• 제목/요약/키워드: Successful Project

검색결과 897건 처리시간 0.025초

재개발사업의 추진단계별 갈등 원인과 실증분석에 관한 연구 (A Study on Conflicts Cause and Content Anyalsis by Business Type Reconstrution Project)

  • 김진
    • 한국전자통신학회논문지
    • /
    • 제7권2호
    • /
    • pp.375-380
    • /
    • 2012
  • 본 논문에서는 재개발사업에서 많이 발생하는 분쟁, 민원, 갈등에서 나타나는 원인과 문제점을 살펴보고, 특히 재개발사업에서 나타나는 추진단계별 갈등현황을 설문지를 통해 실증 분석하였다. 따라서 본 논문에서는 재개발사업에서 나타나는 갈등을 예방 할 수 있는 이론적 대안을 제시하고 재개발 사업이 보다 원활하게 진행될 수 있도록 하는 데에 연구의 목적이 있다.

P.M.I. 기법을 이용한 국내 건설업체 리스크관리 실태 분석 (Trend Analysis for Risk Management of Construction Project using P.M.I. Techniques)

  • 정병화;정영식
    • 한국안전학회지
    • /
    • 제16권4호
    • /
    • pp.115-122
    • /
    • 2001
  • Recently construction enterprises involves more occurred with increase of size and complxity of construction works. Risk management is one of the key project management process. Numerous tools are available to support the various phases of the risk management process. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and in effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are mon likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.

  • PDF

Meeting the Energy Reduction Goal on a High Rise Building thru IPD Framework

  • Jeong, Pyung Oh;Lee, Peter;Kim, Sang-jin
    • 국제초고층학회논문집
    • /
    • 제2권2호
    • /
    • pp.93-96
    • /
    • 2013
  • Greenhouse gas emissions and excessive energy consumption have been an on-going world issue nowadays. We can find that the majority portion is caused by high-rise office buildings. In order to resolve these problems, it is extremely important to implement various active or passive strategies in a building design. To successfully meet these design goals and energy reduction approaches, a project building must utilize an efficient design process from the early start. One of the most effective project delivery process called Integrated Project Delivery (IPD) will be implemented in a case study project building (KEPCO) during design phase and show how important it is to plan a project's green environmental performance goal together through an early collaboration from all key project participants, which helps to construct an successful green building design without any critical construction pitfalls.

Measuring Performance to Engage the Extended Project Team in Construction

  • Bal, Menoka;Bryde, David
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.1-10
    • /
    • 2015
  • In construction, stakeholders of extended project team play a key role in the overall project performance. Successful integration of stakeholders demands for good management practices at strategic, operational and project levels. Targets and measures to improve the stakeholder performance encourage the creativity and willingness of stakeholders of extended project team to develop the better ways to achieve the project objectives. This paper presents a generic descriptive method, showing how stakeholder's ability and influence impacts on project performance in the construction sector. The findings of a series of interviews with key informants are presented and the following main conclusion is drawn: improving project performance through stakeholder's contribution and measuring their performance can strengthen the project performance. This innovative approach which redefines the process of improving the project performance in construction projects will be of interest to those who intend to manage the projects in practice as well as to those who interested in advancing theory.

원자력 발전소 건설 프로젝트에서 갈등이 협력과 성과에 미치는 영향에 관한 연구 (The Effect of Conflict on Collaboration and Performance in Nuclear Power Plant Construction Projects)

  • 유영석;조동혁;최혜수
    • 품질경영학회지
    • /
    • 제47권3호
    • /
    • pp.553-569
    • /
    • 2019
  • Purpose: The purpose of this study is to identify the impact of conflicts and cooperation on project performance in the nuclear power plant construction project, thus contributing to the successful performance of project participants and the achievement of project objectives. Methods: This study used a method of conducting a survey of participants in the nuclear power plant construction project and verifying the hypothesis statistically. Results: The results of this study are as follows; First, role conflicts and relationship conflicts have negative effects on collaboration. Second, role conflicts have a negative effects on project performance, but conflict in relation has no significant effects on project performance. Third, collaboration has a positive effects on project performance. Finally, the communication quality in the relationship between conflict and collaboration has been shown to have a Moderated effect. Conclusion: In order to achieve the goal in the nuclear power plant construction project, the level of collaboration should be improved based on conflict management among project participants.

ESTABLISHMENT OF DECISION MAKING FRAMEWORK FOR SUPPORTING COOPERATION AMONG STAKEHOLDERS IN MEGA PROJECT

  • Jee Hee Lee;June Seong Yi;Seung Woo Shin;Kyung Rog Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1288-1293
    • /
    • 2009
  • Performing 'Mega Project' in which various stakeholders are involved is difficult to control due to the respective conflicting objectives. Urban regeneration which is being challenged issue in various ways can be defined as the mega project. Since the mega project like urban regeneration a long-continued project and includes a lot of participants whose benefits conflict, cooperation among stakeholders is essential. Moreover, as the project goes, diverse decision making situations which require collaboration happen, and if proper decision making cannot be given at that time, the whole project would have critical effects. Also, since each activity concerns numerous stakeholders, prompt decision making is difficult in the mega project. Therefore, the objective of this study is to support stakeholder's cooperative decision making in order for conducting successful project. For the purpose of the paper, the concept of cooperation in mega project is redefined and a cooperative decision making framework is suggested. Also, the term of governance, which means cooperative mechanism based on the mutual trust, information sharing and partnership, is applied to the newly defined cooperation. The suggested cooperative decision making framework contains the structure of stakeholders in urban regeneration project which enables participants to understand the relationship among bodies and checklists for supporting decision making appropriately. The application of the framework proposed in this research is expected to contribute subjects' suitable decision making by providing proper information in a timely manner.

  • PDF

연구사업관리 주관기관에 따른 기술혁신 R&D 프로젝트 성과 영향분석: 공공과 민간 기업의 차이 비교 (The Effects on the R&D Project Performance according to the Characteristics of Project Management Organizations: The Difference between Public and Private Companies)

  • 이용규;박소현;김희경;이태원
    • 산업경영시스템학회지
    • /
    • 제46권2호
    • /
    • pp.116-132
    • /
    • 2023
  • Technology innovation companies are focusing on contributing to business performance by R&D project as a strategic tool. Successful R&D leads to corporate competitiveness enhancement, national industrial development, but there are high uncertainty and risks in R&D. Public and private R&D projects are carried out to achieve various purposes. It was verified how the risk management and benefit management of the R&D project affect the detailed R&D project performance between the Public and private domain. The impact of Project Leadership on R&D performance was also analyzed. Those who have participated in the Public and Private R&D projects at companies or research institutes were surveyed. First, it was found that project risk and benefit management have partially an effect on R&D project performance. Second, Public and private R&D Project Leadership showed partially a interaction effect between project management and project performance.

실내디자인 프로젝트 매니지먼트에 관한 고찰 (A Study on the Interior Design Project Management)

  • 김상근;유수상
    • 한국실내디자인학회논문집
    • /
    • 제16호
    • /
    • pp.91-97
    • /
    • 1998
  • We have been taught designing process throughout the long period of education. Nevertheless it is hard to make a quick response to actual project However if we are faced with the actual project as a design professionals it is hard to cope with the project at once nothing but ambiguous idea. Also most of designers concemed with the project do not recognize who are responsible for what. Consequently this attitude delays the entire operation causing waste of time and resources and leads to the unacceptable result. This research is designed therefore to come up with the projects control process that is practical enough to encourage interior designers as well as design firms to face actual projects with shrewd response. There is of course no single right answer to certain design projects. But at least there should be a guideline which shows designers more reasonale systematic ways to control design project lest they should waste time and cost : a guideline as an assistance for successful design result.

  • PDF

SOC 민자사업과 프로젝트 파이낸싱의 효율적 결합방안에 관한 연구 (A Study on the Effective Application of the Project Finance to the Korean Private Infrastructure Projects)

  • 박동규
    • 한국건설관리학회논문집
    • /
    • 제1권4호
    • /
    • pp.67-73
    • /
    • 2000
  • SOC 민자사업의 성공을 위해서는 사업시행자의 원활한 자금조달이 필수적인데, 이를 위해서는 국내외의 다양한 재원을 통한 효율적인 프로젝트 파이낸싱이 수반되어야 한다. 본 연구는 SOC민자사업의 개요 및 현황을 살펴보고 새로운 민간투자법 체제에서 변화된 프로젝트 파이낸싱 환경을 구 민자유치법 체제와 비교.분석한다. 현체제에서도 남아있는 문제점들을 어떻게 개선하여 프로젝트 파이낸싱과 민자사업을 효율적으로 결합시킬 수 있는가에 대한 대안도 제시한다.

  • PDF

서포트벡터머신을 이용한 교육시설 초기 공사비 예측에 관한 연구 (A Study on Predicting Construction Cost of Educational Building Project at early stage Using Support Vector Machine Technique)

  • 신재민;김광희
    • 교육녹색환경연구
    • /
    • 제11권3호
    • /
    • pp.46-54
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.