• Title/Summary/Keyword: Standard plan

Search Result 1,550, Processing Time 0.033 seconds

Metro Telecommunication Basis Facilities Standardization and Functional Improvement Research (도시철도 구내정보통신 기반설비 표준화 및 기능 향상방안)

  • Kim Moon-Tae;Yoon In-Young
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.964-968
    • /
    • 2005
  • The standardization of information communication is doing a Internal each other connection and each other characteristic stability operation security in objective. From the low-speed network of the subway operation beginning currently it changes with the superhigh speed digital information transmission communication service environment which is a quality service, the hazard which plans the quality improvement of the efficient communication service use which hits to here and passenger service the standardization of the technical standard which stands and the improvement which hits to an engineering standard and facility must come to accomplish. The facility which existing is been old or the enclosure communication equipments which are insufficient. it improves, establishment itexpands efficiently, like this facilities it is stabilized and it is economic and rationally use maintenance it manages with the plan for the inside and outside of the country information communication relation technical standard and engineering standard service feature improvement and future expandability and economical efficiency, the possibility of having a pliability in order to be, rational technical standard and standard it takes a triangular position, efficient characteristic security of information communication service there is a place objective which promises the rational development of course city railroad communication system with character. Function improvement of enclosure communication base equipment, against an improvement and standardization plan it described trom the prosecution which it sees.

  • PDF

A Study on the Development of Evaluation Criteria in the Business Continuity Management System(Focusing on the 'Understanding the organization' in Plan of the ISO 22301) (업무연속성관리체계(BCMS) 평가지표 개발에 관한 연구(ISO 22301 Plan의 '조직의 이해'를 중심으로))

  • YoungKyun Jung;ChongSoo Cheung
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.2
    • /
    • pp.363-371
    • /
    • 2023
  • Purpose: This paper aims to develop evaluation criteria of Plan- 'Understanding the Organization' in the PDCA(Plan-Do-Check-Act) requirements of ISO 22301 which is a global standard in the area of BCMS(Business Continuity Management System). Method: The group of 20 experts in the BCMS checked for the validity of the evaluation criteria of Plan- 'Understanding the Organization' by the modified Delphi technique and relative importance are surveyed by the group. Results: As a result, the 12 evaluation criteria with relative importance that can be applied for BCMS evaluation of the organizations are developed and proposed. Conclusion: In order to introduce a quantitive evaluation in the BCMS, it was concluded that evaluation criteria need to be chosen and given relative importance, thus the criteria with the importance could be used for effective evaluation

The Experimental Study on Early Strength Properties of High Volume Fly-Ash Concrete (플라이애쉬를 다량 치환한 콘크리트의 초기강도성상에 관한 실험적 연구)

  • 이동하;김상미;강태경;백민수;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.281-286
    • /
    • 2002
  • To study of binder and fine aggregate a lot of replacement fly-ash concrete, initial characteristics, standard environment of curing temperature $20^{\circ}C$, hot-weather environment of curing temperature $35^{\circ}C$, . Flesh concrete tested slump. air contest and Hardening concrete valuated setting period of form, day of age 1, 3, 5. 7, 10, 28 compression strength in sealing curing. Purpose of study is consultation materials in field that variety of fly-ash replacement concrete mix proportion comparison and valuation. (1) Experiment result age 28day compression strength more higher plan concrete then standard environment in curing temperature $20^{\circ}C$, , most strength F43 is hot-weather environment in curing temperature $35^{\circ}C$, replacement binder 25%, fine aggregate 15%. (2) Hot-weather environment replacement a mount of fly-ash is a same of plan concrete setting period of form. Age 28day compression strength replacement a mount of fly-ash more hot-weather concrete then plan concrete.

  • PDF

A study on the Project Management Plan (PMP) Development Appropriate for Global Construction Environment (글로벌 건설 환경에 적합한 건설사업관리계획서(PMP)에 관한 연구)

  • Yang, Myung-duck;Kim, Chang-kwon;Yang, Jae-woong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.107-108
    • /
    • 2015
  • It's became essential that Korea construction companies should enter into the overseas construction market for their growth and sustainability. In order to comply with the client's required global standard and to compete with in the international market, the shifting the construction project management system to global level is required. In accordance with the demand, this paper proposes the top-level document of construction project management system as a to-be model that utilized in overseas construction projects. The project management plan ("PMP") suggested in this paper is not only the most appropriate one, which complies with the global standard, to be used when companies bid for international construction projects against foreign competitors but also has the process modeling and hierarchical structure.

  • PDF

Standard Manual for Preventing and Maintaining Leakage of Underground Structures in Apartment Houses - Part 1. Maintenance Plan and Inspection - (공동주택 지하 구조물의 누수 예방 및 유지보수를 위한 표준 매뉴얼 - Part 1. 유지관리 계획 및 점검 -)

  • Kim, Soo Yeon;Lee, Jung Hun;Lee, Sung Jin;Jang, Duk Bae;Oh, Sang Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.237-238
    • /
    • 2019
  • As part of the development of building technology to improve the living performance closely related with lifestyle to Realize the Housing Welfare, the standard manual for the prevention and maintenance of water leaks in the underground structures of apartment buildings consists of Part 1 and Part 2. This study further covered the maintenance plan and inspection carried out in Part 1.

  • PDF

GEO-KOMPSAT-2 LAE Burn Plan in Supersynchronous Transfer Orbit (정지궤도복합위성의 SSTO 액체원지점엔진 점화계획)

  • Park, Bong-Kyu;Choi, Jae-Dong
    • Aerospace Engineering and Technology
    • /
    • v.13 no.2
    • /
    • pp.122-130
    • /
    • 2014
  • GEO-KOMPSAT-2 which is under development by KARI to be launched in 2018 is expected to be injected into its orbit through the standard GTO(Geostationary Transfer Orbit) or SSTO(Supersynchronous Transfer Orbit). While the standard GTO mission has been applied for the most of the geostationary satellites, the SSTO mission is rare case and significantly different from the standard GTO mission in technical point of view. This paper lists the operational constraints to be applied for GEO-KOMPSAT-2 SSTO mission, and introduces a preliminary LAE burn plan for GEO-KOMPSAT-2 mission. In order to evaluate the developed plan, a simulation study has been performed considering ground station visibility.

A Study on the Status of Illumination Environment in Workplaces (업무공간의 조명 환경 실태 조사 연구)

  • Choi Han-Hee;Ha Mi-Kyoung
    • Korean Institute of Interior Design Journal
    • /
    • v.13 no.6
    • /
    • pp.167-174
    • /
    • 2004
  • The purpose of this study is to examinethe present illumination conditions in office environment and to suggest an efficient illumination plan in office planning process. Illumination conditions in work environment were surveyed in 6 offices to investigate whether the present illumination conditions were appropriate to the work type. The results of this study are as follows: Most of the general Illuminance level in the area of work were all at an adequate level, except one. The average Illuminance level in the all meeting rooms were met for the standard. Illuminance in the all reception area were extremely over the standard, The illuminations of this area were rather designed according to the image of the company than the standard. As for the illumination method in the area of general work, four offices used a general lighting by a direct lighting type, while two offices used a general lighting and a task lighting at the same time. This survey suggested that first, each company should consider illumination plan in the building planning process, second, illumination plan considering the type of places is needed, and third, illumination environment may be differentiated according to the work type. In conclusion, efficient illumination environment should be considered in office building planning process, especially In terms of illumination materials and methods.

Investigation Research for Apartment House Lighting Equipment Standard Establishment (공동주택조명 설비 기준 설정을 위한 조사 연구)

  • Kim, Dong-Kwan;Lee, Sun-Hyung;Lee, Kyung-Sup;Kim, Jang-Yuol;Chon, Yeon-Soo;Chung, Hun-Sang
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.562-564
    • /
    • 2001
  • Current interior lighting design way that is consisting uniformly by designer's experience or simple capacity calculation diversifies according to standard of living elevation and there is problem that do not reflect been individualising resident's change request in lighting plan, design properly. Therefore, because this resident's request, enough judgment data that is worth reflecting dissatisfaction item in design concretely or standard is not saved up in business post, had gotten into bottleneck at lighting design. Diagnose resident's consciousness and feedback degree about interior lighting to existent apartment complex in this research and examined improvement plan. As a result, in the case of illumination, wanted higher brightness and showed reason that is most Affirmativ about order way of lighting fixtures. The reason is because can select registration nine that want by oneself directly. Plan qualitative elevation of house lighting environment making lighting image which is coincided in our real condition, and is thought to reflect various resident's character, fondness in design and solved dissatis faction.

  • PDF

A Study on the Numbering Plan for National Information Infrastructure (초고속 통신망의 번호 체계에 관한 연구)

  • Hwang, Gunn;Kim, Yong-Jin;Choi, Jun-Kyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.2 no.3
    • /
    • pp.283-293
    • /
    • 1998
  • The numbering plan, basic requirements for interworking standards, and technical standard specification for National Information Infrastructure have not been defined specifically yet. It is reviewed for the numbering plans of public/private ATM networks based on the standard specifications of W-T and ATM Forum. The specifications for numbering plan are discussed for the interworking between current various networks and National Information Infrastructure based on the related standard specification of ITU-T and ATM Forum.

  • PDF

A Process Planning System for Machining of Dies for Auto-Body Production(II)-Operation Planning and NC Code Post-Processing (자동차 차체금형 가공용 공정계획 시스템(II)-작업 계획과 NC 코드 후처리)

  • Sin, Dong-Mok;Lee, Chang-Ho;Choi, Jae-Jin;Noh, Sang-Do;Lee, Ki-Woo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.18 no.1
    • /
    • pp.63-73
    • /
    • 2001
  • This paper presents a process and operation planning system with an NC code post-processor for effective machining of press dies for production of cars. Based on the machining features, major parts of press dies are categorized into 15 groups and a standard process plan is defined for each group. The standard process plan consists of a series of processes where a process is defined as a group of operations that can be done with one setup. Details such as cutting tools, cutting conditions, and tool paths are decided at the operation planning stage. At the final stage of process and operation planning, the NC code post-processor we developed adjusts feedrates along the tool path to reduce machining time. The adjustment rule is selected based on the metal removal rate estimated by virtually machining with virtual cutting tool.

  • PDF