• Title/Summary/Keyword: Standard Construction Process

검색결과 592건 처리시간 0.029초

기술 표준 제정과 거버넌스 접근법: 전기공사 마스터 스펙 사례 (A Study of Technical Standard Making from Governance Perspective: The Case of Master Spec. in Electrical Construction)

  • 조현석
    • 전기학회논문지
    • /
    • 제61권5호
    • /
    • pp.770-776
    • /
    • 2012
  • For a few recent years, KECA(Korea Electrical Contractor Association) has promoted a project to establish an electrical construction specification called Master Spec. This paper analyses the characteristics of standards-making process of the Master Spec. as an umbrella technical standard in electrical construction industry in Korea. This paper argues that even if the Master Spec. is recognized to be technical standards, the standards-making process involves both technical and social practices when viewed from social construction theory and governance perspective. This aspect of social practices in technical standards making should be well understood because various stakeholders in terms of interests, resources, and motives try to influence the process positively and negatively. KECA in responsible for enactment of the Mater Spec. should be very thoughtful in building consensus first of all among electrical contractors, managing relationship with concerned government officials, and dealing with potential deviant groups as well as in pooling expertises and developing technical knowledge needed for designing technical specification.

The global standard realizing process of the Tire Production Facility and Process Line

  • Suzuki, Takeshi
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.28-29
    • /
    • 2015
  • The tire production facility is a large-scale construction with the complexity of a manufacturing process. The process utilities should be wide-ranging as an effective arrangement of them is highly important. All the necessary information should be clarified together with the manufacturer at the basic planning stage, and this design should be developed to comply with the local culture and regulations. It is important to carry out more advanced engineering in terms of process, cost and quality, even if it is difficult to standardize due to the cultural and geographical conditions and regulations. The key point is to reflect all the given conditions and make a clear design during the design stage, to eliminate the problems after the construction has begun. Another key point is the delivery system, which must be totally managed from the initial design stage until the construction stage by proven companies. Flexibility, quick action, and single responsibility will be the fundamental features in all the steps of the project.

  • PDF

의료시설 철근콘크리트공사에서 생산성과 실투입 노무량의 추이에 관한 분석 (Analysis of Trends in the Labor Productivity and Actual Amount of Labor Input in the Reinforced Concrete Construction of Health Facilities)

  • 정재웅;전상훈;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.103-104
    • /
    • 2015
  • Process management of reinforced concrete construction that many labor quantity and cost is put at a construction site is very important and gives a lot of influence on the subsequent process. Thus, there will be only used as a useful tool for process control by medical facilities and trend analysis of the flow of the process by the amount of labor input and productivity in reinforced concrete construction. productivity by type and quantity, and comparative analysis. In addition, it is necessary to calculate the standard of estimate and real commitment to labor productivity by type and quantity, and comparative analysis.

  • PDF

해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구 (A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel)

  • 배근우
    • 한국건설관리학회논문집
    • /
    • 제18권4호
    • /
    • pp.36-47
    • /
    • 2017
  • 대표적인 국내 해저터널 시공사례로 침매공법을 적용한 가덕 해저터널이 완공되어 운영 중이고, NATM 공법을 적용한 보령~태안간 해저터널이 건설중이다. 호남~제주 간 고속철도 해저터널이 구상중 이고, 일본, 중국과도 해저터널 건설에 대한 타당성이 검토되고 있다. 그러나 Shield TBM 공법을 적용한 해저터널에 대한 국내 시공사례가 없어, 현재의 기술력으로는 장대 해저터널 사업성 분석 및 적정 공사기간 예측 등 공사수행을 위한 공정계획정보 제공이 어렵다. 경제성 등 이유로 정부기관 및 발주기관도 Shield TBM 공법 적용에 소극적이고, Shield TBM 공법을 적용한 공정관리분야 기술적 자료도 부족한 실정이다. 따라서, 장대 해저터널 사업성 분석 및 적정 공사기간 예측하기 위한 표준공정관리체계가 필요하다. 본 연구를 통해 WBS, Network Diagram, 단위 공사기간 산출모델 등 해저터널 표준공정관리 체계를 제시하므로써, 장래 건설되어질 해저터널 사업에 기술적, 경제적으로 기여하고자 한다.

철근콘크리트 공사비산정기준 개정요인에 관한 연구 (A Study on the Factors for Revision of the Reinforced Concrete Construction Cost Estimation Standard)

  • 송태석;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.198-199
    • /
    • 2022
  • Reinforced concrete is the most widely used construction method for constructing structures. There is a lot of process for constructing Reinforced concrete structures such as installing rebars, molds and support, mixing and placing concrete, and curing. So the reinforced concrete work accounts for a large part of the total construction cost for constructing structure. For this reason a reasonable standard for estimating the cost of reinforced concrete construction has to be established and it will be possible to secure appropriate costs for construction work. In this study, we analyze the revision factors of the standard for estimating the cost of reinforced concrete construction and present them to secure reasonable construction costs.

  • PDF

글로벌 건설 환경에 적합한 건설사업관리계획서(PMP)에 관한 연구 (A study on the Project Management Plan (PMP) Development Appropriate for Global Construction Environment)

  • 양명덕;김창권;양재웅
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.107-108
    • /
    • 2015
  • It's became essential that Korea construction companies should enter into the overseas construction market for their growth and sustainability. In order to comply with the client's required global standard and to compete with in the international market, the shifting the construction project management system to global level is required. In accordance with the demand, this paper proposes the top-level document of construction project management system as a to-be model that utilized in overseas construction projects. The project management plan ("PMP") suggested in this paper is not only the most appropriate one, which complies with the global standard, to be used when companies bid for international construction projects against foreign competitors but also has the process modeling and hierarchical structure.

  • PDF

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

작업환경측정 결과 데이터베이스를 활용한 직무노출매트릭스 구축을 위한 공정 표준화 (Process Standardization for the Construction of Job-Exposure Matrix Using the Work Environment Measurement Database)

  • 최상준;박주현;고동희;박동욱;김환철;임대성;성예지;고경윤;임지선;서회경
    • 한국산업보건학회지
    • /
    • 제33권1호
    • /
    • pp.78-90
    • /
    • 2023
  • Objectives: The purpose of this study is to standardize the process code of the work environment measurement database (WEMD) for the construction of a job-exposure matrix (JEM). Methods: The standard process code (SPC) was reclassified based on process similarity and drawing upon the code used in the existing K2B. It was supplemented through review by industrial hygiene experts. In addition, an index word database related to SPC was created and used for SPC search. A pilot evaluation project was conducted by experts to evaluate the validity of the newly reclassified standard process code. Results: A total of 70 final SPCs were developed, including 31 processes related to the construction industry. Using the Shiny program, we developed a standard code finder that can be used on the web (https://kscf.shinyapps.io/scf_app/). As a result of the pilot evaluation, it was determined that it was easier to search for standard codes than previous codes, so it was highly utilized. Conclusions: It is expected that JEM construction using industry-process information drawing on WEMD data will be possible using the 70 newly standardized process codes.

KS(한국산업규격)의 3단계분류체계를 활용한 건자재 표준화 방안 연구 (A Study on the standardization of Construction material by the use of three-tier classification system of Korean Industrial Standard)

  • 임석호
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2009년 춘계학술발표대회 논문집
    • /
    • pp.236-239
    • /
    • 2009
  • Since 1990s, we have achieved a certain level of success in standardization of design, construction, and material on housing and public buildings with the national-level promotion. A practical connecting device that can synthesize all the serial processes is required to maximize the effect of construction material standardization. However, desired outcome of the standardization is not achieved yet because these serial standards and notification practices are decided by each part of the process and some are congested. In this study, we aim to improve a general organizational system of Korean Industrial Standard (KS) which is the most fundamental tool for the standardization of construction materials moving from a conventional idea that the standard is only for the material and components producers to a concept that can also be shared by the designers and construction workers. To achieve this, we propose an improvement plan for the Korean Industrial Standard in the perspective of three-tier classification system.

  • PDF

KS(한국산업 규격)의 3단계분류체계를 활용한 건자재 표준화 방안 연구 (A Study on the Standardization of Construction Material by the Use of Three-tier Classification System of Korean Industrial Standard)

  • 임석호
    • 한국주거학회논문집
    • /
    • 제20권3호
    • /
    • pp.59-67
    • /
    • 2009
  • Since 1990s, we have achieved a certain level of success in standardization of design, construction, and material on housing and public buildings with the national-level promotion. A practical connecting device that can synthesize all the serial processes is required to maximize the effect of construction material standardization. However, desired outcome of the standardization is not achieved yet because these serial standards and notification practices are decided by each part of the process and some are congested. In this study, we aim to improve a general organizational system of Korean Industrial Standard (KS) which is the most fundamental tool for the standardization of construction materials moving from a conventional idea that the standard is only for the material and components producers to a concept that can also be shared by the designers and construction workers. To achieve this, we propose an improvement plan for the Korean Industrial Standard in the perspective of three-tier classification system.