• Title/Summary/Keyword: Standard Work type

Search Result 286, Processing Time 0.031 seconds

Development of Adoption Strategy and Guideline of Business Process Management Standards: Focusing on Business Process Execution Language (비즈니스 프로세스 관리 표준 도입 전략 및 지침 개발: 비즈니스 프로세스 실행 언어를 중심으로)

  • Kim, Dong-Soo
    • Journal of Information Technology Services
    • /
    • v.5 no.2
    • /
    • pp.107-123
    • /
    • 2006
  • The objectives of this study is to develop a strategy for the adoption of BPM(Business Process Management) standards and an implementation guideline of the BPM standard for BPM solution developers focusing on BPEL(Business Process Execution Language) which is regarded as the most important BPM standard. In the heterogeneous and distributed IT environments, every type of enterprise software requires standards to enhance interoperability. BPMS(Business Process Management System), which is a type of enterprise software requires BPM standards such as BPEL(Business Process Execution Language), BPMN(Business Process Modeling and Notation), BPQL(Business Process Query Language) and so on to achieve multi-system interoperability and component interoperability with their BPM solutions. It is quite helpful to provide the adoption strategy concerning BPM standards for each type of BPM solution vendors who need the BPM standards. Since the BPEL is conceived as the most important BPM standard and widely adopted by many BPM vendors, we have proposed a reference architecture for BPEL implementation and also developed the detail implementation guideline of core components of the BPM system supporting the BPEL standard. Using the strategy and implementation guideline proposed in this work, BPM solution vendors can establish their own standard adoption strategy and they can also develop their BPM solutions supporting the BPM standards more efficiently.

Design on Slopes Revegetation and Tentative Instruction on Construction Work (비탈면 녹화 설계 및 시공 잠정 지침)

  • Jeon, Gi-Seong;Kim, Nam-Choon;Lee, Tae-Ock
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.10 no.1
    • /
    • pp.100-113
    • /
    • 2007
  • In Korea, there has been no revegetation applicable standard for slopes formed by road construction work up to now, so revegetation work has been done using mostly foreign varieties in the manner of early revegetation. However, foreign varieties have some shortcomings; for example, they tend to be dried to death after construction work. Besides, due to the rift in the supporting soil, these revegetated varieties are often displaced from the slopes. Thus, the Ministry of Construction & Transportation on July, 2005 established revegetation standard on the slopes suited for the natural eco-system of Korea and organized positively recommending directions for using self-sewn plants growing near the slopes in overall consideration of soil, weather, regional conditions. The locations specified in this direction are the slopes at the road construction jobsite like the expressway, highways, and local roads. In addition, the Ministry's standard and directions stipulated that damaged slopes's natural environment and eco-system due to various road construction work should be restored, and thus a feeling of stability and pleasantness should be provided to road users as well. Also, the Ministry tried to select seed plants and revegetation measures suited for surrounding environment to put the environment-friendly slope revegetation measures into practice through the test revegetation work in order to prevent illegal construction practices and to improve the quality of revegetation. According to the direction, revegetation districts aimed at the slopes are divided into three ones in consideration of weather environment, regional environment, and forest environment as follows : national territory's core ecological green-land based district centering on the Taebaek Mountains; coastal ecosystem district including islands off the coast; inland eco-system district. The combination of revegetation plants according to environment revegetation districts, should be executed by dividing into herb-oriented type, woody plant colony type, and bio-species versatility restoration type, and the selection of seeding plants should be done in the presence of a supervisor and through test construction results and technology counseling from a specialist in natural eco-system restoration and revegetation measure seed combination standard according to environment revegetation districts. This direction will be executed in the manner of monitoring until the yea 2008 and 2009 it will be finalized and enforced on December, 2009.

Development of Standard Work Type to Utilize Drone at Expressway Construction Sites (고속도로 건설현장에서 드론 활용을 위한 표준공종 개발)

  • Lee, Suk Bae;Jeong, Min;Auh, Su Chang;Kim, Jong Jeon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.461-468
    • /
    • 2021
  • The role of drones is increasing day by day in smart construction that manages construction sites with 3D data in every life cycles. This is because both the digital surface model (DSM) and the orthoimage obtained for the construction site through the drone are made of point cloud data. This study aims to develop standard work types for drone use in order to systematically utilize drones in expressway construction sites. For the study, two expressway construction sites in Korea were set as test beds, and construction types applicable to drones were derived and verified through a pilot project. As a result of the study, three construction work types were developed for road planning, road design and maintenance, respectively, and in road construction, twenty-one detailed construction types were developed for five construction work types. It is expected that drones can be used more systematically not only at expressway construction sites, but also at other road construction sites by utilizing the "standard work type at expressway construction site for drone use" developed in this study.

A Theoretical Model for the Choice of Alternative Work Arrangements (비정형근로 유형의 선택에 대한 이론적 모형)

  • Rhee, Chong-Hoon
    • Journal of Labour Economics
    • /
    • v.29 no.1
    • /
    • pp.75-98
    • /
    • 2006
  • This study shows a theoretical model, based on transaction cost theory, for the choice of alternative work arrangement, Suppose that standard labor contract (permanent and full-time) is a typical labor contract of within-organization transaction and alternative labor contracts of variety are in the spectrum between market and within-organization transaction, the type and size of the market transaction cost for a specific labor would determine the appropriate labor contract. Firm-specificity and level of skill, scope and uncertainty of tasks, and duration of contract are the major determinants of transaction cost which, in turn, determines the type of labor contract. This theoretical model implies that there will be occupational segregation between standard and alternative work arrangements and that the legal regulations for protecting employment and wage of non-standard workers might not be so effective as expected.

  • PDF

A study on the Assessment of Standard Wages for Constructing Luminaries for Landscope Lighting (경관조명기구의 설치에 대한 기준노임 산정에 관한 연구)

  • Yoo, Dong-Gil;Lee, Bok-Hee;Lee, Sok-Yeon
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.169-172
    • /
    • 2008
  • Recently, landscape lighting is more and more installing in many places such as park, cultural heritages, large-scale structures, bridges, apartment, and so on. However, there is no the government-set official estimation for standard wages constructing luminaries for landscape lighting. The cost of construction is estimated based on the standard wages of related-similar installations such as internal lighting fixtures or the designer's subjective decision. Sometimes, it is overestimated or underestimated. In this paper, the fundamental process for estimating the standard wages constructing luminaries for landscape lighting is studied. The estimation method of standard wages constructing lighting fixtures was examined on the basis of the type and capacities of luminaries, installation places, type and shapes of installation auxiliary materials, worker's skill, and etc. As a result, some results obtained in this work were significantly, different with the standard wages for internal electric wiring published by Korea Electric Association. In the future, to improve the accuracy of the estimation of the standard wages for constructing luminaries for landscope lighting, detailed factors related to the installation condition and dimensions and types of luminaries should be considered.

  • PDF

A Study on the Working-Time Stratification in Korea (한국의 노동시간 계층화에 대한 연구)

  • Shin, Young Min;Hwang, Gyu Seong
    • 한국사회정책
    • /
    • v.23 no.3
    • /
    • pp.17-47
    • /
    • 2016
  • This paper aims to analysis working-time of Korea focusing on "the difference and the distribution" by a stratum. Classifying working-time into four categories including marginal part-time, part-time work, standard-time work and long-time working, it compares the relative distribution by income quintile. The outcome is as following : 20% of low-ranking income quintile are (marginal) part-time working, 60% from income quintile 2 to 4 are in long-time working and 20% of top-ranking income quintile are in the standard-time working in overall. Working-time classes can be divided up into three: short time-low income of type 1, long time-medium income of type 2 and standard time-high income of type 3. Analysing working time type, the low wage-short time, medium wage-long time and high wage-standard time by the wage per month and low wage-very long time, medium wage-long time and high wage-standard time by the wage per hours are confirmed. Also, stratification of working-time has been intensified in terms of age, jobs and work status. Policy implication from this study is that the increase of minimum wage to the lowest income class and creation of employment by the reduction of working-time to the medium income class could be effective policies.

An Experimental Study on the Application for High Pressure Spray by Heat Cycle Type Equipment to Improve Work Safety and Workability of Asphalt Water Proofing method. (아스팔트 방수공법의 시공성 및 작업안전성 개선을 위한 열순환 방식의 고압 분사장치 적용에 관한 실험적 연구)

  • Chung, Chang-Pyo;Song, Je-Young;Lee, Sun-Kyu;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.33-39
    • /
    • 2009
  • Asphalt waterproofing method has a long history over 80years since introduce to domestic market. This method has a good point as high water proofing not permeable to water by material performance of bitumen, In spite of high waterproofing, the application has become decreased. This asphalt method has some problem such as work safety, low workability by complicated work process, environmental problem in job site, it should be solve by complementary measures. 'Therefore, in this paper, suggest the principle of high pressure spray by heat cycle type equipment by analysis of exist problem and materials investigation. And. study and examine the spray type degeneration rubberized asphalt membrane materials to adopt job site. Moreover, suggest the evidence by inspection about waterproofing performance by Korean Industrial Standard through the performance test of the spray type degeneration rubberized asphalt membrane materials.

  • PDF

An Analysis of Working Hours by Type of Sprinkler Head Used at Indoor Gymnasiums

  • Ahn, Jae-Cheon;Kong, Ha-Sung
    • International journal of advanced smart convergence
    • /
    • v.10 no.4
    • /
    • pp.117-123
    • /
    • 2021
  • This study aims to analyze working hours of sprinkler heads when a fire occurs at an indoor gymnasium while sprinkler heads are installed in division of standard response type, special response type, and earlier response type. The fire scenario was designed under the assumption that the fire started from overheating of a heater in the indoor gymnasium has transferred on to a couch to spread. The analysis on the operation time of the standard response type sprinkler head, the special response type sprinkler head and the early response sprinkler head was conducted. The result showed that, in case of fire in a gymnasium, the time for opening of the heat sensor due to the heat from the fire varies by the type of the sprinkler head. When a special response type sprinkler is installed, it worked below the assessment standards. When an early response sprinkler head is installed, it worked appropriately according to assessment standards. Based on the results, we found that sprinkler heads will work properly when installed according to design relevant to laws and regulations. This means that there is a limit in installation of sprinkler heads based on the existing law-based design as for indoor gymnasiums. Again, we conclude that if sprinkler heads are installed based on design made through laws and regulations, more time will be needed for operation, making it highly likely to fail to stop a fire at an earlier point of time.

A Study on the Development of Integrated Information Work Environment for Improving Work Productivity (업무생산성 향상을 위한 종합정보업무환경 구축에 관한 연구)

  • Sung, Tae-Kyung;Cho, Chang-Hyun
    • Asia pacific journal of information systems
    • /
    • v.9 no.3
    • /
    • pp.127-142
    • /
    • 1999
  • There have been strong arguments that the best organizational type for the information society is a network organization which is intelligent and learning-oriented as well as has problem solving capacities rather than a traditional passive organization which strictly follows standard operating procedures. In this perspective, integrated information work environment emerges as attractive work environment for the 21st century. Integrated information work environment is defined as an integrated electronic environment that is available to and readily accessible be each employee and is structured to provide immediate, individualized on-line access to the full range of information, software, guidance, advice and assistance, data, images, tools, and assessment and monitoring systems to permit job performance with minimal support and intervention by others. Case study was performed to measure the productivity improvement by implementing integrated information work environment in life insurance company. The results show that there is a number of indications of strong work productivity improvements.

  • PDF

Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material (표준품셈 관부설 및 접합공사 품 개정 요인 분석)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF