Shaking Table Model Test of Shanghai Tower

  • Lu, Xilin;Mao, Yuanjun;Lu, Wensheng;Kang, Liping
    • 국제초고층학회논문집
    • /
    • 제2권1호
    • /
    • pp.79-83
    • /
    • 2013
  • Shaking table test is an important and useful method to help structural engineers get better knowledge about the seismic performance of the buildings with complex structure, just like Shanghai tower. According to Chinese seismic design guidelines, buildings with a very complex and special structural system, or whose height is far beyond the limitation of interrelated codes, should be firstly studied through the experiment on seismic behavior. To investigate the structural response, the weak storey and crack pattern under earthquakes of different levels, and to help the designers improve the design scheme, the shaking table model tests of a scaled model of Shanghai tower were carried out at the State Key Laboratory of Disaster Reduction in Civil Engineering, Tongji University, Shanghai, China. This paper describes briefly the structural system, the design method and manufacture process of the scaled model, and the test results as well.

Foundation Differential Settlement Included Time-dependent Elevation Control for Super Tall Structures

  • Zhao, Xin;Liu, Shehong
    • 국제초고층학회논문집
    • /
    • 제6권1호
    • /
    • pp.83-89
    • /
    • 2017
  • Due to the time-dependent properties of materials, structures, and loads, accurate time-dependent effects analysis and precise construction controls are very significant for rational analysis and design and saving project cost. Elevation control is an important part of the time-dependent construction control in supertall structures. Since supertall structures have numerous floors, heavy loads, long construction times, demanding processes, and are typically located in the soft coastal soil areas, both the time-dependent features of superstructure and settlement are very obvious. By using the time-dependent coupling effect analysis method, this paper compares Shanghai Tower's vertical deformation calculation and elevation control scheme, considering foundation differential settlement. The results show that the foundation differential settlement cannot be ignored in vertical deformation calculations and elevation control for supertall structures. The impact of foundation differential settlement for elevation compensation and pre-adjustment length can be divided into direct and indirect effects. Meanwhile, in the engineering practice of elevation control for supertall structures, it is recommended to adopt the multi-level elevation control method with relative elevation control and design elevation control, without considering the overall settlement in the construction process.

Significant Progress in Construction Equipment of Super High-Rise Building

  • Zhang, Kun;Wang, Hui;Wang, Kaiqiang;Cui, Jian;Chen, Bo;Li, Di
    • 국제초고층학회논문집
    • /
    • 제7권3호
    • /
    • pp.243-253
    • /
    • 2018
  • The construction of rapid developing super high-rise buildings constantly faces great challenges and the innovation of construction equipment is a focus of these challenges. In this paper, three new inventions including the operation platform, tower crane and hoist are put forward around two of the most important issues of super high-rise building construction: vertical transportation and operation environment. Study background, composition of the equipment, working principles and key technologies are introduced in sequence. In the end, the paper summarizes the main problems in the further development of construction equipment.

Large eddy simulation of wind effects on a super-tall building

  • Huang, Shenghong;Li, Q.S.
    • Wind and Structures
    • /
    • 제13권6호
    • /
    • pp.557-580
    • /
    • 2010
  • A new inflow turbulence generation method and a combined dynamic SGS model recently developed by the authors were applied to evaluate the wind effects on 508 m high Taipei 101 Tower. Unlike the majority of the past studies on large eddy simulation (LES) of wind effects on tall buildings, the present numerical simulations were conducted for the full-scale tall building with Reynolds number greater than $10^8$. The inflow turbulent flow field was generated based on the new method called discretizing and synthesizing of random flow generation technique (DSRFG) with a prominent feature that the generated wind velocity fluctuations satisfy any target spectrum and target profiles of turbulence intensity and turbulence integral length scale. The new dynamic SGS model takes both advantages of one-equation SGS model and a dynamic production term without test-filtering operation, which is particular suitable to relative coarse grid situations and high Reynolds number flows. The results of comparative investigations with and without generation of inflow turbulence show that: (1) proper simulation of an inflow turbulent field is essential in accurate evaluation of dynamic wind loads on a tall building and the prescribed inflow turbulence characteristics can be adequately imposed on the inflow boundary by the DSRFG method; (2) the DSRFG can generate a large number of random vortex-like patterns in oncoming flow, leading to good agreements of both mean and dynamic forces with wind tunnel test results; (3) The dynamic mechanism of the adopted SGS model behaves adequately in the present LES and its integration with the DSRFG technique can provide satisfactory predictions of the wind effects on the super-tall building.

Stability of Diagrid Structures

  • Rahimian, Ahmad
    • 국제초고층학회논문집
    • /
    • 제5권4호
    • /
    • pp.263-270
    • /
    • 2016
  • In this paper, the stability requirements for diagrid and mega braced structures are examined. The role of the secondary bracing system for the stability of a diagrid structure is discussed. A simple procedure is proposed for the design of the secondary bracing system when it is required. As a case study, the design of the Hearst Tower diagrid and its secondary bracing system are presented.

The Structural Design of Tianjin Goldin Finance 117 Tower

  • Liu, Peng;Ho, Goman;Lee, Alexis;Yin, Chao;Lee, Kevin;Liu, Guang-lei;Huang, Xiao-yun
    • 국제초고층학회논문집
    • /
    • 제1권4호
    • /
    • pp.271-281
    • /
    • 2012
  • Tianjin Goldin Finance 117 tower has an architectural height of 597 m, total of 117 stories, and the coronation of having the highest structural roof of all the buildings under construction in China. Structural height-width ratio is approximately 9.5, exceeding the existing regulation code significantly. In order to satisfy earthquake and wind-resisting requirements, a structure consisting of a perimeter frame composed of mega composite columns, mega braces and transfer trusses and reinforced concrete core containing composite steel plate wall is adopted. Complemented by some of the new requirements from the latest Chinese building seismic design codes, design of the super high-rise building in high-intensity seismic area exhibits a number of new features and solutions to professional requirements in response spectrum selection, overall stiffness control, material and component type selection, seismic performance based design, mega-column design, anti-collapse and stability analysis as well as elastic-plastic time-history analysis. Furthermore, under the prerequisite of economic viability and a series of technical requirements prescribed by the expert review panel for high-rise buildings exceeding code limits, the design manages to overcome various structural challenges and realizes the intentions of the architect and the client.

The Research and Application of Innovative High Efficient Construction Technologies in Super High Rise Steel Structure Building

  • Dai, Lixian;Liao, Biao
    • 국제초고층학회논문집
    • /
    • 제3권3호
    • /
    • pp.205-214
    • /
    • 2014
  • The super high rise building construction is characterized by a large quantity of engineering works and structural components, high demanding of construction technology and complex cross operations. As the height of super high rise building increases, the construction difficulties increase, it is challenging the steel structural building construction technology. In this paper, the key technologies in the construction of Chinese modern super high rise steel structure building have been studied. The innovative tower crane supporting frame suspension disassembly technology has been developed to allow the crane supporting frame to turnover in the air without occupying materials stockyard. A new self-elevating platform technique which is capable of striding over structural barriers has been developed. This new technology allows the platform to be self-elevated along variable cross section column with a maximum 600 mm size change. A new automatic submerged arc welding technology has also been developed to ensure the process continuity and quality stability of welding job on the construction site.

800MPa급 고성능 강재 적용한 초고층 메가 부재 대안설계 (Alternative Design of Mega Structural Members of a Super-tall Building using 800MPa Grade High-performance Steel Plate)

  • 조소훈;김도환;김진원;이승은;김진호
    • 한국강구조학회 논문집
    • /
    • 제26권4호
    • /
    • pp.299-309
    • /
    • 2014
  • HSA800은 건축구조용 고성능 강재로서 KS규격에 항복강도 650MPa-770MPa, 인장강도 800MPa-950MPa를 가지며 항복비(항복강도/인장강도) 또한 0.85이하로 제한되어있으며 TMCP 기법으로 제조되어 뛰어난 용접성을 나타내는 특징이 있다. 본 연구에서는 국내 최초의 초고층 빌딩인 롯데월드타워의 메가 구조부재를 대상으로 고강도 강재 적용시 구조물 안전성의 변동사항 및 시공성 개선 등을 검토하여 경제적 설계를 위한 대안을 제시하는 것을 목적으로 한다. 대상 부재로는 아웃리거 코어월 매립부 상/하현재, 벨트트러스, 외곽 철골기둥이 선정되었다. 원설계 단면을 등가 도강도 강재 단면으로 환산하여 두께를 결정한 후 중력저항모델, 횡력저항모델, 연쇄붕괴 모델을 구조해 석시뮬레이션을 통하여 성능을 비교 평가하였다. 그 결과 횡강성에 영향을 주지 않는 부재는 고강도 강재 적용이 가능하며 원설계 대비 약 1100톤의 물량 절감 효과가 있었다. 따라서, 고강도 강재를 사용하면 부재 두께를 줄일 수 있으므로 부재 제작성 및 시공성이 향상될 수 있을 것으로 기대된다.

Design and Application of Self-Lifting & Slewing Multi-Cranes Platform

  • Kun Zhang;Kaiqiang Wang;Bo Chen;Qing Sun;Hui Yang;Xin Ba;Jinming Zhao
    • 국제초고층학회논문집
    • /
    • 제11권2호
    • /
    • pp.103-114
    • /
    • 2022
  • Tower crane is of great importance in the construction of high rise buildings. A self-lifting & slewing multi-cranes platform (referred to as crane slewing platform) was developed to optimize the configuration of tower cranes, as well as solve the problems of cooperative operation conflict between multiple cranes and other construction equipment and their respective climbing and occupying of construction period. The design and test of the slewing platform was introduced. By applying the slewing platform in the construction of Chengdu Greenland Center super high rise building project, some key technologies such as the configuration of cranes, the installation, construction and lifting of the slewing platform are implemented and validated. Up to now, the slewing platform has been safely lifted up 98 times in Chengdu Greenland Center project construction, and achieved good social and economic benefits.

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.