• Title/Summary/Keyword: Standard Construction Process

Search Result 589, Processing Time 0.029 seconds

Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing (적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

A Study on the Environmental Improvement for the enacting Standard of Construction Estimate in Communication Field (통신부문 표준품셈 환경개선에 관한 연구)

  • Seol, Dong-Hwa;Lee, Kwang-Hee
    • Journal of The Institute of Information and Telecommunication Facilities Engineering
    • /
    • v.2 no.2
    • /
    • pp.5-13
    • /
    • 2003
  • This paper suggests an environmental improvement scheme for the enactment and revision process of the standard of construction estimation in communication field. The first subject is a simplification of process on the enactment and revision. It can be achieved by transfer the function to the professional board from the subordinate council. The second process is an adoption of tentative step on enactment and revision. And the last subject is creation of maintenance part. All the improvement shall be carried on in long term schedule and on the sufficient financial support from government.

  • PDF

Development of Standard Systems through Analysis of Business Process the Risk Factors for the Korean Construction Management Firms (국내 CM기업의 리스크 인자별 관리 업무 프로세스 분석을 통한 표준업무체계 개발)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.73-83
    • /
    • 2015
  • Construction management firms in Korea have mainly focused on the key management areas of time, cost, quality and safety management in line with a rapid change of construction industry recently. However, a risk management is considered comparatively less important found from our research on an investment by the firms for training, system establishment. This has been identified that the construction management firms have taken an approach of dealing with risks with their experience, insight rather than managing risks with a systemized principles or proper tools. Therefore, the current system for risk management was identified by analyzing risk factors and work process in this research and systemized process for risk management of the identified risk factors was suggested. This research is expected to be a basis on establishing standard gudiance for risk management and risk management tools.

A Study on the Construction and Improvement of Software Process Infrastructure for Software Firms In Korea (국내 소프트웨어 사업자의 프로세스 기반구조 구축 및 개선 방안 연구)

  • Ahn, Yeon-Shick;Moon, Song-Chul;Kim, Dong-Soo
    • Asia pacific journal of information systems
    • /
    • v.14 no.4
    • /
    • pp.23-47
    • /
    • 2004
  • This study was tried for the improvement of software process ability of the software firms, and analyzed empirically the impact that a software process infrastructure level influences on the software process level and process performance. The questionnaire were developed and data were collected from the process improvement correspondences or project quality managers of the 78 software firms. The result was shown that management-organization infrastructure was composed of software process improvement organization's role and activity, process standard and education, management system and supporting, management guides and procedures. And organization's standard development procedure or criteria, process asset, process support tools were included in technical infrastructure. This study provides that some components of software process infrastructure had an significant influence on the process level, process infrastructure management level, and software process performance.

A vision and strategy for developing virtual construction system (가상 건설 시스템 비전과 구축 방향)

  • Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Shin, Hyun-Mock;Lee, Kwang-Myong;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.62-67
    • /
    • 2007
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

Study for Architectural Standard Details Based On BIM Information Framework (BIM 표준프레임워크 기반의 건축 표준상세도면 구축방안)

  • Kwon, Soon-Ho;Lee, Woon-Jae;Jo, Chan Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.2
    • /
    • pp.93-103
    • /
    • 2013
  • In the situation where there should be a gap between the design environments of 2D drawing and 3D BIM modeling, it is unavoidable aspect to face confusion caused by parallel usage of both technologies unless the project delivery systems are entirely upgraded to 3D. Therefore, it is critical to make efforts to minimize this confusion. Meanwhile, detailed drawings have very important roles in the construction process because they do not only concretely express construction methods for a given design plan but also provide basis for quantity takeoff and construction cost estimation etc. This paper suggests a plan to standardize detailed information based on BIM standard framework in order to make BIM realize the information. In the short term, this plan provides improved environment where both BIM and CAD technologies can be applied and, in the long term, it provides bases for BIM to replace CAD technology.

Procedural Problems in Academic Writing Faced by International Students (외국인 대학생이 작성 중인 학술 보고서에 나타난 제(諸) 문제)

  • Kim, Jiyoung
    • Journal of Korean language education
    • /
    • v.28 no.1
    • /
    • pp.23-47
    • /
    • 2017
  • This research analyzed procedural problems presented in academic writing faced by international students. The result of this research will serve as a basis for suggesting methods of developing a curriculum in Korean writing as a liberal arts education designed for international students. To analyze problems presented in academic writing by international students, the standard of assessment was divided into interaction, knowledge construction, and material quotation. Then, knowledge construction was divided into contents, structure, and expression, and the items were subdivided in each category. These categories of assessment correspond to the genre of academic writing and are different from the existing standard of assessment for academic writing. Applying these standards, this research analyzed 43 texts of academic writing in process for a final paper by international students in an class and presented problems in them. Furthermore, this paper aims to give detailed feedback that can help solve those problems.

Literature Review of Construction Guide and Design Standard for Root Barrier Design of Green Roof System (인공지반녹화용 방근 설계 및 품질 향상을 위한 가이드라인 및 기준 고찰)

  • Suh, Jung-Il;Kim, Young-Sam;Shin, Hong-chol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.239-240
    • /
    • 2019
  • The existing evaluation of root barrier resistance takes at least two years as an evaluation based on plant growth, and it is difficult to determine early performance in the process of quality control in the field. In this study, thus, the direction of the root barrier resistance evaluation system was presented by considering the construction specifications and design standards for root barrier design. As a result, it was necessary to establish a test method for reproducing simple and consistent test results for evaluating the durability of root barrier materials.

  • PDF

A Study on the Production of Wood Members and the Estimation of Raw Woods at the Government Managed Building Construction in the Late Chosun Dynasty (조선후기(朝鮮後期) 관영건축공사(官營建築工事)의 목부재(木部材) 생산(生産)과 물양산정(物量算定)에 관한 연구)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.10 no.1 s.25
    • /
    • pp.25-40
    • /
    • 2001
  • Since the 17th century, the society of Chosun Dynasty belonged to a period of rapid transition in many fields. As the building is a result produced on the basis of a society and economy, the general transition in a society is to be reflected into a process of building construction. Therefore an understanding or estimate of a building can be guaranteed by research of a process of building construction. Economic base factors in its process consist of material, cost, manpower, and operation system, etc. to be committed to the construction. On the premise, this paper is to examine the production of wood members and the calculation of the amount of raw woods in a process of woodwork in the construction of the government managed buildings in the late of Chosun dynasty. Construction reports, job slips, written estimates, and other documents in those days are examined for the study. To classify raw woods according to a standard size was aimed to a material management appropriately to apply each them to building size or its member size. The way to select a list of raw woods applicable to each member size, and to calculate the amount of the demanded wood was much more improved with 'Injungjeon-yeongkweon' in the year 1805 at the turning point than 'Hwaseong-seongyuk' in the year 1796. The improvement of material management brought to overcome a shortage of the amount supplied from forest preserve, and to a rationalization of building construction.

  • PDF

TCE Exposure Assessment of Cleaning Workers (세척공정의 트리클로로에틸렌 TWA 및 STEL 평가 사례)

  • Hyun Soo Kim
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.1
    • /
    • pp.3-5
    • /
    • 2023
  • Objective: This study introduces exposure concentrations of time-weighted average standard (TWA) evaluation and short-time exposure standard (STEL) evaluation for trichloroethylene in the cleaning process. Methods: Trichloroethylene measurement was conducted according to the KOSHA Guide (A-24-2019) method. It was carried out twice. Results: As a result of the first measurement, TWA concentration exceeded 4 times the exposure standard and STEL concentration exceeded 16 times, but the inaccuracy and breakthrough of the collection time could not be considered, so the second measurement was conducted. The second measurement result was lower than the first measurement result, but exceeded the exposure standards (TWA, STEL). Conclusions: We were able to confirm that the exposure level of workers in the cleaning process using trichloroethylene exceeded the exposure standard. And it is also considered necessary to grasp the approximate concentration using a detector tube in the preliminary survey.