• Title/Summary/Keyword: Standard schedule

Search Result 237, Processing Time 0.026 seconds

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

The effect of short and long duration sintering method on microstructure and flexural strength of zirconia (단시간과 장시간의 소결방법에 따른 지르코니아의 굴곡 강도와 미세구조의 변화)

  • Lee, Ha-Bin;Lee, Tae-Hee;Kim, Ji-Hwan
    • Journal of Technologic Dentistry
    • /
    • v.42 no.2
    • /
    • pp.73-79
    • /
    • 2020
  • Purpose: The aim of this study was to investigate the influence of short and long duration sintering on microstructure and flexural strength of zirconia. Methods: To conduct three-point bending test, Zirconia specimens are milled according to ISO 6872 guidelines(N=18, n=9 per group). Two specimens group(n=8) is sintered for 10 hours(Standard schedule) and 3 hours(Speed schedule) at the peak temperature of 1550℃ with silicon carbide sintering furnace. Flexural strength of specimens are measured by instron. After coating each specimen(n=1), microstructure of specimens is observed using Scanning Electron Microscope(SEM). T-test was utilized to statistically assess the data. Results: The mean and standard deviation value of the flexural strength for standard schedule group are 578.15±57.48Mpa, that of speed schedule are 465.9±62.34Mpa. T-test showed significant differences in flexural strength between two zirconia specimen group which applied standard schedule and speed schedule respectively(p<0.05). Conclusion: The result of this study showed that the increase in sintering time led to increased grain size, and also to a positive effect on the flexural strength.

Some Conjectures for the Newsvendor Problem under Progressive Multiple Discounts (점진적 복수할인이 있는 뉴스벤더 문제에 관한 몇 가지 추측)

  • Won, You-Kyung
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.36 no.3
    • /
    • pp.27-43
    • /
    • 2011
  • This paper investigates properties of the newsvendor problem under a schedule involving progressive multiple discounts compared with the standard newsvendor problem under a no-discounts schedule. Unlike most conventional approaches using the criticial fractile to analyze the retailer and/or supplier behavior(s) in the newsvendor problem, our approach uses riskless profit. From the properties revealed through a series of computational experiments, two conjectures regarding the relationship between the expected profits of both newsvendor problems as a generalization over Khouja's argument (1995) are raised. Those conjectures encourage newsvendors who may face budget or warehouse capacity restriction to use the extended model under a multiple-discounts schedule rather than the standard model with no-discounts schedule because they apply for every order quantity as well as the optimal order quantity. In addition to the conjectures, some insightful results are found to justify the implementation of a multiple-discounts schedule from the computational experiments and a new interpretation for implementation of a multiple-discounts schedule that has not been addressed in Khouja is provided.

Harvesting schedule effects on forage yield and nutritive values in low-lignin alfalfa

  • Xu, Xuan;Min, Doohong
    • Journal of Animal Science and Technology
    • /
    • v.64 no.2
    • /
    • pp.262-273
    • /
    • 2022
  • Under the four-cut system, low-lignin alfalfa (Medicago sativa L.) may extend harvesting intervals improving harvest management flexibility and producing forage products with higher nutritive values. The objective of this study was to compare forage yield and nutritive values of low-lignin and conventional alfalfa varieties when applied to six different harvest schedules in the first (2016) and second (2017) production years. There were 12 treatments of two alfalfa varieties as whole plots and six harvest schedules as subplots. Across harvest schedules, there were four cuttings in two production years. Three harvest intervals including "Standard" (high quality, HQ), "Standard+5-day" (medium quality, MQ), and "Standard+10-day" (high yield, HY) were chosen for the first cutting, and 30-day (HQ) and 35-day (HY) for the second cuttings. The third and fourth cuttings in 2016 were timed near final harvest date and in 2017 occurred at 35-day (MQ) and 40-day (HY). Variety by harvest schedule interaction was not significant, but the whole plot and sub-plot effects were significant. Hi-Gest 360 was consistently higher in nutritive value and with a similar yield as Gunner. Harvest schedules did not consistently differ in forage yield and nutritive values. HS-1 ("Standard" + 35-day + Medium Quality + High Yield) with shorter first two cutting intervals provided lower acid detergent fiber (ADF), neutral detergent fiber (NDF), higher relative feed value (RFV), and similar forage yield compared to other schedules. HS-1 had the highest economic incomes when considering RFV and yield among the six different harvest schedules.

Three Weekly Versus Weekly Cisplatin as Radiosensitizer in Head and Neck Cancer: a Decision Dilemma

  • Negi, Preety;Kingsley, Pamela Alice;Srivastava, Himanshu;Sharma, Surender Kumar
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.4
    • /
    • pp.1617-1623
    • /
    • 2016
  • Cisplatin-based concurrent chemoradiation plays an undisputed key role as definitive treatment in unresectable patients with locally advanced squamous cell carcinoma head and neck or as an organ preservation strategy. Treatment with 100 mg/m2 3-weekly cisplatin is considered the standard of care but is often associated with several adverse events. The optimum drug schedule of administration remains to be defined and presently, there is insufficient data limiting conclusions about the relative tolerability of one regimen over the other. This review addresses regarding the optimal dose schedule of cisplatin focusing mainly on three-weekly and weekly dose of cisplatin based concurrent chemoradiotherapy in locally advanced head and neck cancer with an emphasis on mucositis, dermatitis, systemic toxicity, compliance, and treatment interruptions. To derive a definitive conclusion, large prospective randomized trials are needed directly comparing standard 3-weekly cisplatin ($100mg/m^2$) with weekly schedule ($30-40mg/m^2$) of concurrent cisplatin based chemoradiotherapy in locally advanced squamous cell carcinoma head and neck.

Automated Methodology for Linking BIM Objects with Cost and Schedule Information by utilizing Geometry Breakdown Structure (GBS)

  • Lee, Kwangjin;Jung, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.637-638
    • /
    • 2015
  • There has been growing interests in life-cycle project management in the construction industry. A lot of attention is given to Building Information Modeling (BIM) which stores and uses a variety of construction information for the life cycle of project management. However, due to the additional workload arising from BIM, its expected effects versus its input costs are still under discussion in practice. As an attempt to address this issue, one of previous studies suggested an automated linking process by developing Standard Classification Numbering System (SCNS) and Geometry Breakdown Structure (GBS) to enhance the efficiency of integration process of BIM objects, cost, and schedule. Though SCNS and GBS facilitates identifying all different dataset, making object sets and linking schedule activities still needs to be manually done without having an automated tool. In this context, the purpose of this paper is to develop and validate a fully automated integration system for 3D-objects, cost, and schedule. A prototype system for single family homes (Hanok) was developed and tested in order to verify its efficiency.

  • PDF

A Study on the Propriety of the Medical Insurance Fee Schedule of Surgical Operations - In Regard to the Relative Price System and the Classification of the Price Unit of Insurance Fee Schedule - (수술수가의 적정성에 관한 연구 - 상대가격체계와 항목분류를 중심으로 -)

  • Oh Jin Joo
    • Journal of Korean Public Health Nursing
    • /
    • v.2 no.2
    • /
    • pp.21-44
    • /
    • 1988
  • In Korea, fee-for service reimbursement has been adopted from the begining of medical insurance system in 1977, and the importance of the relative value unit is currently being investigated. The purpose of this study was to find out the level of propriety of the difference in the fees for different surgical services, and the appropriateness of the classification of the insurance fee schedule. For the purpose of this study, specific subjects and the procedural methodology is shown as follows: 1. The propriety of the Relative Price System(RPS). 1) Choice of sample operations. In this study, sample operations were selected and classified by specialists in general surgery, and the number of items they classified were 32. For the same group of operations the Insurance Fee Schedule(IFS) classified the operations into 24 separate items. In order to investigate the propriety of the RPS, one of the purpose of this study, was to examine the 24 items classified by the IFS. 2) Evaluation of the complexity of surgery. The data used in this study was collected The data used in this study was collected from 94 specialists in general surgery by mail survey from November I to 15, 1986. Several independent variables (age, location, number of bed, university hospital, whether the medical institution adopt residents or not) were also investigated for analysis of the characteristics of surgical complexity. 3) Complexity and time calculations. Time data was collected from the records of the Seoul National University' Hospital, and the cost per operation was calculated through cost finding methods. 4) Analysis of the propriety of the Relative Price System of the Insurance Fee Schedule. The Relative Price System of the sample operation was regressed on the cost, time, comlexity relative ,value system (RVS) separately. The coefficient of determination indicates the degree of variation in the RPS of the Insurance Fee Schedule explained by the cost, time, complexity RVS separately. 2. The appropriateness of the classification of the Insurance Fee Schedule. 1) Choice of sample operations. The items which differed between the classification of the specialist and the classification of medical, Insurance Fee Schedule were chosen. 2) Comparisons of cost, time and complexity between the items were done to evaluate which classification was more appropriate. The findings of the study can be summarized as follows: 1. The coefficient of determination of the regression of the RPS on-cost RVS was 0.58, on time RVS was 0.65, and on complexity RVS was 0.72. This means that the RPS of Insurance Fee Schedule is improper with respect to the cost, time, complexity separately. Thus this indicates that RPS must be re-shaped according to the standard element. In this study, the correlation coefficients of cost, time, complexity Relative Value System were very high, and this suggests that RPS could be reshaped I according to anyone standard element. Considering of measurement, time was thought to be the most I appropriate. 2. The classifications of specialist and of the Insurance Fee Schedule were compared with respect to cost, time, and complexity separately. For complexity, ANOVA was done and the others were compared to the different values of different classifications. The result was that the classification of specialist was more reasonable and that the classification of Insurance Fee Schedule grouped inappropriately several into one price unit.

  • PDF

A Basic Study for Accumulation of IFC-based Schedule Information (IFC 기반의 공정정보 축적을 위한 기초연구)

  • Song, Jong-Kwan;Choi, Won-Sik;Won, Ji-Sun;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5890-5896
    • /
    • 2013
  • This Study aimed at suggesting the plan for accumulating and utilizing schedule information of IFC file in BIM-based delivery system. For this Propose, First, literature review is conducted for analyzing utilization plan of schedule information and the IFC standard. Second, Schedule Planning process is analyzed to draw Schedule elements, and schedule information items is derived by analyzing schedule process and commercial software. Also, schedule elements in the IFC schema is derived by analyzing IFC schema through drawn schedule information. Finally, this study suggests a concept model accumulating and utilizing Schedule information included in IFC schema, and a conceptual delivery process of BIM model by analyzing BIM Application Guideline for Facility Project by PPS (Public Procurement Service) for accumulating IFC delivery files This study will expects to contribute to accumulate information of BIM model at the point of nationally introducing BIM.