6 sigma is a management innovation strategy which improves most of all managerial processes including transactional and project based operations such as marketing, purchasing, accounting, and construction. Even though 6 sigma is trying to solve problems from the customer's viewpoint in the scientific manner, project leader feels some difficulties in implementation because of several reasons. Especially the difficulties are prevalent in construction site. This paper investigates the cause of the difficulties through questionnaires, analyzes the investigation results, and verifies the critical success factors of 6 sigma implementation. Factor analysis has been usually employed in reducing quantity of data and summarizing information chaos. In this study, several variables from questionnaires are grouped into just only four factors by the process of factor analysis. The critical success factors are extracted as project management system, implementation mechanism, site condition, and project ownership. Some ideas for each individual success factor are suggested, which are expected to be useful in successful implementation of 6 Sigma in construction site.
Electronic Data Interchange (EDI) is an important part of interorganizational electronic commerce due to the strategic impact derived from its use. In order to ensure successful implementation of EDI, EDI controls must first be developed. Because they are implemented in an environmental context, the characteristics of organizational environments have a significant impact on EDI controls. The control strategy for the EDI system - formal, informal, and automated controls - should fit certain organizational environments. A research model has been developed to depict the moderating effects of six environmental variables including industry, organizational, and task characteristics on the relationships between controls and implementation. It is shown empirically that the relationships between EDI controls and implementation are indeed affected by these factors. The results can help management design formal, informal, and automated controls in view of their own environmental contexts.
Normal Operation Safety Survey (NOSS) is a safety management tool used by air traffic control organizations to measure data related to threats and errors to proactively prevent accidents before they occur. NOSS was developed to be applied to the air traffic control field according to the concept of Line Operation Safety Audit (LOSA) conducted by airlines to reduce human errors in the cockpits. Safety management based on data is crucial for the prevention of control-related accidents, and the competency of observers for this is important for the successful implementation of NOSS. Based on LOSA implementation experiences and expert interviews, this paper introduces the international NOSS methods and discusses the key factors required for effective observation and the implementation methods and implications of NOSS observer training.
최근 ERP 시스템이 기업의 전략적 도구로 인식되어지면서, 대기업뿐만 아니라 중소기업에서도 이에 대한 관심이 확산되고 있다. 이러한 경영환경의 변화로 ERP 시스템 도입에 대한 최고경영자 및 일반직원들의 인식이 이전에 비해 높아지고는 있지만, 사실상 인식만 있을 뿐 이에 대한 실제적인 실천전략이 미흡한 실정이다. 이는 중소기업에서 ERP 시스템 구축을 위해서는 수개월 또는 수년간에 걸쳐서 기업의 많은 자원이 투입돼야하기 때문으로 중소기업이 이를 극복하고 성공적인 ERP 시스템을 구축하기 위해서는 중소기업 환경에 적합한 ERP 시스템 구축방안이 마련되어야 할 것이다. 따라서 본 논문에서는 기존에 선행 연구된 연구자료를 비교ㆍ분석하여 중소기업의 특성에 적합한 ERP 시스템 구축 성공요인과 구축전략을 도출하였다. 또한 본 논문에서는 ERP 시스템 도입의사가 있어도 기업환경 여건이 따라주지 않아 실천에 옳기지 못하는 중소기업을 고려하여 도입지원방안으로써 산ㆍ학 연계모델을 제시하였다. 기존에 기술개발 위주로 수행되었던 산ㆍ학 협력활동을 기업의 ERP시스템 도입 지원방안으로 활용함으로써 각 지역에 분산되어있는 중소기업들의 ERP 시스템 도입 활성화를 이끌어 낼 수 있을 것이다. 또한 이를 통해 중소기업은 ERP 시스템 도입에 필요한 인적 물적 자원을 대학으로부터 얻음으로써 자체 내 보유능력의 한계를 극복하고, 대학은 현장실습을 통해 풍부한 경험을 쌓음으로써 우수 인력 양성에 기여할 수 있을 것이다.
We conducted a systematic review to summarize providers' attitudes toward pay-for-performance (P4P), focusing on their general attitudes, the effects of P4P, their favorable design and implementation methods, and concerns. An electronic search was performed in PubMed and Scopus using selected keywords including P4P. Two reviewers screened target articles using titles and abstract review and then read the full version of the screened articles for the final selections. In addition, one reference of screened articles and one unpublished report were also included. Therefore, 14 articles were included in this study. Healthcare providers' attitudes on P4P were summarized in two ways. First, we gathered their general attitudes and opinions regarding the effects of P4P. Second, we rearranged their opinions regarding desirable P4P design and implementation methods, as well as their concerns. This study showed the possibility that some healthcare providers still have a low level of awareness about P4P and might prefer voluntary participation in P4P. In addition, they felt that adequate quality indicators and additional support for implementation of P4P would be needed. Most healthcare providers also had serious concerns that P4P would induce unintended consequences. In order to conduct successful implementation of P4P, purchaser should make more efforts such as increasing providers' level of awareness about P4P, providing technical and educational support, reducing their burden, developing a cooperative relationship with providers, developing more accurate quality measures, and minimizing the unintended consequences.
The management science was concerned about how to use the main point of the management science model and it's technique by the rational primary factors. The problem's definition, estabilished of the model and it's solving. These function are very difficult and important problems, what is more important, are the model of management science's real prosecution to the manager and management scientist. The management science give us a clue to the solution of a business problem. To get needs conclusion and achieving the estabilished object, we must implement a plan, a stratgem, a policy. If we were not implementing the recommended items, we may call the estabilished model and problem solving impractical, ivory-tower theorizing. But, the implementation of management science model is a complicated problem that is involved mutual relations of managers and management scientist, linkage parts member and the resources of organization. And the other problems of implementation are very complicated problems composed of technologic and economic, social and politic, psychological. This paper reports the implementation of a success that possibly studies a fluent and a chief cause to systematic analysis. Then, first of all I will define of implementation and from these, construction of a unity system, I continue with a catch hold of a main point and a fluent for the successful implementation.
One of the most important issues in a small and medium sized enterprise (SME) is to identify how to apply IT to the organization so that it maximizes the effectiveness of IT. In general, a large company mainly plans to adopt, implement, and stimulate a new IT in a viewpoint of advanced IT system's capability for maximizing the effectiveness of IT. However, SME requires a totally different approach since SME's situation is different from a large enterprise's one. In this study, we investigate several factors that have an influence on the successful IT adoption and implementation of a SME through the case of Hwacheon. We also find out that CEO's support, CEO-initiating strategic meeting, IT development ability, and organizational compatibility in the introduction stage of IT are relatively more important than those in the implementation stage of IT, whereas IT flexibility, system quality, training and support, overcoming organizational resistance and performance improvement in the implementation stage of IT play critical roles in the IS success. Our results show that the advance of IT may not guarantee the success of IT implementation.
The purpose of this paper is to give information on e-CPC implementation in the manufacturing industry by studying and analyzing a small and medium sized manufacturing company. After analyzing Various factors on J's e-CPC implementation such as environmental factors, process management factor, and result factors, success factors on J's e-CPC implementation are analyzed. The results of this paper can be summarized as follows. First, the most leading role on J's ERP implementation is the will and support of CEO and team leaders. They led the implementation to be stability successfully by settling the different opinions among teams, showing their ability on process decision and communication with consultants. Second, J tried to prompt system stability by mapping out and conducting the long term change management strategy. Third, J organized ERP project team to implement ERP quickly, and it turned out to be successful Finally, J tried to get outside information from consultants and collaborative companies that have experience in implementing ERP. Especially J made full use of overseas consultants. In respect that this paper giver lots of information on e-CPC implementation in manufacturing industry by a case study of a small and medium sized manufacturing company which has not been carried out so far, it would be useful enough.
정보화경영이 성공하려면 정보화혁신에 대한 적극적인 마인드가 형성되어야 하고, 정보화경영체제가 지향하는 바에 대한 변화와 관리가 효과적으로 이루어져야 한다. 그리고 그러한 노력은 지속적으로 이루어질 필요도 있는데, 이를 위해서는 그에 적합한 문화적 특성이 필요할 것이다. 이러한 이유로 정보화경영지향성과 기업문화의 적합도는 중요하다 할 수 있고, 그 적합도가 높을 때 정보화경영활동의 성공확률은 높다고 할 수 있다. 이러한 이유로 이 연구에서는 정보화경영지향성, 기업문화, 정보화경영지향성과 기업문화의 적합도가 전반적인 정보화경영활동의 이행수준에 미치는 영향을 규명하고자 하였다. 또한 정보화경영지향성과 경영성과간의 관계에 정보화경영활동의 이행수준이 매개효과를 가지는지도 검정하고자 하였다. 이 연구의 결과를 요약하면 다음과 같다. 첫째, 기업이 적극적으로 정보화경영을 지향하면, 정보화경영활동의 이행수준, 경영성과 등이 개선되는지를 검정하였다. 둘째, 기업문화가 정보화경영활동의 이행수준에 미치는 영향을 검정하였다. 셋째, 정보화경영지향성과 기업문화의 적합도가 정보화경영활동의 이행수준에 미치는 영향을 검정하였다. 넷째, 정보화경영지향성과 경영성과간의 관계에서 정보화경영활동이 이행수준의 매개효과를 가지는지를 검정하였다.
PMO(Project Management Office)는 IT 프로젝트의 성공적인 운영을 위한 보편적 접근방법으로 여겨지고 있다. PMO에 관한 선행연구는 PMO의 규범적 역할과 기능을 규명하는 데 집중하는 경향이 있다. 반면 실제 현장에서는 PMO가 발주기업과 전문PMO로 구성되는 조직간 협력체로서 운영되고 있기 때문에 적절한 협력체 (PMO 수행체계)의 수립은 프로젝트 성과에 의미있는 영향을 미칠 것으로 보인다. 본 연구에서는 발주기업과 외부 전문PMO의 역량이 PMO 수행체계의 수립을 통해 프로젝트 성과에 어떠한 영향을 미치는지 살펴보았다. 더불어, 발주자와 전문PMO 간의 지식 상호보완 정도에 따라 각각의 역량이 수행체계에 미치는 영향에 변화가 있는지도 살펴보았다. 연구결과, 발주기업과 외부 전문PMO의 역량이 PMO수행체계의 수립에 긍정적인 영향을 미치며 추진조직과 역할 및 책임에 대한 명확한 정의와 표준화된 프로세스의 확립 등이 IT 프로젝트의 성과에 중요한 요인임이 밝혀졌다. 또한, 발주기업과 전문PMO가 공통지식 기반을 갖고 지식 상호보완성을 확보했을 때 PMO가 더욱 효과적으로 기능을 발휘하는 것으로 밝혀졌다. 종합하면, IT 프로젝트의 성공을 위해서는 PMO 수행체계수립에서 거버넌스 관점의 접근이 중요하며 발주기업과 외부 전문 PMO 간의 지식 상호보완성의 확보가 도움이 되는 것으로 볼 수 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.