• Title/Summary/Keyword: Studs

Search Result 230, Processing Time 0.026 seconds

Shear resistance of stud connectors in high strength concrete

  • Lee, Young Hak;Kim, Min Sook;Kim, Heecheul;Kim, Dae-Jin
    • Structural Engineering and Mechanics
    • /
    • v.52 no.4
    • /
    • pp.647-661
    • /
    • 2014
  • The use of steel-concrete composite members has been significantly increased as they have the advantages of the reduction of cross sectional areas, excellent ductility against earthquake loadings and a longer life span than typical steel frame members. The increased use of composite members requires an intensive study on the shear resistance evaluation of stud connectors in high strength concrete. However, the applicability of currently available standards is limited to composite members with normal and lightweight strength concrete. In this paper, push-out tests were performed on 24 specimens to investigate the structural behavior and shear resistance of stud connectors in high strength concrete. Test parameters include the existence of shear studs, height to diameter ratio of a shear stud, its diameter and concrete cover thickness. A shear resistance equation of stud connectors is proposed through a linear regression analysis based on the test results. Its accuracy is compared with those of existing shear resistance equations for studs in normal and lightweight concrete.

Fatigue analysis of crumble rubber concrete-steel composite beams based on XFEM

  • Han, Qing-Hua;Yang, Guang;Xu, Jie;Wang, Yi-Hong
    • Steel and Composite Structures
    • /
    • v.25 no.1
    • /
    • pp.57-65
    • /
    • 2017
  • The fatigue fracture of studs is the main reason for failure of composite beams based on massive engineering practices. Hence, studying the laws of cracks initiation and propagation are of great directive significance. eXtended Finite Element Method (XFEM) is an effective method in solving moving discontinuous problems in recent years. This paper extends our recent work on the fatigue damage analysis of stud shear connectors in the steel and crumble rubber concrete (RRFC) composite beams based on XFEM. The process of crack initiation to failure of the stud is simulated and an effective calculation criteria for the fatigue life of the composite beams is put forward. After the reliability of the numerical analysis is verified based on tests results, the extensive parametric study is conducted concerning effects of different rubber contents, shear connection degrees and the stress amplitudes. Results show that with the increasing rubber contents and shear connection degrees, the fatigue lives of composite beams increase obviously. Furthermore, the relationship between the fatigue life of the stud at the edge of the shear span and the whole composite beams is studied. Finally, the S-N curves of the single stud and the whole composite beams are put forward based on XFEM.

Evaluation of Condensation Resistance of Steel Stud Wall Corner Details in Modular Buildings (스틸 스터드 모듈러 건축물 접합부위의 결로방지성능 개선방안 평가)

  • Oh, Ji Hyun;Yang, Si Won;Cho, Bong Ho;Kim, Sun Sook
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.3
    • /
    • pp.107-114
    • /
    • 2014
  • Modular systems are widely used in various building types including housing, dormitory, and barracks. Steel studs have many advantages over other materials as construction components of modular buildings in terms of seismic performance, durability and maintenance. However, steel stud modular systems also have weakness in condensation resistance due to high thermal conductivity of steel. The purpose of this study is to investigate the condensation resistance of steel stud wall corner details in modular buildings by thermal simulation. The condensation resistance was evaluated by temperature difference ratio according to ISO 13788. The result showed that there was little difference between the alternatives of adding cavity and insulation. Separation of interstitial steel studs showed outstanding effect on the improvement of temperature difference ratio.

Shear behavior of concrete-encased square concrete-filled steel tube members: Experiments and strength prediction

  • Yang, Yong;Chen, Xin;Xue, Yicong;Yu, Yunlong;Zhang, Chaorui
    • Steel and Composite Structures
    • /
    • v.38 no.4
    • /
    • pp.431-445
    • /
    • 2021
  • This paper presents experiments and theoretical analysis on shear behavior of eight concrete-encased square concrete-filled steel tube (CECFST) specimens and three traditional reinforced concrete (RC) specimens. A total of 11 specimens with the test parameters including the shear span-to-depth ratio, steel tube size and studs arrangement were tested to explore the shear performance of CECFST specimens. The failure mode, shear capacity and displacement ductility were thoroughly evaluated. The test results indicated that all the test specimens failed in shear, and the CECFST specimens enhanced by the interior CFST core exhibited higher shear capacity and better ductility performance than that of the RC specimens. When the other parameters were the same, the larger steel tube size, the smaller shear span-to-depth ratio and the existence of studs could lead to the more satisfactory shear behavior. Then, based on the compatible truss-arch model, a set of formulas were developed to analytically predict the shear strength of the CECFST members by considering the compatibility of deformation between the truss part, arch part and the steel tube. Compared with the calculated results based on several current design specifications, the proposed formulas could get more accurate prediction.

DEVELOPMENT OF CONCRETE FILLED TUBE AS A PILLAR PILE FOR TOP DOWN METHOD

  • Jee-Yun Song;Hong-Chul Rhim;Seung-Weon Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.808-813
    • /
    • 2009
  • Top-down method is widely used for urban area construction for its advantages in reducing environmental problems such as dust and noise, and saving construction cost depending on given conditions of a construction site. Because the excavation and construction of super- and sub-structures of the building have to be proceeded simultaneously, a column has to be embedded prior to excavation. This column is called a pillar column or pre-founded column. Usually a wide flange section is used for these columns. To place the columns, usually the diameter of casing holes needs to be larger than the section of the wide flange itself in order to accommodate a couple of tremie pipes for pouring concrete. In this paper, a newly developed method of using circular pipe as an alternative to the existing wide flange section is discussed. The crucial part of the new method is to develop a connection between the circular column and concrete flat slabs. For shear force transfer from concrete slab to the concrete filled tube (CFT) column, shear jackets with studs and shear bands are proposed. The studs are welded on the jackets at shop and placed around the circular column on site. The shear bands are welded on the outer side of the CFT at shop and inserted into ground with the CFT. Test results and application of the method to a construction site are also provided in this paper.

  • PDF

Behavior of Hybrid Stud under Compressive Load (복합스터드의 압축 좌굴 거동)

  • Lee, Sang Sup;Bae, Kyu Woong
    • Journal of Korean Society of Steel Construction
    • /
    • v.16 no.5 s.72
    • /
    • pp.609-619
    • /
    • 2004
  • An investigation was conducted on the activities around Europe in order to solve the problem of the thermal bridging of steel studs, which had caused a significant disadvantage. This study included the following: diminishing the contact area between the studs and the sheathing, lengthening the heat transfer route, replacing the steel web with a less conductive material, and placing foam insulation in locations where the thermal shorts are most critical. Although energy efficiency is usually the focus of such foreign cases because their stud application is mostly limited to low-rise residential buildings, both structural and thermal performance are taken into consideration in this study because these target middle-story buildings. A hybrid stud composed of steel and polymer was also developed. This hybrid stud, which is 150 SL in size, is made of a galvanized steel sheet (SGC58) and a glass fiber reinforced polymer (GFRP) withepoxy bonding. A total of 32 specimens were manufactured. Its parameters comprise two types of connection detail,s: the thickness of steel (1.0mm and 1.2mm) and of the GFRP (4mm-4ply and 6mm-6ply), and the ratio of the length to the depth (L/D = 3, 6, 9, 12). Steel stud specimens with the same conditions were compared to the hybrid stud. The test revealed that in the case of the steel specimen with a thickness of 1.0mm, the maximum load of hybrid studs increased an average of 1.62 times comparedto that of the steel stud. In the case of the steel specimen with a thickness of 1.2mm, on the other hand, the average increase was 1.46times. All specimens showed full composite action until the collapse.

An Experimental Study of Demountable Bolted Shear Connectors for the Easy Dismantling and Reconstruction of Concrete Slabs of Steel-Concrete Composite Bridges (강합성 교량의 콘크리트 바닥판 해체 및 재시공이 용이한 분리식 볼트접합 전단연결재에 관한 실험적 연구)

  • Jung, Dae Sung;Park, Se-Hyun;Kim, Tae Hyeong;Kim, Chul Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.751-762
    • /
    • 2022
  • Welded head studs are mainly used as shear connectors to bond steel girders and concrete slabs in steel-concrete composite bridges. For welded shear connectors, environmental problems include noise and scattering dust which are generated during the removal of damaged or aged slabs. Therefore, it is necessary to develop demountable shear connectors that can easily replace aged concrete slabs for efficient maintenance and thus for better management of environmental problems and life cycle costs. The buried nut method is commonly studied in relation to bolted shear connectors, but this method is not used in civil structures such as bridges due to low rigidity, low shear resistance, and increased initial slip. In this study, in order to mitigate these problems, a demountable bolted shear connector is proposed in which the buried nut is integrated into the stud column and has a tapered shape at the bottom of an enlarged column shank. To verify the performance of the proposed demountable stud bolts in terms of static shear strength and slip displacement, a horizontal shear test was conducted, with the performance outcomes compared to those of conventional welded studs. It was confirmed that the proposed demountable bolted shear connector is capable of excellent shear performance and that it satisfies the slip displacement and ductility design criteria, meaning that it is feasible as a replacement for existing welding studs.

The Tendency and Implementation of Six Sigma (식스 시그마 동향과 수행에 관한 연구)

  • 이도경
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.25 no.1
    • /
    • pp.29-34
    • /
    • 2002
  • Six Sigma is one of the most active subjects in quality management. This studs deals with some existing weaknesses that may wise in implementing Six Sigma in real world situations. The main weaknesses discussed here include the lack of understanding of cultural aspects on the nations and industries, the poor linkage between quality, finance and accounting from the bottom line point of view, and the difficult development process of metrics for all improvement results to validate the effect of Six Sigma. Finally, the key success characteristics for a good Six Sigma project are presented.

Ultrasonic Detection of Small Crack in Studs[Bolts] by Time Difference of Thread Signals(TDTS) (초음파진행 시간차에 의한 STUD[BOLT] 나사산의 미세한 결함검출)

  • Suh, D.M.;Park, D.Y.;Kim, C.K.
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.10 no.1
    • /
    • pp.38-46
    • /
    • 1990
  • It is difficult to detect such flaws as stress - corrosion cracking or corrosion wastage(loss of bolt diameter) in the threads. In many cases the critical size of a flaw is very small(1-2 mm order). This paper describes how it is possible to discriminate small flaw indications in threads using the time difference or thread signals(TDTS) by a signal-conditioning technique.

  • PDF