The purpose of this study is to improve the calculation method of the software operation pricing proposed by the software business price calculation guide from 'input manpower method' to 'rate calculation method'. The software operation pricing of the input manpower method is not objectively calculated in the domestic IT outsourcing situation where the statistical data based on the activity based estimating is insufficient and it is decided by agreement between the owner and the client. In addition, there was no standard for adjusting the productivity according to the characteristics of the operation service. In order to improve this, an operational correction factor item that can affect the software operation productivity was selected based on foreign and domestic standards, and it was confirmed through the first questionnaire to IT operation managers. In order to determine the level of difficulty of the fixed operational correction factors, the operational correction factor using AHP technique was confirmed through a second questionnaire for pairwise comparison. The operational difficulty calculation table was developed with reference to COCOMO and ITIL standards. Finally, we propose a new pricing scheme that reflects the operating rate. Regression analysis was carried out by collecting the data of the domestic public institutions on the estimated cost and the actual cost calculated from the new rate method software operation pricing. The results of the regression analysis show that the estimated cost and the actual cost are related to each other. Mean magnitude of relative error(MMRE) and PRED[25] analysis were added for accuracy analysis. MMRE and PRED also showed satisfactory results, confirming the possibility of replacing the rate method software operation pricing.
KSCE Journal of Civil and Environmental Engineering Research
/
v.29
no.5D
/
pp.627-634
/
2009
The BTL (Build-Transfer-Lease) contract of construction project serves as a part for early establishment of industrial foundation for social overhead capital. However, project cost of BTL contract is focused on initial construction cost. Accordingly, operation cost is lowly evaluated because there is no standard criterion for estimating maintenance cost for the facility. The low operation cost can be a factor that reduces service quality of facility operation. This study suggests a resonable method for estimating cost and manpower in the operation phase by using the existing practical data for wastewater treatment plant by BTL contract. The results of the study can be used for evaluating rough operation cost and manpower of similar plant project by facility size.
Dental prosthetic restoration shows a big difference of cost per itemized unit depending on the size of dental labs, facility standard, manpower, and performance. Even the same dental labs have distinctive cost according to manufacturing performance, inflation, and the number of workers. However, in apite of such a change of circumstances, it appears to be quite stable in the relative cost per itemized unit unless the manufacturing trend of particular item changes dramatically. Therefore, if the relative number of cost per itemized unit, which is produced by costing, is indicated, we are able to utilize it effectively as a standard wage estimate. If the wage of dental prosthetic restoration is determined on the basis of cost, it is desirable that the relative value of cost and that of wage are identical. But, by means of comparative analysis, since the relative value of wage reveals mostly lower than that of cost depending on an item, it is considered that the wage is not reflecting the cost approproately. Due to the subdivision and the profession of medical technology, the new development of wage items for dental prosthetic restoration is required. This means that the need for the establishment of new wage items should be presented as the general concept of dental prothetic restroation changes and the level of pathologic technology increases. The current wage structure has differences in the degree of difficulty accroding to unit items and in the cost factors. Nevertheless, the differences are not reflected enough to the wage, so there is potential to lower the medical quality through the use of low-proce materials to avoid the increase of cost and the work process which skips a manufacturing step. The new items of dental prosthetic restoration also increases, but the development of proper numerical value system is not supported. Thus, the right proce is set mostly by applying to the wage of a similar item. Since most wages are established by an individual agreement between the dental clinic institute and the dental labs, the propriety of wage level lacks. Therefore, it is urgent to provide and promote the system of a fair work charge by a standard cost which can be applied to all medical institute.
Kim, Song-Hwa;Kim, Jae-On;Son, Jae-Ho;Lee, Seung-Hyun
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.546-550
/
2008
Midium-size Companies have participated in most of the Educational Facility Construction. Since they are lack of special manpower, construction experience, and know-how, many construction defects cause. A water leakage is a typical construct defect in the educational facility construction. A water leakage prevention has to be careful considered in plan, construction and maintenance stages. Therefore, this study suggests Check List for the water leakage prevention, which designer/engineer must consider in plan, construction, and maintenance stages for the educational facility.
Journal of the Korean Institute of Traditional Landscape Architecture
/
v.29
no.3
/
pp.154-158
/
2011
This research was carried out to compare the standard of estimated unit power and material in landscape architecture construction between Korea and Japan. It has also been done to offer a practical and reasonable information to Korea landscape architecture industry. The research results are as follows. First, both Korea and Japan's standard of estimated unit power and material in landscape architecture construction are part of civil construction. Second, Korea's detailed type of construction is centered on plant's type and size while Japan's centered on architectural construction. Third, Korea's standard of estimated unit power and material are composed of workforce construction, mechanical construction and addition of soil. On the other hand, Japan's estimated unit power and material are composed of workforce construction, time of transportation, date of transportation. Fourth, the planting specification of Korea seems to be more in detail than that of Japan, Japan's showing a wider implication. Fifth, when comparing the information regarding standard of estimated unit power and material between Japan and Korea, transportation, independent stalking for plant, soil for landscape architecture is difference between the two countries. On the base of this research results, Korea's standard of estimated unit power and material in planning construction should be more elastic in its implication and independent standard of estimated unit power and material in landscape architecture construction. Also, examination of transportation, independent skating for plant and soil for landscape architecture should be done in order for better improvements.
Journal of the Korean Society of Fisheries and Ocean Technology
/
v.35
no.4
/
pp.343-352
/
1999
Because stow net being used in now is doing throwing net and hauling net through a ship's side, the work is very complicated and the fishing boat needs many seamen and it could cause a loss of lives and ship in stormy weather. We are now using small mesh size 36~500mm and it even catches young fish, so we call it the fishing gear of resource reduction type.Therefore we must make manpower reduction in automatic operation, safe operation of throwing net and hauling net in the stern and the stern-typed stow net of resource management using large mesh. And we performed three-typed model tests to examine the fishing gear. The obtained results are as follows;1. The fishing gear being used in the ship's side type stow net has inappropriate standard and arrangement of the net, resistance increase of the fishing gear and frequent breakdown of the net.2. To supplement the fault of A-typed stow net, we schemed fishing gear developed as both B-type(12-seamed net) and C-types(8-seamed net) of the stern-typed stow net. 3. In model tests, C-typed model net(mesh size 40~1,600mm) was proved good fishing gear because the resistance in accordance with the flowing speed was comparatively small and it's mouth area was broad. 4. A-typed stow net had the spreading device attached to side panel of the net, but the stern-typed stow net had the spreading device consisted of 4 lines far behind about 6m from side panel of the net mouth. In the flowing speed 2knot, the spreading condition of fishing gear was proved batter than the former.
Kim, Sung Soo;Yoo, Tae Gyeong;Yoo, Jin Yeol;Lee, Tae Sik
Journal of Korean Society of Disaster and Security
/
v.9
no.2
/
pp.43-52
/
2016
Notwithstanding industrial accident decrease generally, Construction industry is on the rise recently. Most accident occurs in the small scale like as multiflex housing, remodeling, neighbourhood facility more than safety supervisor appointed large scale construction site. By the size of business place, 81.6% of total accident occurs mostly in small scale site that is bellow 120 billion won and 50 manpower. This paper aimed that small scale housing company achieve a zero hazard practising and understanding the safety adminstration standar d model easily and it applied firstly after investigating the operation condition of construction site safety control in small scale company propelling the complex style multiflex housing business.
For front, aspect of terror may have to prepare indeed even chemical terror or rocket and small size missile and radioactivity terror because is predicted to become various. Furthermore, when see motion of every countries about nuclear engineerses' bringing round and illicit sale of plutonium, our country may have to prepare in terrorism which is expected thus. So that can finish international event successfully because the United States of America supports great manpower and budget since New York's World Trade Center terror and when see that is considering terror prevention countermeasure, we operate temporarily bursting tube state complete charge team such as terror by each field specialist such as a concern interested including special CBR complete charge moving team among 2002 World Cups soccer game period ahead of international event, must consider safety countermeasure. Specially, biology weapon of chemical weapon and cholera etc. 13 kinds of 5000ton that North Korea plans CBR terror society confusion that North Korea that to terror support nation as well as nuclear weapons development suspicion is defending South Korea communization strategy as real condition that is amplified as well as is saving production brand gets imprinted uses CBR terror at normal times, when see that is planing powerlessness communization unity using CBR weapon at time of war, must operate until bias 2002 World Cups international event finishes cooperation safety countermeasure utensil safely under closer talk between the South Korea ${\cdot}$ Japan ${\cdot}$ North Korea. As for us which must serve 2002 World Cup successfully to accomplish perfectly preparedness of CBR terror firstly, all inhabitants knows well CBR protection trick, and secondly, CBR existing formation that solidify realignment CBR complete charge moving team which of course is consisted of CBR specialist compose and keeping immediate going out attitude operating, by third, that expand CBR individual protection equipment and CBR evacuation equipment and establish individual and group protection attitude naturally, supplement as there is main room that actualize CBR pollution patient's slogan countermeasure by fourth, and develop standard model for CBR terror provision by fifthBecause constructing infra of CBR safety establishing CBR preparedness that utilize it, must minimize damage and contribute inhabitants' life and property protection.
Purpose: This study was designed to provide necessary institutional improvements for job security for foreign workers in the domestic construction sector. Method: I analyzed the National Statistical Office and related reports to investigate the status of foreign workers. Based on this, the government came up with measures to improve the system. Results: Based on the current comparative advantage index (RCA) analysis, the technology standard of foreign workers compared to Korean workers was evaluated, and the results were analyzed in order of moldwork, rebar, concrete work, stone work, and waterproof work. Conclusion: A foreign worker's work system was introduced to solve the problem of local Lunar New Year's Day field manpower. To ensure stable implementation of the system, there is a need to improve the operation of the employment permit system at construction sites and limit the size of the construction industry that introduces the employment permit system.
With the low birth rate and the inner city decline, the number of small schools is expected to increase. In this trend, the Ministry of Education has consistently used the number of students as a standard for the merger and abolition of schools since 1982, but it seems that has generated a vicious circle of education in rural areas and also it did not reflect realistic requirements and changes in the times although it is efficiency of local education finances. With the number of students constantly decreasing, it has a high probability to make villages without schools in urban areas if decisions are made by the number of students. In this sense, it is suggested that regional contexts and socioeconomic environment should be taken into account rather than to conduct the merger and abolition of small schools with economic logic. It is necessary to change the direction of improving the quality of education through the operation of small schools for coexistence of schools and villages and a cultivating the manpower needed in the 21st century knowledge information society and the 4th industrial revolution era. Therefore, we tried to find tasks for expanding small schools of the local community and developing small schools suitable for future social change.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.