• Title/Summary/Keyword: Stream Flood

Search Result 508, Processing Time 0.023 seconds

Analysis of Flooding Variation and Flood Inundation According to Increasing Rainfall (강우량 증가에 따른 홍수량 변동 및 홍수범람 분석)

  • Kang, Bo-Seong;Yang, Sung-Kee;Jung, Woo-Yeol
    • Journal of Environmental Science International
    • /
    • v.24 no.4
    • /
    • pp.415-424
    • /
    • 2015
  • As global warming has accelerated to weather in recent years, and The frequent floods are creating heavy rains and typhoons followed by considerable damage in Jeju. This study estimated design flood discharges and flood stage in Jeju, considering climate change in connection with RCP scenario, the 5th IPCC Report recently published. It also analyzed the period which might be subject to the risk of flooding in downstream of Oedo Stream. As a result, it has analyzed that there might be a risk of flooding when there were 80 years or more rainfall events in 35 years that rainfall would have increased by 10%, 69 years that 100 years or more heavy rain and rainfall would have increased by 20%, and 104 years that 100 years or more heavy rain and rainfall would have increased by 20%. It is expected that this study results of rainfall increasing trend caused by climate change will be helpful to minimize the damage of floods which will secure the future of Jeju.

Calculation of the Flood Runoff of the River with Imaging Equipments (영상장비를 활용한 하천의 홍수유출량 산정)

  • Kang, Bo-Seong;Yang, Sung-Kee;Jung, Woo-Yeol;Kim, Yong-Seok
    • Journal of Environmental Science International
    • /
    • v.23 no.4
    • /
    • pp.585-594
    • /
    • 2014
  • This study Analyzed four of seven runoffs which had happened in 2012 in comparison with the runoffs shown in Kalesto data, using the fixed surface image velocimetry (FSIV) installed at Oedo stream, Jeju Island. As a result of identifying a runoff curve graph, it was analyzed that the flood runoffs calculated with two observation devices were almost equivalent. As the differences in peak flows were 10 $m^3/s$, 0.7 $m^3/s$ and 3 $m^3/s$, the very similar result values were calculated. Even though there were errors in RMSE(Root Mean Square Error) made by two observation devices according to the degree of the peak flow, the values of $R^2$ by flood event were 0.89, 0.87, 0.86 and 0.82, showing the result values almost close to 1. Therefore, there was a very high correlation in flood runoffs calculated with two observation devices. This research method was considered to be a very suitable method to measure unexpected flood runoffs which could happen in the island area such as Jeju island during bad weather.

Analysis of Inundation Characteristics for EAP of Highway in Urban Stream - Dongbu Highway in Jungrang Stream - (도시하천도로의 EAP수립을 위한 침수특성분석 - 중랑천 동부간선도로를 중심으로 -)

  • Lee, Jong-Ta;Jeon, Won-Jun;Hur, Sung-Chul
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.3 s.22
    • /
    • pp.69-76
    • /
    • 2006
  • An hydraulic and hydrologic analysis procedure was proposed to reduce the inundation damage of highway in urban stream, that could contribute the EAP and Traffic control planning of Dongbu highway in the Jungrang stream basin which is one of the representative urban area in Korea. We performed the HEC-HMS runoff analysis, and the UNET unsteady flow modeling to decide the inundation reaches and their characteristics. The high inundation risk areas were of Emoon railway bridge and the Wollueng bridge, which are inundated in the case of 10 year and 20 year frequency flood respectively. We also analyze the inundation characteristics under the various conditions of the accumulation rainfall and the duration. Flood elevation at the Wolgye-1 bridge exceed over Risk Flood Water Level(EL.17.84 m) when the accumulation rainfall is over 250 mm and shorter duration than 7 hr. When neglecting backwater effect from the Han river, inundation risk are highly at the reach C2(Wolgye-1 br. ${\sim}$Jungrang br., left bank), C1(Wolgye-1 br. ${\sim}$Jungrang br., right bank), D(Jungrang br. ${\sim}$Gunja br.) in order, but when consider the effect, the inundation risk are higher than the others at the reach D2(Jungrang br. ${\sim}$Gunja br., left bank) and E(Gunja br. ${\sim}$Yongbi br.), which are located downstream near confluence.

Estimating Critical Stream Power by the Distribution of Gravel-bed Materials in the Meandering River (만곡하천의 자갈하상재료 분포에 따른 한계수류력 평가)

  • Shin, Seung-Sook;Park, Sang-Deok;Lee, Seung-Kyu;Ji, Min-Gyu
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.2
    • /
    • pp.151-163
    • /
    • 2012
  • The distribution of gravel-bed materials in mountainous river is formed by the process of deposition and transportation of sediment responding to stream power of the latest flood that is over the certain scale. The particle size of bed material was surveyed in the longitudinal points of river and detail points of a specific meandering section and used to estimate the critical velocity and stream power. Yang's critical unit stream power and Bagnold's critical stream power for gravel-bed materials increased with the distance from downstream to upstream. Dimensionless shear stress based on the designed flood discharge in Shields diagram was evaluated that the gravel-bed materials in most survey points may be transported as form of bedload. The mean diameter in the meandering section was the biggest size in first water impingement point of inflow water from upstream and the second big size in second water impingement point by reflection flow. The mean diameters were relatively the small sizes in points right after water impingement. The range of mean critical velocity was 0.77~2.60 m/s and critical unit stream power was big greatly in first water impingement point. The distribution of critical stream power, range of 7~171 $W/m^2$, was shown that variation in longitudinal section was more obvious than that of cross section and estimated that critical stream power may be affected greatly in first and second water impingement point.

A Development of System for Flood Runoff Forecasting using Neural Network Model (신경망 모형을 이용한 홍수유출 예측시스템의 재발)

  • Ahn, Sang-Jin;Jun, Kye-Won
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.9
    • /
    • pp.771-780
    • /
    • 2004
  • The purpose of this study is to test a development of system for flood runoff forecasting using neural network model. As the forecasting models for flood runoff the neural network model was tested with the observed flood data at Gongju and Buyeo stations. The neural network model consists of input layer, hidden layer, and output layer. For the flood events tested rainfall and runoff data were the input to the input layer and the flood runoff data were used in the output layer. To make a choice the forecasting model which would make up of runoff forecasting system properly, real-time runoff of river when flood periods were forecasted by using neural network model and state-space model. A comparison of the results obtained by the two forecasting models indicated the superiority and reliability of the neural network model over the state-space model. The neural network model was modified to work in the Web and developed to be the basic model of the forecasting system for the flood runoff. The neural network model developed to be used in the Web was loaded into the server and was applied to the main stream of Geum river. For the main stage gauging stations mentioned above the applicability of the selected forecasting model, the Neural Network Model, was verified in the Web.

Influence of the Eco-park Development on Bird Community in Urban Stream (도시하천의 생태공원화가 조류군집에 미치는 영향)

  • 김정수;구태회
    • The Korean Journal of Ecology
    • /
    • v.26 no.3
    • /
    • pp.97-102
    • /
    • 2003
  • This study was carried out to understand the variation of bird community by eco-park development of urban stream, Yangjae stream, Seoul, from Jan. 1996 to Dec. 2001. After the development, slight change in the bird community happened; for example, the number of species increased(r²=0.729, p<0.05), but there was not any variation in the total number of birds(r²=0.050, p>0.05). Especially, the number of individuals in herons and ducks rose. We suggest that the change as caused by restoration of low revetment vegetation and artificial pond vegetation in flood plain. However, the number of sandpipers, plovers and wagtails inhabiting on the sands and gravels in stream fell down. It seems that it would be caused by construction of bicycle path on the flood plain. The number of songbirds was tended to go down to 2000, but increased in 2001. The decrease of songbirds might be attributed to irregular removals of bush. We suggested that riparian vegetation restoration and artificial ponds positively affected birds inhabitation, but bicycle path and irregular elimination of a bush negatively affected.

A Methodology for the Estimation of Design Flood of a Small Watershed (소하천유역(小河川流域)의 계획홍수량(計劃洪水量) 산정방법(算定方法)의 개발(開發))

  • Yoon, Yong Nam;Ahn, Tae Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.4 no.1
    • /
    • pp.103-112
    • /
    • 1984
  • This study is an effort to develop a series of empirical procedure for the determination of design flood for a small watershed based on the unit hydrograph theory. It is shown that a flood discharge of a watershed with a specific return period can be expressed as a product of its watershed area, rainfall factor, runoff factor and flood peak reduction factor. Since the procedures for the determination of rainfall factor and runoff factor were already developed in the previous study (13) a series of step-by-step procedure is devised to empirically determine the flood peak reduction factor in the present study. Using the methodology developed herein the 50-year design flood, which is of concern in the drainage of agricultural lands, is estimated for a watershed on upper Kyungan River and compared with the design floods by the existing methods now in use. The flood peak reduction factor was correlated with the dimensionless parameter consisted of the rainfall duration divided by the basin lag time, which was computed from the derived unit hydrographs by the method of moment. The unit hydrographs of various durations were synthesized by the method of build up and S-curve. A multiple correlation was also made between the basin lag time and the physiographic parameters of the watershed, i.e., the stream length and the average stream slope.

  • PDF

The Simulation of Flood Inundation of Namdae Stream with GIS-based FLUMEN model (GIS 기반 FLUMEN 모형을 이용한 남대천 홍수범람 모의실험)

  • Lee, Geun-Sang;Choi, Yun-Woong
    • Spatial Information Research
    • /
    • v.18 no.2
    • /
    • pp.25-34
    • /
    • 2010
  • This study simulated flood inundation each frequency rainfall using GIS spatial information and FLUMEN model for part of Muju-Namdae Stream. To create geomorphology for the analysis of flood inundation, Triangle Irregular Network(TIN) was constructed using GIS spatial interpolation method based on digital topographic map and river profile data, unique data source to represent real topography of the river areas. And also flood inundation was operated according to the levee collapse to consider extremely flood damage scenarios. As the analysis of result, the inundation area in the left levee collapse showed more high as 3.13, 3.69, and 4.17 times comparing with one of right levee for 50, 100, and 200 year frequency rainfall and showed 1.00, 2.15, and 3.34 times comparing with one of right levee in the inundation depth with over 1.0 meter, which can cause casualties. As the analysis of inundation area of the inundation depth with over 1.0 meter, which can cause casualties in left levee collapse, it increased more high as 263% and 473% when 50 year frequency change into 100 and 200 year frequency. Also As the analysis of inundation area of the inundation depth with over 1.0 meter in right levee collapse, it increased high as 123% and 142% when 50 year frequency change into 100 and 200 year frequency. Especially, the inundation area of the inundation depth with 3.0~3.5m showed more high as 263% and 489% when 50 year frequency change into 100 and 200 year frequency. It is expected that flood inundation map of this paper could be important decision making data to establish land use planning and water treatment measures.

The estimation of water level fluctuation in the down stream water mark by water level fluctuation in the upper region water mark (상류지점 수위표 수위변동에 따른 하류지점 수위표 수위변동예측)

  • Choi, Han-Kuy;Lim, Yoon-Soo;Baek, Hyo-Seon
    • Journal of Industrial Technology
    • /
    • v.30 no.B
    • /
    • pp.83-89
    • /
    • 2010
  • Generally, the accuracy of the prediction of flood elevation is difficult to identify due to the sedimentation on a river bed, earth and sand being moved by flow, and localized torrential downpours caused by climate change. It is also because of natural and artificial influences on rivers. To predict river floodings successfully, more precise and reliable flood elevation prediction system is needed, in which the concentration time of downstream is numerically interpreted through analyzing and utilizing the watermark of the upper region. Therefore, this research analyzed the prediction methods of the changes in water levels, which use the watermarks of the upper region. The watermarks which impacts the spot being predicted of flood was selected through floodgate analysis and correlation analysis. With the selected watermarks, a statistically reliable regression equation was yielded.

  • PDF

Improvement of Flood Disaster Mitigation on Long-term Development Plan (장기개발계획상의 방재제도 개선)

  • 고영찬;오남선
    • Journal of Korean Port Research
    • /
    • v.15 no.1
    • /
    • pp.107-119
    • /
    • 2001
  • Disaster mitigation, especially as a concept similar to damage mitigation caused by heavy rainfalls and flood is closely related to long-term development plan. This plan of an harbor area where is located in lower region is established and carried under consideration of disaster mitigation concept such as internal drainage and so on. Flood damage is somewhat predictable in accordance with height, stream and rainfall characteristics of the region. Therefore it is necessary to establish national and urban plan under consideration of this fact. But this consideration of existing regulation and institution is insufficient and improvement of regulation and institution is needed. This consideration of disaster mitigation fields is regulated declaratively and inclusively in national plan which is established in broad region, and specifically and detailedly in urban plan which is established in narrow region. The program to improve regulation and institution is proposed in order to consider disaster mitigation fields as a level of this plan.

  • PDF