• Title/Summary/Keyword: Subcontracting

Search Result 100, Processing Time 0.027 seconds

Machining Route Selection with Subcontracting Using Genetic Algorithm (와주를 고려한 가공경로 선정에서의 유전알고르즘 접근)

  • 이규용;문치웅;김재균
    • Korean Management Science Review
    • /
    • v.17 no.2
    • /
    • pp.55-65
    • /
    • 2000
  • This paper addresses a problem of machining route selection in multi-stage process with machine group. This problem is considered the subcontracting and the production in-house such as regular and overtime work. the proposed model is formulated as a 0-1 integer programming constraining the avaliable time of each machine for planning period and total overtimes. The objective of the model is to minimize the sum of processing cost, overtime cost, and subcontracting cost. To solve this model, a genetic algorithm(GA) approach is developed. The effectiveness of the proposed GA approach is evaluated through comparisons with the optimal solution obtained from the branch and bound. In results, the same optimal solution is obtained from two methods at small size problem, and the consistent solution is provided by the GA approach at large size problem. The advantage of the GA approach is the flexibility into decision-making process because of providing multiple machining routes.

  • PDF

In-House Subcontracting and Industrial Relations in Japanes Steel Industry (일본 철강산업의 사내하청과 노사관계)

  • Oh, Haksoo
    • Korean Journal of Labor Studies
    • /
    • v.24 no.1
    • /
    • pp.107-156
    • /
    • 2018
  • This article examines the history of the in - house subcontracting and the stabilization of labor - management relations in the steel industry in Japan. The ratio of in-house subcontract workers among steel workers has increased steadily until the mid-2000s, and about 70% in case of the largest company. In-house subcontracting was used as a strategy of the company to increase the quantity flexibility of employment and to save labor costs. The in-house subcontracting company needed company-specialized skills, and the internal labor market was formed because the rate of full-time workers was high and the turnover rate was low. The in-house subcontractor introduced long-term business relationship with the steel factory by introducing the equipment and materials necessary for the performance of the work, and the factory implemented the productivity improvement policy of the in-house subcontractor, and the win-win relationship between the factory and in-house subcontractor was developed. The trade union did not oppose the idea that the expansion of in-house subcontracting contributed to corporate profits, the stability of employment of the members and maintenance of their working conditions. Since 2000, the steel factory has pursued the transformation of in - house subcontractors into subsidiaries, which has been supported by capital relations. By the way, since the mid-2000s, there has been an increase in the number of regular workers' employment. The major factors are as follows: more strengthened compliance with laws and regulations, the higher quality request of customers, stricter keeping of deadlines, and problem in recruiting of workers at in-house subcontract companies. The wage gap between the factory and in - house subcontracting was less at company B than at company S, and the wage level of in - house subcontracting was about 90% of the factory at company B. The relatively small gap at company B seems to be due to the union's movement of narrowing the gap, low market dominance and unfavorable labor market. The internal labor market has been formed in the in-house subcontracting, and the wage gap is not large, and the possibility of labor disputes is low. Industrial relations are stable in the in-house subcontract company as well as the factory. The stabilization of labor-management relations in the steel industry in Korea is required to reduce the wage gap between the factory and in-house subcontract enterprises by raising productivity and expanding the internal labor market at in-house subcontract enterprises.

Why are Cleaning Workers Precarious? - Subcontracted Female Cleaning Labour and Fictional Korean Social Protection (청소노동자는 왜 불안정(precarious)한가? -하청 여성 청소노동과 한국 사회안전망의 허구성)

  • Lee, Sophia Seung-yoon;Seo, Hyojin;Park, Koeun
    • Korean Journal of Labor Studies
    • /
    • v.24 no.2
    • /
    • pp.247-291
    • /
    • 2018
  • This study investigates the employment structure and the social safety net experience of the subcontracting cleaning workers in Korea, who have been main targets of the labor outsourcing despite the necessity and permanence of their labour. This study specifically focuses on the fact that these subcontracting cleaning workers are mostly female and in their old age, and analyzes how the combination of their age, gender, and employment structure leads to the (mis)match with the Korean social security system. Case study with in-dept interview method has been conducted to the old-aged female subcontracting cleaning workers in Korea. The result of this study is as follows. It was the income insecurity that led them to (re)enter the labour market, and the cleaning work was the almost the only wage work they could do considering their age and gender. Cleaning workers are mostly employed in the subcontracting company, and thus their labour contracts depend on the business contract period between the original and subcontracting company. Consequently, their employment relationship is mostly insecure unless they are guaranteed employment succession through the collective agreement of trade union. Moreover, it has been discovered that the employment insecurity due to the indirect employment relationship led to the poor labour conditions, low wage, and the exclusion from the social safety net.

A Machine Cell and Part Family Formation Procedure in Considering the Duplication and Subcontracting (중복설계와 하청을 고려한 셀 및 부품군 형성 절차)

  • Mun, Chi-Ung;Kim, Hyo-Nam;Lee, Sang-Yong
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.2
    • /
    • pp.224-231
    • /
    • 1993
  • This paper propose a procedure to form the cell and part family using both of similarity coefficient method and mathematical programming in order to slove the exceptional part and bottleneck machine problems. In the procedure proposed by this paper, the machine duplication and subcontracting are considered to slove the bottleneck machine and intercellular moving part problems An example is given to show how this procedure works.

  • PDF

A Study on the Spatial Features of Shipbuilding Subcontract Structures (조선산업 하청구조의 공간 특성에 관한 연구)

  • 우연섭
    • Journal of the Korean Geographical Society
    • /
    • v.39 no.1
    • /
    • pp.116-131
    • /
    • 2004
  • The purpose of this study is to inquiry spatial features of shipbuilding subcontract structures. These days, firms are trying to get their goals by wav of production system which is related to other firm. Shipbuilding subcontract structures which builds complex and grand plant show a different peculiarity according to spatial features having rules of business relations with contracting firms. First of all, internal subcontracting firms which takes part in the production process of contracting firm and shipbuilding cooperative complex firms which showing a peculiarity of spin-off firms are closely related with contracting firm. And firms in Changwon that have a specialized with machine industry and those of Busan that have made development in marine equipment industries traditionally are connected with subcontract relations because of a high level of specialization relatively. On the other hand, subcontracting firms which range from non-localized and provide standardized products are less connected with contracting firm. In order to develop of Korea' shipbuilding industry, first, close cooperative relation is important with subcontracting firms which concentrate internal and outside contacting firm. And, it is necessary to strengthen selective business relations with far distance firms which are specialized in technology.

A Model for Assessing Maximum Overtime Rate in Labor Subcontracting Practices

  • Nassar, Khaled;Hosny, Ossama
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.18-27
    • /
    • 2012
  • Despite the rapid development in the construction industry due to the changing new technologies, many projects still fail to meet target deadlines. Shortage in manpower and skilled laborers is one of the main reasons for such delays. Markets with high economic growth and economic expansion (such as Gulf Countries in the Middle East) may have pronounced labor the shortages. Labor subcontracting practices are used sometimes to increase production rates and meet project deadlines. This paper explains and analyses labor subcontracting practices currently being used in many places around the world (and especially in the Gulf Countries) and in particular defines a maximum overtime rate for laborers in the laborer-subcontracting method ensuring that the contractor gains both the time saved during overtime and also reduces the cost per unit produced. The mathematical model used formalizes a closed-form equation for overtime pay in similar situations and as such can be applicable worldwide. Data was collected from representative projects that employed such practices from various trades. Validation of the model and formula has been tested successfully by analyzing historic data. The results prove that contractors often do not reach the optimum use of their practices resulting in a higher cost per unit. The presented model and the analysis should be of interest to many contractors currently involved in the practice or considering its use and to those who wish to find new methods that would help in eliminating as much wastes as possible by allocating their resources in the most efficient way.

Spatial Features and Implications of Subcontracting Networks by a Large Firm: The Case of the Display Division of LG Electronics in Kumi, Korea (대기업 하청거래 네트워크의 공간적 특성 및 함의: LG전자 디스플레이 사업본부를 사례로)

  • 이철우
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.4 no.1
    • /
    • pp.19-35
    • /
    • 2001
  • This paper is concerned with the relationships between large firms with global reaches in their markets and subcontracting firms, mostly small and medium-sized firms. It then attempts to focus in more detail on the dynamic relational dimensions between the two. In doing so, we draw upon the secondary data and the results of interviewing survey with some senior managers. The empirical study shows that the localisation of subcontracting networks have been increasingly reinforced thanks to the increasing tendency of vertical disintegration by LC. However, it is identified that there is a tendency that local subcontractors are specialised in producing relatively low value-added and low technology-intensive electronic parts/components. Based on these results, the author suggests the implications of regional economic development in the context of innovation and learning.

  • PDF

A Feasibility Study on Semi-Cash Payment of Construction Subcontracting (건설 하도급공사에서 현금성결제수단 적용의 타당성 분석)

  • Koo Jeong-San;Jung Sung-Hun;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.311-316
    • /
    • 2004
  • According to subcontracting company's capital circumstanre change for the worse by price regionalism and long bill supply and demand, bill principal parts settlement means were introduced. But, performance disgrace is inactive except some corporation. The purpose of this study is presenting loss and gain datum point that is standard of economical price disbursement means at construction subcontracting construction price settlement connection corporation purchaser gold Beaning means application and supply basis data. economical gains by high cash specific gravity

  • PDF

Types of Unfair Activity under Subcontracting and their Solutions: Qualitative Research Design

  • Ji-Heon HA;Tae-Hyung KIM
    • The Journal of Industrial Distribution & Business
    • /
    • v.14 no.8
    • /
    • pp.19-25
    • /
    • 2023
  • Using a procurement and construction stage emphasis on the capabilities of the Sub-Contractor (SC), the present research aims to discover the types of unfair activities between the Main Contractor (MC) and SC and their influence on project completion. This research also tries to figure out solutions which can reduce unfair activities between MC and SC. Research design, data and methodology: The qualitative textual analysis was selected for the current research and has been used by numerous previous researchers commonly to review relevant themes in the prior resources and suggested for researchers who conduct a reviewing procedure to analyze meta-analysis approach for figuring out better research findings from prior resources. Results: The result indicates the prevalence and consequences of bid shopping, emphasizing the need for transparency and fair bidding practices. Late payment issues were also found to be crucial for subcontractors' financial stability, urging the implementation of prompt payment legislation and agreements. Conclusions: In conclusion, the research revealed that subcontracting is common in construction projects, with general contractors relying on multiple subcontractors to carry out specific work items. The accomplishment of building projects hinges on the collaborative efforts between the main contractor (MC) and subcontractors (SCs), each focusing on different aspects of the project.

Improvement of Contract Change Order System for the Fairness of Subcontracting in Public Construction Projects (공공건설공사의 하도급 거래 공정화를 위한 계약변경 제도개선 방향)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.3-10
    • /
    • 2020
  • Subcontracting of construction is essential to carry out public construction projects. Subcontractor of the construction work shall enter into a contract with the original contractor without directly entering into a contract with the owner. Subcontracts are therefore greatly affected by the original contract with the owner. To protect subcontractors, the Fair Trade Act is enacted and the construction company's standard subcontracting contract is in operation. However, subcontracts are not properly reflected in the Government contract system, which deals with the relationships between the owner and the original contractor. In particular, the subcontractor may complain of difficulties at the public construction site as such procedures are not properly reflected in the construction work standard subcontract, although various procedures shall be carried out depending on the amount when change order occurs in subcontracts. Thus, the direction of improvement of subcontracting systems was proposed in the case of change order at public construction project sites as follows: First, the rights of subcontractors should be strengthened. Second, in order to resolve the information non-identity, subcontractors should have access to information related to subcontracts. Third, the status of subcontractor shall be guaranteed by reflecting the characteristics of the subcontract when the original contract for public works is concluded. Fourth, the dispute settlement method should be prioritized over litigation in order to fair subcontracting.