• Title/Summary/Keyword: Standard Site Method

Search Result 497, Processing Time 0.031 seconds

Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit (철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구)

  • Hwang, Young-Ho;Shon, Jung-Chul;Baek, Jong-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF

On-site Performance Test and Simulation of a 10 RT Air Source Heat Pump

  • Baik, Young-Jin;Chang, Young-Soo;Kim, Young-Il
    • International Journal of Air-Conditioning and Refrigeration
    • /
    • v.12 no.2
    • /
    • pp.61-69
    • /
    • 2004
  • In this study, on-site performance test of an air source heat pump which has a rated capacity of 10 RT is carried out. Since indoor and outdoor air conditions can not be controlled to satisfy the standard test conditions, experiments are done with the inlet air conditions as they exist. To estimate the performance of the heat pump for other conditions, the heat pump is modeled with a small number of characteristic parameters. The values of the parameters are determined from the few measurements measured on-site during steady operation. A simulation program is developed to calculate cooling capacity and power consumption at any other arbitrary operating conditions. The simulation results are in good agreement with the experiment. This study provides a method of an on-site performance diagnosis of an air source heat pump.

Database establishment method for process scheduling by means of simulation (시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론)

  • Ko, Yong-Ho;Noh, Jae-Yun;Ngov, Kheang;Shin, Do-Hyoung;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

A Study on the Appraisal of Site - on focus I-Evaluation model- (비즈니스 사이트 평가에 관한 연구 - I-Evaluation 모형 중심으로-)

  • 양승권
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.3
    • /
    • pp.151-164
    • /
    • 2001
  • Currently, there are little evaluated model for each industry and systematic analysis for each item about current business web sites. And the approach way to improve it all depends on individual. This research is about two different points of view on I-Evaluation development as an approach method to provide analysis, evaluation, and guideline on business web sites. The one is about developing a working step and a site evaluation model that are necessary to improve the quality of site. The other is about a framework development to apply a feedback on site most rapidly and site optimization. The former is from the methodological point of view for I-Evaluation, and the latter is from the point of view for I-Evaluation Framework. In terms of methodology, developing site evaluation model and defining a working step belong to it. Site evaluation model means customizing each customers web site, using each evaluated scoring model which can be a standard for each industry to analyze a similar business web site. Defining a working step means defining input and output parameters for composed elements, working processes, and results analysis on an evaluated model. And also it includes building a working environments to automatic steps mentioned the above by clarifying them.

  • PDF

The Experimental Evaluation and Verification of a 300kW Small Engine Cogeneration System (300kW급 가스엔진 열병합발전시스템 성능평가 및 실증)

  • Choi, Jae-Joon;Park, Hwa-Choon
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.332-337
    • /
    • 2009
  • The importance of the evaluation and verification of small-size cogeneration system has been emphasized because there is no KS-code related to the small-size cogeneration system. The evaluation method of small-size engine cogeneration system, regarding Japanese standard JIS B-8122 and international standard organization, ISO-8528, was applied to the system. The evaluation methods, start-test, rapid-load-up and rapid-load-down, etc. were executed at the system, and reasonable results were acquired. The electrical and thermal efficiencies were executed and analyzed at various load conditions. The NOx emission at various load condition was also measured. Finally, the gas engine cogeneration system was installed to a site for actual usage and it was continually operated during more than 6 months as the site condition.

  • PDF

Productivity Analysis on the Standard Quantity-Per-Unit Costing Method and Work Crew Combination Method : Focused on Non-Vibration Mass Excavation Method (무진동굴착공법의 일위대가방식과 작업조방식의 생산성 비교 분석)

  • Lee, Dong Wook;Cho, Hong Jun;Lee, Keun Jo;Kim, Nam-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.457-468
    • /
    • 2011
  • Recently, the non-vibration mass excavation method is used on sewage pipes and road construction sites in Jeju. However, a construction cost estimation based on the unit quantity does not provide a proper unit price. In this study, a comparison of the productivity of the standard quantity-per-unit costing method and the one of the work crew combination method was made based on the site monitoring of the non-vibration mass excavation method that is used in construction sites near Jeju. For this, data of 35 sites were collected: a regression equation was derived from the 30 data, and verification was carried out through the remaining 5 data. The analysis concluded that a day's workload is $16.43m^3$. In addition, a combination of the equipment considering the site conditions and the amount of labor, which varies with the number of work crew was obtained in order to estimate the construction cost of the work crew combination method. The construction cost was calculated based on the one-day workload ($16.43m^3$) derived from the regression analysis. The cost then was analyzed and compared with the standard quantity-per-unit costing method.

Study on the region selection for the creation of the naturally favorable waterfront area (자연친화적 수변공간조성 지역선정을 위한 연구(농지조성 및 농어촌정비))

  • 김선주;양용석;안민우
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2000.10a
    • /
    • pp.96-101
    • /
    • 2000
  • Nowadays, everyone emphasis the important of environment. it is found that try to apply using the naturally favorable method when arrange irrigation and drainage channel. But we have no accurate standard of region selection yet. so it is make a many problem. The purpose of this study is the making of standard which is optimal region selection for the creation of the naturally favorable waterfront area. We surveyed data of twenty site in korea where are managed by the KARICO(Korea Agricultural Rural Infrastructure Corporation). We analysed the data using suitable three method(simple adding point method, subjectivity decision method, checklist method) for purpose of this study.

  • PDF

A Study of the Decision Making System in adopting Off-Site Construction Method in the Initial Stage Considering the Building Project Characteristics -Focused on Structure Work of Apartment Housing- (건축 프로젝트 특성을 고려한 초기 단계에서의 Off-Site Construction 공법 도입 여부 의사 결정 시스템 개발 - 공동주택 골조공사 중심으로 -)

  • Lee, Sungho;Cha, Heesung;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.89-97
    • /
    • 2022
  • Recently, various problems such as reduced productivity, insufficient inflow of skilled manpower, reduced quality, and concerns about increasing safety accidents have appeared in the domestic construction industry. Stakeholder of construction project are considering the Off-Site Construction (OSC) method rather than the conventional on-site construction as an alternative. Despite the importance of decision making in the early stage of the adoption of OSC, there is a lack of methodologies for rational decision making. In this study, a decision making system has been developed to derive the final construction cost score by deriving the project characteristics, selecting the construction difficulty index, and developing a cost model for each construction method alternatives to calculate the standard construction cost. Using this system, the OSC method can be effectively evaluated in terms of its feasibility in the early stage of construction

Assessment of Potential for Liquefaction in the Large Reclamation Site Using GIS (GIS를 이용한 대규모 매립지반의 액상화발생가능성 평가)

  • Kim, Hong-Taek;Yoo, Si-Dong;Park, Sa-Won;Lee, Hyung-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1512-1519
    • /
    • 2005
  • In this study, the potential for liquefaction in the Incheon international airport was calculated by appling the standard penetration test data and laboratory test data to the modified Seed & Idriss(2001) method. The analysis was performed on the non-plastic silty layer and silty sand layer which within the depth of 20m, below 20 of the standard penetration value(N), and the ground water level. Also, each set of data was mapped by using GIS(geographic information systems) and the factor of safety for the potential for liquefaction was obtained by overlapping those layers. As a result, it was found that there exist potential hazard zone for the liquefaction partially. So, the additional detailed assessments for those are thought to be necessary.

  • PDF

A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey (지하철골공사 공사비산정기준 마련을 위한 현장조사 연구)

  • Song, Taeseok;Han, Sangjun;An, Bangyul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF