• Title/Summary/Keyword: Supply Contract

Search Result 194, Processing Time 0.027 seconds

A Study on the Regulation Improvement of the Public IT Project Contract Law (공공IT 프로젝트 계약법의 제도개선에 관한 연구)

  • O, Jong-U;No, Gyu-Seong;Son, Dong-Gwon;Kim, Sin-Pyo;Lee, Geun-Bae;Park, Yeong-Min
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.231-242
    • /
    • 2005
  • The purpose of this study is to generate a proper regulation improvement direction of the public IT project contract law through the current four contract methods and three methods of the awarding party of a contract method. The research method for this paper is derived from the written materials of the present public IT project contract law. Two problems have been processed in order to produce the results: the current contract methods and the awarding party of a contract method. The current contract methods consist of a competition contract, a private contract, and a supply methodology contract. The methods of the awarding party of a contract display a qualified evaluation regulation, the 2nd step competition bid, a standard cost separation tender, and a contract by a negotiation. The results exhibit that the general competition contract consists of four improvement items. The contract by a negotiation contains five improvement items. The group private contract has one improvement item. And the private contract includes one improvement item. These results implicate that the current public IT project contract law demands better improvement work for the ubiquitous Korea.

  • PDF

A Study on the Innovative Scheme of the Public IT Project Ordering and Receiving Systems (공공 IT 프로젝트 수발주 제도의 개선방안 연구)

  • Oh, Jong-Woo;No, Gyu-Seong;Kim, Sin-Pyo
    • Journal of Digital Convergence
    • /
    • v.4 no.2
    • /
    • pp.97-108
    • /
    • 2006
  • The purpose of this study is to generate a proper regulation improvement direction of the public If project contract law through the current four contract methods and three methods of the awarding party of a contract method. The research method for this paper is derived from the written materials of the present public IT project contract law. Two problems have been processed in order to produce the results: the current contract methods and the awarding party of a contract method. The current contract methods consist of a competition contract, a private contract, and a supply methodology contract, The methods of the awarding party of a contract display a qualified evaluation regulation, the 2nd step competition bid, a standard cost separation tender, and a contract by a negotiation. The results exhibit that the general competition contract consists of four improvement items. The contract by a negotiation contains five improvement items. The group private contract has one improvement item. And the private contract includes one improvement item. These results implicate that the current public IT project contract law demands better improvement work for the ubiquitous Korea.

  • PDF

A Study on the Legislation Scheme of the Public IT Project Ordering and Receiving Systems (공공IT 프로젝트 수발주 제도의 법제화 방안 연구)

  • O, Jong-U;No, Gyu-Seong;Son, Dong-Gwon;Kim, Sin-Pyo;Lee, Geun-Bae;Park, Yeong-Min
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.319-353
    • /
    • 2006
  • The purpose of this study is to generate a proper regulation improvement direction of the public IT project contract law through the current four contract methods and three methods of the awarding party of a contract method. The research method for this paper is derived from the written materials of the present public IT project contract law. Two problems have been processed in order to produce the results: the current contract methods and the awarding party of a contract method. The current contract methods consist of a competition contract, a private contract, and a supply methodology contract. The methods of the awarding party of a contract display a qualified evaluation regulation, the 2nd step competition bid, a standard cost separation tender, and a contract by a negotiation. The results exhibit that the general competition contract consists of four improvement items. The contract by a negotiation contains five improvement items. The group private contract has one improvement item. And the private contract includes one improvement item. These results implicate that the current public IT project contract law demands better improvement work for the ubiquitous Korea.

  • PDF

Supply Contract Intelligence : The Impact of Stockout and Overstock Experiences Using System Dynamics Simulation Model (공급사슬지능 : 시스템 다이나믹스를 이용한 재고 과부족 경험이 공급사슬에 미치는 영향 분석)

  • Noh, Yonghwi;Choi, Donghyun;Rha, Jin Sung;Suh, Yongkee
    • Journal of Intelligence and Information Systems
    • /
    • v.19 no.2
    • /
    • pp.21-38
    • /
    • 2013
  • The purpose of this study is to investigate the influence of behavioral factors (buyer's tendency to reflect stockout and overstock experiences in ordering decision) on the supply chain performance. This study employs system dynamics to examine the influence of these behavioral factors derived from the interview with several representatives of retailers in South Korea. The results show that different contract can bring different performance (total profit, seller's profit, buyer's profit, order quantity, sales quantity, overstock, and stockout). The results also suggest that these behavioral factors play a significantly influential role in the performance of supply contract. These results imply that supply contract should be established based on the analysis of behavioral factors of supply chain participants.

Foreign Exchange Risk Control in the Context of Supply Chain Management

  • Park, Koo-Woong
    • Journal of Distribution Science
    • /
    • v.13 no.2
    • /
    • pp.15-24
    • /
    • 2015
  • Purpose - Foreign exchange risk control is in an important component in the international supply chain management. This study shows the importance of the reference period in forecasting future exchange rates with a specific illustration of KIKO currency option contracts, and suggests feasible preventive measures. Research design, data, and methodology - Using monthly Won-Dollar exchange rate data for January 1995~July 2007, I evaluate the statistical characteristics of the exchange rate for two sub-periods; 1) a shorter period after the East Asian financial crisis and 2) a longer period including the financial crisis. The key instrument of analysis is the basic normal distribution theory. Results - The difference in the reference period could lead to an unexpected development in contract implementation and a consequent financial loss. We may avoid foreign exchange loss by using derivatives such as forwards or currency options. Conclusions - We should consider not only level values but also the volatilities of financial variables in making a binding financial contract. Appropriate measures may differ depending on the specific supply chain pattern. We may extend the study with surveys on actual risk measures.

CLUSTER ANALYSIS FOR REGION ELECTRIC LOAD FORECASTING SYSTEM

  • Park, Hong-Kyu;Kim, Young-Il;Park, Jin-Hyoung;Ryu, Keun-Ho
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.591-593
    • /
    • 2007
  • This paper is to cluster the AMR (Automatic Meter Reading) data. The load survey system has been applied to record the power consumption of sampling the contract assortment in KEPRI AMR. The effect of the contract assortment change to the customer power consumption is determined by executing the clustering on the load survey results. We can supply the power to customer according to usage to the analysis cluster. The Korea a class of the electricity supply type is less than other country. Because of the Korea electricity markets exists one electricity provider. Need to further divide of electricity supply type for more efficient supply. We are found pattern that is different from supplied type to customer. Out experiment use the Clementine which data mining tools.

  • PDF

Supply Chain Contract Model with Vague Demand Information (모호한 수요정보에서의 공급망 계약 모델)

  • Kim, Gi-Tae;Park, Jun-Cheul
    • The Journal of Information Systems
    • /
    • v.21 no.2
    • /
    • pp.181-196
    • /
    • 2012
  • 본 논문은 고객의 수요정보에 대해 모호한 정보를 가진 공급자와 구매자 사이의 공급망 계약에 관한 것을 다루고 있는 것으로, 고객 수요에 대한 불확실성은 확률적 프로그래밍 모델에서 공식적으로 다루어져왔다. 확률적 프로그램의 한 가지 핵심적인 가정은 널리 알려져 있는바와 같이 수요에 대한 확률분포가 알려져 있다는 것이다. 그럼에도 불구하고 만약 수요에 대한 정보가 모호하거나 정확하지 않다면 수요에 대한 확률분포가 정확하지 않다는 점이다. 이런 상황에서 퍼지 이론은 수요정보를 나타내는데 유용하다고 할수 있다. 본 논문은 퍼지 랜덤수요변수들을 분산시스템의 공급망 계약에서 다루고 있다. 이 계약은 구매자의 주문량을 조정하는 옵션을 이용한다. 본 연구는 퍼지 랜덤 변수들을 GMIR(Graded Mean Integration Representation)을 이용하여, 알고리즘을 통해 구현함으로써 실증적 결과 값을 제시하고 미래 연구의 확장 가능성을 제시하고 있다.

A Quantity Flexibility Contract Model for Optimal Purchase Decision (최적 구매량 결정을 위한 QF 계약 모형)

  • Kim Jong-Soo;Kim Tai-Young;Kang Woo-Seok
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.31 no.2
    • /
    • pp.129-140
    • /
    • 2006
  • Quantity Flexibility contract coordinates individually motivated supplier and buyer to the systemwide optimal outcome by effectively allocating the costs of market demand uncertainty. The main feature of the contract is to couple the buyer's commitment to purchase no less than a certain percentage below the forecast with the supplier's guarantee to deliver up to a certain percentage above. In this paper we refine the previous models by adding some realistic features including the upper and lower limits of the purchase. We also incorporate purchase and canceling costs in a cost function to reflect the real world contracting process more accurately. To obtain the solution of the model, we derive a condition for extreme points using the Leibniz's rule and construct an algorithm for finding the optimal solution of the model. Several examples illustrating the algorithm show that the approach is valid and efficient.

Component Outsourcing Contracts in a Two-Component Assembly System (두 가지 부품으로 구성된 조립시스템에서 부품 아웃소싱 계약에 대한 고찰)

  • Kim, Eun-Gab
    • IE interfaces
    • /
    • v.22 no.2
    • /
    • pp.165-173
    • /
    • 2009
  • This paper considers a two-component assembly system that makes different types of purchasing contracts by component type and studies the issue of coordinating those contracts. Acquisition of type 1 component is based on the long-term contract. In contrast, type 2 component is intermittently purchased under the sort-term contract. We identify the structural properties of the optimal short-term contract and investigate how the changes in system parameters affect the optimal performance. To provide managerial insights, we compare the short-term and long-term contracts for type 2 component and discuss the conditions that make the short-term contract preferable to the long-term contract. We also present a result which shows that coordinating the contracts of type 1 and type 2 components can be significantly profitable over uncoordinating them.

Supplier-Buyer Models for a Long-term Replenishment Contract and ARIMA Demand Process (ARIMA수요과정을 갖는 장기보충계약하의 공급자 구매자 모형)

  • 이동규;김종수
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.11a
    • /
    • pp.329-333
    • /
    • 2003
  • This study presents supplier buyer models representing the interactions between supplier and buyer under a long-term replenishment contract in a supply chain system. We established the models according to the economic power of each party. Analysis based on Stackelberg game theoretic approach is tried for each model. We develop methods for each agent to follow to complete a contract for the best interest of each participant.

  • PDF