• Title/Summary/Keyword: Standard Manpower Size

Search Result 27, Processing Time 0.029 seconds

A Studies of Amendment a Standard of Estimated Unit Manpower and Material of Landscape Architectural Construction Work Classification (조경공사 표준품셈 공종 개정에 관한 연구)

  • Yun, Ju-Cheul;Lee, Kwan-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.5
    • /
    • pp.119-126
    • /
    • 2011
  • The standard unit manpower and material in landscape architectural construction was consist of a standard and universal work classification. However, these constructional methods have created a number of problems in utilizing and responding on a variety of recently-developed working methods such as new constructional skills and technologies. This research decided that presenting the amendments of work classification of a standard unit manpower and material in landscape architectural construction was very important, and investigated those work classifications which required these new amendments. First of all, assessment items were selected through the literature reviews and a preliminary survey. Then, these assessment items were surveyed to the total of 60 professional landscape architecture field. The results of this study were as follows; First, the utilization level of the a standard unit manpower and material in landscape architectural construction was highest in the area of work classification of planting unit manpower and material. Second, the work classifications that needed to be added were recognized as leveling the ground construction, landscape structure construction, paving construction, water facilities construction, and outdoor facilities construction. Third, in the field of the a standard unit manpower and material in landscape architectural construction, 66.7% of the respondents replied that some amendments were necessary, and those amendments needed work classifications were identified as work classification of planting unit manpower and material was gigantic plant, topiary tree, temporary planting, exchange dead tree, etc. In the area of digging out was gigantic plant and plastic tree were recognized. The survey respondents also answered that, in keeping and management work classifications some amendments in pruning waste were necessary, and in the fields of rubble masonry work classifications some improvements were required in rubble aperture planting unit manpower and material and sodding and herbaceous sowing was a realistic lawn size unit manpower and material was needed. Based on the results explained above, this study suggests that amendments for a standard unit manpower and material in landscape architectural construction are necessary, especially in the areas of planting size and quality of work classifications unit manpower and material and in the unit manpower and material that affects the quality of lands caping constructions.

Development of Standard Estimates for Garden Construction: Focused on Planting

  • Hong, Kwang-Pyo;Lee, Hyukjae
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.5
    • /
    • pp.467-480
    • /
    • 2019
  • Standard estimates are the numerical data of a unit quantity required for construction work such as the amount of materials, manpower, and the use of equipment required and are also a basis to calculate construction costs. Unfortunately, standard estimates for construction have also been used for garden construction these days as no standard estimates for garden construction have been developed or documented until now. As a result, many problems have arisen at garden construction sites since landscape construction and garden construction differ in terms of scope, size, design and construction methods. The purpose of this study was to develop standard estimates for garden construction for proper calculation of the cost of garden construction and to ensure gardens are created following appropriate construction processes. In order to develop standard estimates for garden construction, a preliminary survey was conducted on experts to understand current issues at first. After that, a questionnaire survey was done to examine problems of construction processes and ways of improvement, and on-site inspections were conducted utilizing CCTVs at construction sites to identify the actual amount of manpower required on site. Based on the results of the surveys and on-site inspections, a draft version of standard estimates for 5 types of planting work for garden construction was developed. Developing standard estimates for garden construction will serve as a stepping stone for the transparent and proper compensation for garden construction work, which will not only contribute to addressing issues between consumers and construction companies, but also to the stabilization of market economy and job creation.

An Empirical Study on Contract Model for IT Outsourcing Application Operation (IT 아웃소싱 어플리케이션 운영 계약모델에 대한 실증적 연구)

  • Kim, Heungshik;Park, Soah
    • Journal of Information Technology Services
    • /
    • v.16 no.2
    • /
    • pp.45-60
    • /
    • 2017
  • The study suggests a contract model of application operation through case study of A bank's IT outsourcing application contract based on workload. The IT outsourcing order form has a problem in that the scope of work is ambiguous due to the integration of operation and maintenance. In this study, application operation and maintenance were separated by referring to application operation history provided in ISO/IEC15504-5 standard. The scope of the IT outsourcing service was clarified by organizing the definition and detail activities of the application operation business. Application operation contract method has generally applied estimation method by the number of input manpower and period by agreement between buyer and client. As there is no activity to calculate the number of input manpower based on the operational work history and based on the standard workload per activity. In this case is not guaranteed due to the simple agreement between the contractors. In this paper, we propose an application operating cost estimation model that measures the size of the operating software using function point analysis that is the basis of application operation tasks. In order to verify the validity of the application operation cost model, we verified the correlation between the application size and the labor cost through regression analysis using SPSS.

A Study on the Amelioration of the Standard of estimated Unit Manpower & Material' in the Landscape Planting Work (造景植栽工事 標準품셈의 改善方案에 關한 硏究)

  • Sohn, Chang-Ku;Kim, Kwi-Gon;Yoon, Keun-Young;Kang, Tae-Ho;Kim, Ik-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.18 no.3 s.39
    • /
    • pp.23-37
    • /
    • 1990
  • The purpose of this study was to suggest, an ameliorated, 'standard of estimated unit manpower & material' in the Landscape Planting Work. To achieve this goal of this study, following process was performed to reach more advanced results. First, relevant domestic & foreign references were gathered & analyzed with a viewpoint of the system & contents within, Second, most similar foreign country‘s relevant 10 forms & actual site were surveyed, Third, actual site data were collected from the 17 selected landscape Planting sites Fourth, the collected data from reference study & actual site survey were analyzed and calculated. And Finally, analyzed data were reorganized & rearranged in good order with 3 principles to produce more ameliorated 'Standard of estimated unit manpower & material' in the landscape Planting Work. The suggested main results of this study include, 1. Reorganization of current system to transplanting(includes excavation & root ball wrapping), planting(includes tree & shrub), turfing & maintenance 2. Deletion of the Range of 'account of labor' & simultaneous distribution of 'account of labor' with a proposed regular ratio 3. Adjustment of the range of the plant's size 4. Amelioration of the level of 'Account of labor' 5. New establishment in maintenance items as Watering, Fertilizing & spraying chemicals on turf area. 6. Readjustment & new establishment of the backfill volume. 7. Actualization, readjustment & new establishment of the transportation amount.

  • PDF

A Study on the Production of Wood Members and the Estimation of Raw Woods at the Government Managed Building Construction in the Late Chosun Dynasty (조선후기(朝鮮後期) 관영건축공사(官營建築工事)의 목부재(木部材) 생산(生産)과 물양산정(物量算定)에 관한 연구)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.10 no.1 s.25
    • /
    • pp.25-40
    • /
    • 2001
  • Since the 17th century, the society of Chosun Dynasty belonged to a period of rapid transition in many fields. As the building is a result produced on the basis of a society and economy, the general transition in a society is to be reflected into a process of building construction. Therefore an understanding or estimate of a building can be guaranteed by research of a process of building construction. Economic base factors in its process consist of material, cost, manpower, and operation system, etc. to be committed to the construction. On the premise, this paper is to examine the production of wood members and the calculation of the amount of raw woods in a process of woodwork in the construction of the government managed buildings in the late of Chosun dynasty. Construction reports, job slips, written estimates, and other documents in those days are examined for the study. To classify raw woods according to a standard size was aimed to a material management appropriately to apply each them to building size or its member size. The way to select a list of raw woods applicable to each member size, and to calculate the amount of the demanded wood was much more improved with 'Injungjeon-yeongkweon' in the year 1805 at the turning point than 'Hwaseong-seongyuk' in the year 1796. The improvement of material management brought to overcome a shortage of the amount supplied from forest preserve, and to a rationalization of building construction.

  • PDF

A Study on the Architectural Design Guideline for Intensive Care Unit - Focused on Cases of The US, The UK and Australia (중환자부 시설기준 수립을 위한 가이드라인 조사·분석연구 - 미국, 영국, 호주 사례를 중심으로)

  • Yun, Woo Young;Chai, Choul Gyun
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.21 no.4
    • /
    • pp.17-25
    • /
    • 2015
  • Purpose: At the moment, There is a facility standard for intensive care units on the Korea medical services Act. However, the contents of regulation are so limited and difficult to apply. Therefore, it is necessary to draw up the guideline to complement the regulation for efficient operation of intensive care units. This study aims to suggest basic data for guideline of intensive care units. Methods: 2 Methods have been used in this paper. 1) Comparative analysis between the national regulation of Korea with the design standard of the United States America, the United Kingdom and Australia. 2) A literature survey about operation method for intensive care unit, focused on materials published in intensive care medicine society of each country. Results: In comparison with guideline of abroad cases, additional supplement are required, with regard to item such as operation environment, size, nursing manpower ratio, bed space area, space program of intensive care units for healing environment. Implications: This study is a basic research for guideline of intensive care unit, and need to be followed by further study using various perspectives and methods.

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

A Study on the Appropriate Manpower Estimation according to the Evaluation of the Blood Collection Workload of Medical Technologists (임상병리사의 채혈 업무량 평가에 따른 적정 인력 산정에 관한 연구)

  • Choi, Se Mook;Yang, Byoung Seon;Kim, Yoon Sik;Lim, Yong;Oh, Yeon Suk;Bae, Do Hee;Choi, Byong Ho
    • Korean Journal of Clinical Laboratory Science
    • /
    • v.51 no.4
    • /
    • pp.495-503
    • /
    • 2019
  • This study explored the method of determining the appropriate size of the workforce according to the assessment of the workload of medical technologists (also called medical and clinical laboratory technologists, and medical and clinical laboratory scientists) in order to present a standard production model for the appropriate manpower in blood collection rooms. The eleven university hospitals selected for this study had between 600 and 2,000 beds. The 14-steps standard blood collection time was 4 minutes and 8 seconds for the outpatients aged between 20 to 60 years old (57%) except for children and the elderly (43%). Assuming that there were 8 hours per day for mechanically collecting blood, the maximum number of blood donations by one clinical laboratory scientist was analyzed to be 100 cases. In conclusion, it is appropriate to have fewer than 100 cases of daily blood collection by a medical technologist engaged in blood collection. Since the proper number of blood collection workers (100% of blood collection work)=the number of annual working days/(one day's work hours/time per case)×the number of working days per year, then the proper number of blood collection workers (one day's work hours)=the number of working days per year/100×the number of working days).

A Case Study of Chair at Railroad Vehicle (철도차량의 의자에 관한 비교연구)

  • Lee, Sae Hwan
    • Journal of the Korea Furniture Society
    • /
    • v.23 no.4
    • /
    • pp.467-478
    • /
    • 2012
  • Interurban railway is expanded by transportation that population can be centralism and cope efficiently in traffic jam by augmentation of vehicles in the city. Railroad chair departs in space of an existent simple rest and products that can raise human body standard and size by powerful engineering vicinity, quality of the material, psychological satisfaction etc. of users are developed steadily. Specially, study of space that can use various materials efficiently with bodily size government official because various of man and woman old and the young etc.. are using in occasion of the train is urgently required. Specially, railroad chair is a product that material and standard, structure, human body engineering, a finish etc. is studied variously. In the case of advanced nation, in case of design a chair operating time of railroad, is placed as all standards orderly and harmonious because is considered exercise dynamics etc.. and designs. The other side, in the case of our country, study expert of chair is short real and is depending on technological data of overseas railway vehicle. Chair for railroad must consider removal of short-range, long distance. That have to be consider to a lot of uncomfortable such as psychological satisfaction of user because the domestic Motor Companies are defining in fair development study and many researchers but the railroad chair company are not accumulated professional manpower and technological know-how. Railway vehicle can recognize that overseas visitors as well as native is important element as space that space is exposed internationally by product that Public personality which used cultural value is strong. Therefore, wish to plan valid spec relationship presentation of various design and specification, function etc.. and contribute to railroad chair development design process lists and analyzes van instances of railway vehicle chair of inside and outside of the country through this study.

  • PDF