A Proposal on the Pipe Schedule Sprinkler System of NFSC 103 (NFSC 103 스프링클러설비의 배관스케줄방식에 대한 제안)

  • Jeong, Keesin
    • Fire Science and Engineering
    • /
    • v.28 no.2
    • /
    • pp.40-47
    • /
    • 2014
  • Design by means of the pipe schedule sprinkler system of NFSC 103 results in insufficient pressure and flow rate about 50% sprinklers of operating area. In order to solve the lack of pressure and flow rate, This paper compare and analyzed NFSC 103, National Fire Safety Code of Sprinkler System, with NFPA 13, Standard for the Installation of Sprinkler Systems, and suggested an alternative proposal. Changing the flow rate of each sprinkler from existing 80 L/min to 120 L/min, All of the operating sprinklers are fulfilled the minimum demands on 80 L/min and 1 bar. It is easy for everyone to design of the pipe schedule sprinkler system and it is optimum method that all sprinklers in design area are satisfied with minimum criteria.

PRODUCTIVITY PREDICTION MODEL BASED ON PRODUCTIVION INFLUENCING FACTORS: FOCUSED ON FORMWORK OF RESIDENTIAL BUILDING

  • Byungki Kwon;Hyun-soo Lee;Moonseo Park;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.58-65
    • /
    • 2011
  • Construction Productivity is one of the most important elements in construction management. It is used in construction process scheduling and cost management, which are significant sector in construction management. It is important to make appropriate schedule and monitor how works are done within schedule. But construction project contains uncertainty and inexactitude, modifying construction schedule is being an issue to manage construction works well. Even though prediction and monitoring of productivity can be principal activity, it is hard to predict productivity with manager's experience and a standard of estimate. A large number of factors influencing productivity, such as drawing, construction method, weather, labor, material, equipment, etc. But current calculation of productivity depends on empirical probability, not consider difference of each influencing factor. In this research, the aim is to present a productivity predicting regression model of form work, which includes effectiveness of influences factors. 5 variables existed inside form work are selected by interview and site research based on literature review of existed various productivity influencing factors. The effectiveness and correlation of productivity influencing factors are analyzed by statistical approach, and it is used to make productivity regression model. The finding of this research will improves monitoring and controlling of project schedule in construction phase.

  • PDF

Research of Integrated System Design Process for Concurrency Design Activity (동시적 업무수행을 위한 통합된 시스템 설계 프로세스 연구)

  • Kim Jin-Hoon;Park Young-Won
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.3
    • /
    • pp.141-152
    • /
    • 2004
  • This study describes process and method to establish concurrent and/or sequential schedule planning for the system design process of the EIA632 standard. For this purpose, the study suggest Process and method that are context analysis of standard process, interface definition from activity decomposition, integration of related activities, and definition of concurrent and/or sequential work flow. The proposed process and method will contribute to minimize time loss that is emerged from activities iteration.

Optimal Period by Calculating and Appling Correction Factor based on Setting of Non-Working Days of Construction Projects (건설공사의 작업불능일 기준설정에 의한 보정계수 계산 및 적용을 통한 최적공기 산정)

  • Lee, Pil-Yoon;Lee, Seong-Won;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.669-676
    • /
    • 2018
  • Schedule management in construction work is an important step for determining the construction period. On the other hand, there is a difference between the planned schedule and execution schedule because the estimation and calculation of Non-Working days, in which possible at the design stage is not performed properly. This paper proposes a method for estimating the working days by analyzing characteristics of the major work type and estimating the Non-Working days reflecting the Chuseok and New Year Holidays, which is the closest method to the actual work in the schedule planning. By applying the correction factor of the existing method and the improved method for the same construction in the same site, improved method was reduced by 22 days (9.1%) based on the actual working days. The importance of schedule management was confirmed as an example by comparing the data before and after the application of the standard (plan). These results show that the schedule delays, which are caused by the inconsistency between actual working days calculation that had been practiced conventionally and the working days on the schedule table, can be prevented. In addition, it will help to establish a schedule plan that is closer to reality.

Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling (대형건설공사의 프로세스 및 데이터 모델링을 통한 건설프로젝트관리체계 구축에 관한 연구)

  • Choi Yoon-Ki;Lee Hyun-Soo;Hwang Young-Sam;Kim Young-Suk;Kim Woo-Young;Song Young-Woong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.153-161
    • /
    • 2004
  • The systematic material and labor management planning should be established on accomplished EVM data. The matrix method of integrated cost and schedule was used with common category concept according to the construction project control system. The construction project control system was suggested through analyzing process and data modeling based on integrated cost, schedule and material. Information of construction project can be developed the relationship between the field data and the integrated cost, schedule database. Process and data modelling is provide a standard data format which are related to the material, labor management based on integrated cost, schedule database.

Development of Standard Breakdown Structure of Temporary Construction Technique in Building Construction focused on Site Manager (현장 관리자 중심의 건축공사 가설기술 표준분류체계구축)

  • Kim, Min-Jeong;Park, Jun-Mo;Kim, Ok-Kyue;Choi, Byung-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.117-118
    • /
    • 2012
  • This study has been reorganizing a standard breakdown structure of temporary technique focused on construction site. For this, first of all we, the authors, reviewed features and present statuss of construction temporary technique, and could develop to the standard breakdown structure through studying a construction site and researching a delphi method. By using the standard breakdown structure obtained from this study, it is expected that the application of to information of construction business and plan to a schedule and a work.

  • PDF

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

Case Studies on Preparing a Business Plan for the Foundation of Food Service Business and Analysis of Investing Economy. (외식사업 신규창업을 위한 사업계획서 작성방법 사례와 투자경제성 분석에 관한 연구)

  • 홍기운
    • Culinary science and hospitality research
    • /
    • v.3
    • /
    • pp.385-421
    • /
    • 1997
  • This study was performed as placing stress on business plan preparation and investing economy analysis centered to cases upon presenting the premises of study for new foundation of food service business. The summarized results are as follows: 1. In the aspect of carrying out process of practical project, establishing the promotion strategy, the facility project program, the menu program, the facility and furniture program, organization & manning schedule, the business operation schedule, review of all laws & provisions and the allout promotion schedule in order were deployed. 2. Analysis of investing economy for review of profitability 1) In case of investment, excluding 600million for the real setate lease among the total investment of 1billion, it was required by 161, 235, 000 for interior project, 161, 110, 000 for facility & equipment, 19, 235, 000 for fittings, 27, 600, 000 for menu plate & uniform, 27, 600, 000 for furniture, 13, 800, 000 for sign article. 2) In case of loss & profit presumed the annual turnover is to be 1, 115, 856, 000 the contigent profit(before tax) is to be 148, 966, 000 which is 13.3% in comparson to the sales amount and the net profit(after tax) for this term s to be 104, 276, 000 which is 9.3% against the sales and the profitable ratio to the equity investment( 500 million) is 20.9% and it satisfies 20% of the premises of study. 3) In case of the payback period will be approximately two(2) years which indicated within three(3) years that is standard of new project evaluation term of ordinary enterprise. 4) In case of internal rate of return it will be 21.5% which is favorable profitability as taking into account of 15% that is standard of new project evaluation by ordinary enterprise based on general downtown money interest. That the investing value of Happy Day profitability is hinted as it is sufficient enough as the case under this study based upon such results and considered that securing supremacy is competitive power in case of commitment will be possible.

  • PDF

Approximate Estimating of Plant Construction Duration Using a Standard Schedule Model (초기 사업단계에서 표준공정모델을 이용한 가스 플랜트 공사의 개략적 공사기간 산정)

  • Moon, Sung-Woo;Park, Sang-Chun;Kwon, Ki-Nam
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.26-33
    • /
    • 2009
  • The required level of detail in scheduling depends on the stages in the construction life-cycle. The objective of this study is to provide a Standardized Schedule Model (SSM) with an aim to facilitate the estimating of construction duration in the planning stage. The SSM modularizes work items; establishes relations between preceding and succeeding activities; and calculates approximate construction duration. The estimated duration of the SSM was compared with the detailed duration from the commercial scheduling tool using actual work activities. The difference showed to be ranged between -3.1% and +15%, which demonstrates that the SSM can be feasibly applied to the approximate estimation of construction duration.

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.