• Title/Summary/Keyword: Standard Cost

Search Result 2,259, Processing Time 0.038 seconds

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

TDABC Application Case Study of Compounding Company: TDABC Application and Improvement of Profitability of Company K (컴파운딩 업체의 TDABC 적용사례 연구: K사 TDABC 적용 및 수익성 개선)

  • Dae-Young Lyu;Sung-Wook Yi
    • Asia-Pacific Journal of Business
    • /
    • v.14 no.2
    • /
    • pp.101-118
    • /
    • 2023
  • Purpose - The purpose of this study is to find out how a company can do reasonable cost calculations in a simple way and establish profitability improvement strategies based on the results. Design/methodology/approach - In this study, a case that compounding company K applied TDABC was studied. A case study was conducted on the process of company K reviewing and applying TDABC and the process of implementing the cost calculation for each product by applying TDABC, and establishing a profitability improvement strategy for each product based on the results. Findings - Company K rearranged the production standard information of the compounding industry such as productivity and batch size of each product to apply TDABC. Cost calculation was performed for each product according to the revised production standard information. After the cost calculation for each product was carried out, Company K established a strategy to improve profitability of each product. The profitability improvement strategy was implemented in two ways: a cost reduction strategy and a product price increase strategy. As a result of the final strategy execution, the profitability of each product was improved. Research implications or Originality - This study found a reasonable costing standard in consideration of the specificity of the research target company, and applied it to cost calculation cost for each product. It contains the process of establishing production and sales strategies for each product based on the cost calculation results. It is expected that this case study will serve as a good reference material for establishing cost calculation and profitability improvement strategies in similar businesses.

Constructability and Cost Analysis of the Clip-Type Binding Implement Substituting 135° End-Hooked Transverse Reinforcement in Reinforced Concrete Columns (철근콘크리트 기둥의 띠철근에서 135° 갈고리 대체 클립형 연결장치의 시공성 및 비용 분석)

  • Park, Koung-Yeun;Yun, Hyun-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.5
    • /
    • pp.459-469
    • /
    • 2020
  • The purpose of this study is to secure the same or more structural performance and constructability for the detail off hooks cross-constructed at 135° used as external-ties standard detail in reinforced concrete columns, therefore, to the purpose of improving constructability, The clip-type binding implement was suggested. the experiment on the constructability evaluation and cost analysis of the clip-type binding implement by 90° end-hooked transverse reinforcement in reinforced conrete columns was carried out. The results of the analysis confirmed that standard detail column took about an one hour regardless of the diameter of tie. When using the clip-type binding implement, It was reduced to about 50% of the standard detail column. and regardless of the building size, it was most effective for the cost down when using the clip-type binding implement 1ea, it was about 32% fo labor cost reduction effect in comparison with using standard detail. as a result, Using the clip-type binding implement is shown be very effective in the working time and construction cost reduction.

Development of the Estimation Software for a Petrochemical Plant (화공플랜트 견적 소프트웨어 개발에 관한 연구)

  • Min, Bong-Ki;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.8 no.1
    • /
    • pp.50-59
    • /
    • 2012
  • The current dual-watchdog estimation system has individually calculated the construction, the engineering and the procurement cost. The dual-watchdog estimation system is inefficient and prolonged estimation period because of the lack of the interoperability and the difference of material unit cost and construction unit cost. In order to resolve this problem, new estimation software was developed. The estimation software is developed by making up for the weak points in existing estimation method. The cost data with the same standard is the key point. And this software enhanced accuracy and speed of the data search in stylized estimation standard. A summary of the construction, the engineering and the procurement cost was generated in this estimation software. The unit rate about the labor cost, equipment and expense through a sheet was handled. The developed estimation software has five categories on engineering cost, procurement cost, construction cost and subcontractor management sheet. In this study, the estimation software to supplement the faults of the existing estimation method was developed. And estimation software on petrochemical projects increases an efficiency of the estimation work.

  • PDF

A Study on the Standard of Estimate for Vitalizing the Natural Environment Restoration Industry (자연환경복원산업 활성화를 위한 표준품셈 연구)

  • Jin, Ki Jung;Koo, Bonhak
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.2
    • /
    • pp.23-40
    • /
    • 2013
  • The natural environment restoration industry has been newly included in the environment area of engineering technology. Accordingly, the enactment of a standard of estimate for determining the 'Cost plus Fixed Fee' method has become necessary for the implementation and vitalization of natural environment restoration projects. The purpose of this study is to determine the standards for which the prices for engineering projects are calculated with respect to the enactment of an engineering project standard of estimate in the natural environment restoration field. These include the scope of the technological work, standard area, manpower requirements by technical grade that are necessary for carrying out the technological tasks. Relevant laws and regulations, systems and precedent case studies were investigated and analyzed to establish a price calculation standard. The overall results of the analysis were used and applied to questionnaires, public hearings, and expert delphi techniques. The study showed the following results: The scope of the technological work was categorized into 'Biotopes', 'Eco-corridors' and 'Ecological restoration'. The standard area was set up as $1,000m^2$ for 'Biotopes' and $5,000m^2$ for 'Eco-corridors' and 'Ecological restoration'. The manpower requirements by technical grade that are necessary for carrying out the technological tasks were determined. The suitability of the costs, standard area, manpower requirements by technical grade of ordered engineering projects that are determined by applying the standard of estimate for natural environment restoration that may be enacted pursuant to this study may be effectively investigated and analyzed. Moreover, further studies on the calculation of standard prices that can ensure the stability of natural environment restoration projects will be necessary.

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.

Benefit-Cost Analysis in Accordance with Replacement of Electrical Cooling System by Gas Cooling System using the California Standard Test (캘리포니아 표준테스트 방법을 사용한 전기냉방기기의 가스냉방기기 대체에 따른 편익비용분석)

  • Park, Rae-Jun;Song, Kyung-Bin;Won, Jong-Ryul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.12
    • /
    • pp.1774-1781
    • /
    • 2012
  • There are some efforts to improve the performance of electrical heat pump(EHP) and replace it with an alternative cooling equipment such as gas engine-driven heat pump(GHP), a gas cooling equipment, in order to solve the problem of summer electricity supply through reducing the summer electricity peak. This paper analyzes cost-benefit in accordance with replacement of electrical cooling system by gas cooling system using california standard test and sensitivity analysis of some scenarios.

Case Study on the Construction Standard Production Rate for Operation and Maintenance Technology (건설공사 유지보수품셈 사례조사 연구)

  • An, Bang-Yul;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.250-251
    • /
    • 2019
  • Lots of infrastructures have been newly constructed through the rapid economic growth of 1970's. Since the infrastructures has mostly deteriorated and this circumstance makes the need for maintenance and rehabilitation(M&R) of infrastructures to obtain the convenience and safety of users even more essential. Although markets for M&R project become larger, the construction standards for cost estimation of M&R work are insufficient. Thus, the purpose of this study is to examine the present state of standards for cost estimation of M&R works using case studies. Finally, this work could be utilized as the basis for the development of national standard for estimation of M&R work.

  • PDF

Cost-Effectiveness Analysis of Granisetron-Based versus Standard Antiemetic Regimens in Low-Emetogenic Chemotherapy: A Hospital-based Perspective from Malaysia

  • Keat, Chan Huan;Ghani, Norazila Abdul
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.14 no.12
    • /
    • pp.7701-7706
    • /
    • 2013
  • Background: In a prospective cohort study of antiemetic therapy conducted in Malaysia, a total of 94 patients received low emetogenic chemotherapy (LEC) with or without granisetron injections as the primary prophylaxis for chemotherapy-induced nausea and vomiting (CINV). This study is a retrospective cost analysis of two antiemetic regimens from the payer perspective. Materials and Methods: This cost evaluation refers to 2011, the year in which the observation was conducted. Direct costs incurred by hospitals including the drug acquisition, materials and time spent for clinical activities from prescribing to dispensing of home medications were evaluated (MYR 1=$0.32 USD). As reported to be significantly different between two regimens (96.1% vs 81.0%; p=0.017), the complete response rate of acute emesis which was defined as a patient successfully treated without any emesis episode within 24 hours after LEC was used as the main indicator for effectiveness. Results: Antiemetic drug acquisition cost per patient was 40.7 times higher for the granisetron-based regimen than for the standard regimen (MYR 64.3 vs 1.58). When both the costs for materials and clinical activities were included, the total cost per patient was 8.68 times higher for the granisetron-based regimen (MYR 73.5 vs 8.47). Considering the complete response rates, the mean cost per successfully treated patient in granisetron group was 7.31 times higher (MYR 76.5 vs 10.5). The incremental cost-effectiveness ratio (ICER) with granisetron-based regimen, relative to the standard regimen, was MYR 430.7. It was found to be most sensitive to the change of antiemetic effects of granisetron-based regimen. Conclusions: While providing a better efficacy in acute emesis control, the low incidence of acute emesis and high ICER makes use of granisetron as primary prophylaxis in LEC controversial.