSFs, and consolidated the CSFs that can be applied to various PPP infrastructure projects. The results showed that dominant research focused on general infrastructure, where CSFs can be applied to all infrastructure sectors rather than any specific sector. The most identified CSFs from the study are favorable and efficient legal frameworks, appropriate risk allocation and sharing, a robust and reliable private consortium, a competitive and transparent procurement process, and political support and stability. The findings from the study can provide an overview of CSFs that are relevant to specific PPP infrastructure sectors like building infrastructure, transportation, water, etc. as well as for general infrastructure. In addition, the results can also be used for further empirical analysis.

  • PDF