• Title/Summary/Keyword: Stream Flood

Search Result 505, Processing Time 0.034 seconds

The Study on the Development of Flood Prediction and Warning System at Ungaged Coastal Urban Area - On-Cheon Stream in Busan - (미계측 해안 도시 유역의 홍수예경보 시스템 구축 방법 검토 - 부산시 온천천 유역 대상 -)

  • Shin, Hyun-Suk;Park, Yong-Woon;Hong, Il-Pyo
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.6 s.179
    • /
    • pp.447-458
    • /
    • 2007
  • In this study, the coastal urban flood prediction and warning system based on HEC-RAS and SWMM were investigated to evaluate a watershed of On-Cheon stream in Busan which has characteristics of costal area cased by flooding of coastal urban areas. The basis of this study is a selection of various geological data from the numerical map that is a watershed of On-Cheon stream and computation of hydrologic GIS data. Thiessen method was used for analyzing of rainfall on the On-Cheon stream and 6th regression equation, which is Huff's Type II was time-distribution of rainfall. To evaluate the deployment of flood prediction and warning system, risk depth was used on the 3 selected areas. To find the threshold runoff for hydraulic analysis of stream, HEC-RAS was used and flood depth and threshold runoff was considered with the effect of tidal water level. To estimate urban flash flood trigger rainfall, PCSWMM 2002 was introduced for hydrologic analysis. Consequently, not only were the criteria of coastal urban flood prediction and warning system decided on the watershed of On-Cheon stream, but also the deployment flow charts of flood prediction and warning system and operation system was evaluated. This study indicates the criteria of flood prediction and warning system on the coastal areas and modeling methods with application of ArcView GIS, HEC-RAS and SWMM on the basin. For the future, flood prediction and warning system should be considered and developed to various basin cases to reduce natural flood disasters in coastal urban area.

The Study on Analyzing Overflow in River (MIKE FLOOD를 이용한 하천 범람 해석에 관한 연구)

  • Choi, Gye-Woon;Byeon, Seong-June;Chung, Youn-Joong;Kim, Young-Kyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1236-1240
    • /
    • 2006
  • Flooding is an inevitable problem for many cities. The study has depended on a combined approach of physically based modeling and GIS. The stream network is structured by MIKE11 for basis of a network and extended by MIKE21 to make like 2D analysis. This method is called alternative 2D analysis. In this study, one of area in Korea is used to analyze overflow of stream. Flood risk of the area looks like not so big because an elevation of this area is very high and slope is steep, but it is very dangerous area due to the typhoons. The tools to make flood risk map are MIKE11 and MIKE21 include GIS program. And map is expressed 3-D animation with MIKE Animator. As a result of this work, the flood risk map is made. And everyone who is not an expert can check dangerous area for flooding. At present, the method which is viable and easily confirmable must be promote because one of matters of common interest, which is of the general public, is the flood disaster.

  • PDF

The development of design-width prediction equation by using 12 local governments data collected from small stream of Korea (국내 12개 시·도 자료를 이용한 소하천 계획하폭 산정식 개발)

  • Choi, Changwon;Cheong, Tae Sung
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.3
    • /
    • pp.185-194
    • /
    • 2023
  • There are more than 22,300 small streams distributed nationwide in Korea, and they have various runoff characteristics depending on basin area, topography and land use. For small stream disaster management, establishing detailed design standards suitable for the small streams is important, but most of the formulas currently proposed in the small stream design standard are based on the river design standard aimed at national and local rivers or foreign river design standards. The design-width is an important factor in determining the size of the stream. It is determined by using design-flood discharges or more variables such as design-flood discharges, basin area, slop, etc in the small stream design standard. This study collected various characteristics information such as the design-flood discharges, basin area, river length and river slop, and design-width values from 4,073 small streams distributed in 12 cities and provinces in Korea to suggest the appropriated design-width formula. This study developed two design-width formulas by using the regression analysis which one is using the design-flood discharges and the other is using various variables such as the design-flood discharges, basin area, river length and river slope collected from the small steams. It is expected that both equations developed in here can be used for small stream disaster management, such as improving small stream design standard or establishing a comprehensive small stream maintenance plan.

Development of Flood Prediction Model using Hydrologic Observations in Cheonggye Stream (수문관측 기반의 청계천 홍수예측모델 구축)

  • Bae, Deg-Hyo;Jeong, Chang Sam;Yoon, Seong Sim
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6B
    • /
    • pp.683-690
    • /
    • 2008
  • The objectives of this study are to provide an observation-based urban flood prediction model and to evaluate their performance on a restored Cheonggye stream. The study area, which has its own unique hydrologic and flooding conditions that can be characterized the standard of flood occurrence by watergate opening and walk lane inundation, measured stream discharges at the 5 sites and watergate opening and walk lane inundation through the main stream since 2006. This study derived the relationship between precipitation intensity and watergate opening and walk lane inundation time by using the observations of 2006 and verified their performance on 2007 flood events. The result showed that the coefficients of determination are ranged on 0.57-0.75, which would be acceptable if considering the complexity of the area and the proposed model simplicity. It also suggested the continuous observation of these properties is required for further improvement of the models.

Comparison of Flood Inundation Models using Topographic Feature (지형요소를 이용한 홍수범람해석 모형의 비교)

  • Moon, Changgeon;Lee, Jungsik;Cho, Sunggeun;Shin, Shachul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.1
    • /
    • pp.69-77
    • /
    • 2014
  • The objective of this study is to compare flood inundation models for small stream basin. HEC-RAS model was used for the analysis of one dimensional hydraulics and HEC-GeoRAS, Ras Mapper and RiverCAD models were applied for the flood inundation analysis in Gum Chung stream. Flood inundations are to simulate by flood inundation models using observed data and rainfall on each frequency and to compare with inundation area based on the flood plain maps. The results of this study are as follows; Area of flood inundations by HEC-GeoRAS model is similar to that of flood plain map and appears in order of RAS Mapper and RiverCAD model. Flood inundation area by RiverCAD model is to estimate lager than that of RAS Mapper and HEC-GeoRAS model in flood area on each frequency and the results show that they have a little difference in models of flood inundation analysis at small stream. Comparing the area of flood inundations by flood depth, the results of three models are relatively similar in flood depth as 2.0 m below, and RiverCAD model shows a significant difference in flood depth as 2.0 m or more.

A Feasibility Study on Supplying Stream Minimum Flow Using Detention Storage in Developing Planned District (단지계획지구 홍수저류지의 하천유지유량 공급방안 연구)

  • Noh Jaekyoung;Park Hyun-goo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1219-1223
    • /
    • 2005
  • This study was accomplished to confirm the possibility of supplying stream minimum flow from detention storage which was determined to reduce peak flows of flood within developing planned district. The results analyzed was summarized as follows; Firstly, Sin-gil district situated in Ansan city was selected, of which watershed area has $0.56km^2$. And detention storage was determined to $5,370m^3$ from analyzing flood volume by the SCS unit hydrograph method. Secondly, using Visual Basic ver 6.0, a detention storage water balance model was developed, in which simulation was based on conditioning storage inflow and outflow according to streamflow volume or rate state. And streamflow was simulated using the DAWAST model. Thirdly, detention operation scenarios were consisted of the combinations with inflow referencing streamflow of 5mm/day, 10mm/day and outflow referencing streamflow of 1mm/day, 2mm/day. The developed detention storage water balance model was operated to simulate daily water storages of detention sized on flood by scenarios. Stream minimum flows were able to be supplied during 209 days to 237 days per a year, total volume of stream minimum flows supplied for this period was analyzed to reach 27 to $55\% of yearly streamflow volume. If inflow criteria of streamflows to detention was considered to be established on a theoretical condition, it is expected to supply stream minimum flows of 20 to $30\% of yearly streamflow from stream to detention. Also to maximize function of supplying urban stream minimum flow from detention storages, sewage waters within developing planned district have to be treated and entered to detention inflow together with streamflows to enrich function of detention planned to reduce flood volumes.

  • PDF

Comparison of Flood Discharge and Velocity Measurements in a Mountain Stream Using Electromagnetic Wave and Surface Image (전자파와 수표면 영상을 이용한 산지하천 홍수유량 및 유속 계측 비교 연구)

  • Yang, Sung-Kee;Kim, Dong-Su;Yu, Kwon-Kyu;Kang, Meyong-Su;Jung, Woo-Yul;Lee, Jun-Ho;Kim, Yong-Seok;You, Ho-Jun
    • Journal of Environmental Science International
    • /
    • v.21 no.6
    • /
    • pp.739-747
    • /
    • 2012
  • Due to the difficulties for measuring flood discharge in the dangerous field conditions, conventional instruments with relatively low accuracy such as float still have been widely utilized for the field survey. It is also limited to use simple stage-discharge relationship for assessment of the flood discharge, since the stage-discharge relationship during the flood becomes complicated loop shape. In recent years, various non-intrusive velocity measurement techniques such as electromagnetic wave or surface images have been developed, which is quite adequate for the flood discharge measurements. However, these new non-intrusive techniques have little tested in the flood condition, though they promised efficiency and accuracy. Throughout the field observations, we evaluated the validity of these techniques by comparing discharge and velocity measurements acquired concurrently during the flood in a mountain stream. As a result, the flood discharge measurements between electromagnetic wave and surface image processing techniques showed high positive relationship, but velocities did not matched very well particularly for the high current speed more 3 m/s. Therefore, it should be noted here that special cares are required when the velocity measurements by those two different techniques are used, for instance, for the validation of the numerical models. In addition, authors assured that, for the more accurate flood discharge measurements, velocity observation as well as stage height is strongly necessary owing that the unsteady flow occurs during the flood.

Change of Flood Characteristics in the Down Stream of Keum River after the Ken River Estuary Dam Construction (금강하구언 건설후 금강하류의 홍수흐름특성변화)

  • 박승기;문종필;민진우;김태철;안병기
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.41-46
    • /
    • 1998
  • The purpose of the study was changed of Flood Characteristics in Down stream of Keum River by the Keum River Estuary Dam Construction. The water surface slope of Kuem river after the Keum River Estuary Dam construction was steeper then before. The flood control capacity increase after construction. But, Increasing sediment in Kuem river will be decreased flesh reservoir volume for yield irrigation.

  • PDF

Flood Discharge Analysis on Land Use Changes in Han Stream, Jeju Island (토지이용변화에 따른 한천유역의 홍수유출 변동 분석)

  • Yang, Se-Chang;Yang, Sung-Kee;Lee, Jun-Ho;Jung, Woo-Yul;Ko, Kwang-Hyo
    • Journal of Environmental Science International
    • /
    • v.24 no.4
    • /
    • pp.425-435
    • /
    • 2015
  • A number of projects for development have been done continuously due to the increase of tourist in Jeju Island. However flood disaster countermeasure due to urbanization is not considered during this development projects. This study is to make basic process for the flood estimation in Han stream of Jeju Island. The variation of stream discharge due the every 5 years' land use change from 1980 to 2005. Data for flood events (rainfall and discharge) were collected for HEC-HMS model. Clark method was used for unit hydrograph analysis. For the estimation of Clark unit hydrograph parameters, Kraven II and Sabol's empirical equations were applied. The peak discharge increased 9.9~33.67% and total discharge amount increased 12.53~30.21%. Also, time of concentration for peak discharge was reduced by 10 minutes for each event.

A Study on Flash Flood Warning Trigger Rainfall in Mountainous Area (산악지역 돌발홍수 기준우량 결정에 관한 연구)

  • Jun, Kye-Won;Oh, Chae-Yeon
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.1
    • /
    • pp.89-94
    • /
    • 2009
  • The purpose of this study is to estimate the critical flood discharge and flash flood trigger rainfall for alarm system providing for a flash flood in mountainous area. The flash flood need non-linear approaching method, because rainfall-runoff is nonlinear and it is difficult to explain the existing linear rainfall-runoff. Hydrological characteristics would be utilized to apply such as hydrologic modelling or basin management. This study was effectively estimated a topographic characteristic factor of basin using the GIS. Especially, decided stream order using GIS at stream order decision that is important for input variable of GCIUH. A flash floods defined as a flood which follows shortly after a heavy or excessive rainfall event, with a few hours. In this study, we gave a definition that a critical flood for alarm is the flood when valley depth judging dangerous depth is over 0.5m depth from the bottom of channel. Result that calculate threshold discharge to use GCIUH, at the Mureung valley basin, flash flood trigger rainfall was 16.34mm in the first 20minutes when the threshold discharge was $14.54m^3/sec$.