• Title/Summary/Keyword: Speed limit decision

Search Result 20, Processing Time 0.034 seconds

Development of the Speed Limit Model for Harbour and Waterway(II) - The Method of Speed Limit Decision and Application -

  • Kim, Deug-Bong;An, Kwang
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.3
    • /
    • pp.274-282
    • /
    • 2015
  • This research is the result on calculating the logical speed limit through certain process which some elements must be considered on selecting the speed limit of harbour and waterway. The suggested speed limit select model on this research is processed from 1~6 steps by forming a professional group of experts. Each step has its information which 1st step(water division), 2nd step(selecting the model vessel and vessel applied with speed limit.), 3rd step(selecting the maximum and minimum speed range on each section), 4th step(evaluation on the safeness of traffic), 5th step(suggesting the appropriate speed limit), 6th step(execution and evaluation.). The appropriate speed limit was decided on consideration of the safety of maritime traffic on the range of the maximum speed and the minimum speed. This model was used to derive the appropriate speed limit on the harbour water and Busan harbour entrance waterway. As the result, the harbour water was calculated to be 6.9 knots, the appropriate speed limit of Busan entrance harbour was 9.3 knots. The present calculation of the speed limit on the approaching channel area is 10 knots, inner harbour area is 7 knots, which are similar to the result of the speed limit. This research is the first research on selecting the speed limit model and has its limits on finding the perfect speed limit result. More detailed standards on the safeness of traffic evaluation must be found and additional study is necessary on discriminating consideration of the elements. This research has its value which it provides instances of aboard cases on guidelines of selecting the speed limit.

Decision Feedback Doppler Adaptive Band-Limit Algorithm for Maximum Doppler frequency Estimation (속도 추정 시 부가 잡음의 영향을 억제하기 위한 결정 궤환 적응형 대역 제한 방법에 대한 연구)

  • 박구현;한상철;류탁기;홍대식;강창언
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.28 no.11C
    • /
    • pp.1111-1117
    • /
    • 2003
  • The maximum Doppler frequency, or equivalently, the mobile speed is very useful information to optimize the performance of many wireless communication systems. However, the performance of a maximum Doppler frequency estimator is limited since it requires an estimate of the signal-to-noise ratio (SNR) of the channel environment. In this paper, the improved method for the maximum Doppler frequency estimations based on the decision feedback Doppler adaptive band-limit (DF-DABL) method is proposed. To reduce the effect of additive noise, the proposed algorithm uses a novel Doppler adaptive band-limit (DABL) technique. The distortion due to the additive noise is drastically removed by the proposed DF-DABL method. Especially, the DF-DABL method does not need any other channel information such as SNR.

A Study on Improvement of Limit Speed for CBTC within Exsiting Urban Railroad Sectors (기존 도시철도 구간에서 CBTC를 위한 제한속도 향상에 관한 연구)

  • Ha, Kwan-Yong;Park, Jong-Hun;Lee, Jong-Kye;Sung, Ki-Chang;Kim, Gi-Chun
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.356-362
    • /
    • 2011
  • Usually urban railways are built under ground thus the necessary condition of urban railroad, a linear-shaped track, causes a difficulty in enhancement of speed limits of urban rail. Also the underground construction of city railroad produces speed limit values reduced according to a speed code array, in case of speed decision according to the conventional block section division, thus onventionally it could not but apply speed limit values lower than actual safety speeds. In this study, The above two facts induced the author to study on a method to enhance speed limit values for CBTC within existing urban railroad sectors. Since it is possible to exchange data continuously and to control speeds in case of railroads based on CBTC, the author applied result values of speed limits, which were gained based on a railroad condition, a linear track, to the CBTC system without correction of the result values and then the author compared and analyzed, through simulation, the running times and the efficiencies of running energies between railway stations, between the existing fixed-block system and the CBTC system. As a result simulation, the improvement of speed and the deceleration distance of reduction confirmed that it was effective to reduce the time to travel between stations. A fixed block the set of constraints on the speed limit, he way the operation is optimized based CBTC speed limit by suggesting ways to reset the scheduled speed measures to improve were extracted.

  • PDF

On the Multiple Constructed ATC(Automatic Train Control) Systems for the Railway Vehicles (철도차량용 다중화된 ATC 장치)

  • 이을재;박선순;김영석
    • Proceedings of the KIPE Conference
    • /
    • 1996.06a
    • /
    • pp.43-46
    • /
    • 1996
  • The carborne Automatic Train Control(ATC) system keeps automatically optimum train speed code signals from wayside(track) circuit equipment. If there is no response for braking against the over speed detected, the driver will be noticed instantly by visual and audible warning signals. And then the ATC processes into braking mode for safe train operations to prevent any hazards by over speed limit. In this paper we are introduced the novel ATC system which has triple constructed structure made by 32 bit floating point DSP(ADSP21020-20) and process dealed with frequency domain and time domain for detecting signals. Owing to these reason it is no needed several band pass filters used in conventional ATC systems to detect the speed limit frequency. Also system's reliability and tolerance are incremented by adopt to 2 out of 3 logic to the outputs decision.

  • PDF

A Study on Variable Speed Limit Strategies in Freeway Work Zone Using Multi-Criteria Decision Making Process (다기준 의사결정기반 고속도로 공사구간 VSL전략에 관한 연구)

  • Park, Juneyoung;Oh, Cheol;Chang, Myungsoon
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.5
    • /
    • pp.3-15
    • /
    • 2013
  • The purpose of this study is to propose a methodology for operating variable speed limit (VSL) strategies in freeway work zones. A notable feature in this study is to incorporate a multi-criteria decision making process into deriving better VSL strategies. Decision criteria in this study include operational efficiency, safety, and environmental impacts. Travel speed, acceleration noise, and CO2 were used as performance measures for evaluating VSL strategies. A multi-criteria value function was developed through an analytical hierarchical process (AHP) for representing expert's knowledge. Then, a variety of VSL operations scenarios were investigated utilizing a microscopic traffic simulation suite, VISSIM. The proposed methodology would be useful in supporting more efficient, safer, and more environment-friendly traffic operations and control in freeway work zones.

Development of the Speed Limit Model for Harbour and Waterway(I) - Considerations Discrimination for Speed Limit Decision - (항만과 수로의 제한속력 설정 모델 개발에 관한 연구(I) - 제한속력 설정을 위한 고려요소 식별 -)

  • Kim, Deug-Bong;Jeong, Jae-Yong;Park, Jin-Soo;Park, Young-Soo
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.2
    • /
    • pp.171-178
    • /
    • 2015
  • This research is the first research on developing the speed limit select model and also it is the result of the research on the importance of each element and consideration factors when selecting the speed limit. For the consideration factor discrimination and calculation of the importance, the delphi method and AHP method was used. The delphi survey was processed through third round survey, 5 high consideration factor(Level 1) and 23 low consideration factor(Level 2) was discriminated. During the process of the third delphi survey, when the CVR cost was in the range between 0.4~1.0 it was treated as the consideration factor when selecting the speed limit and less than 0.4 cost was eliminated. In the process of the second delphi survey, 33 consideration factors were discriminated but was reordered into 23 categories through the third survey. Based on the 23 categories earned through the third delphi analysis, the AHP survey was processed. The result of the AHP survey was that out of the importance of the 5 high consideration factor(Level 1), the traffic condition was evaluated as the number one factor and the vessel condition, waterway condition, environment condition, supporting condition and etc. conditions were evaluated following the traffic condition. Out of the 23 low consideration factor(Level 2) consideration, the visibility was evaluated to be the first important and the performance of the vessel steering, objective factors within the harbor, amount of traffic and density, distance between the passing vessel, speed of the steering capacity and tidal current were the following evaluated factors.

Determining Ideal Distance between Consecutive Exit Ramps (고속도로 연결로상 연속 분류지점 간의 이격거리 검토)

  • Lee, Seongkwan Mark;Lee, Ki Young;Jang, Jung Hwa
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.65-72
    • /
    • 2011
  • When an expressway intersects another expressway, a unique connector needs to be designed between the two consecutive exit ramps. In such a case, it is important to design a connector such that there is enough distance for drivers to find their way safely. A current design manual in Korea prescribes the minimum length of the connector as 240 m. In this research, we have suggested a method for calculating the minimum length of a connector in order to check the feasibility of the currently prescribed length. For this purpose, we have attempted to determine the total perception-reaction time and lane-changing time required by a driver. For determining the driver's perception-reaction time, we have used the driver's decision time in addition to the conventional 2.5 s of perception-reaction time for stopping sight distances. We have considered both the design speed and the average travel speed for the calculation of the length. To evaluate the accuracy of the new method, we have chosen four sites on expressways for which relatively high accident rates were recorded. As a result, we could verify that the current limit (240 m) was sufficient for drivers to be able to change lanes in the given specific geometry. However, the prescribed limit should be revised in case the drivers' decision time is considered to be their perception-reaction time. All new approaches for calculating the ideal length of a connector have been carried out by taking into account the design speed as well as the average travel speed. Owing to the characteristics of the specific geometry for two consecutive exit ramps and the large difference between the design speed and the average travel speed in the objective areas, it is more realistic to use the proposed method by keeping the decision time equal to a driver's perception-reaction time, in order to determine the ideal distance that should be maintained between two consecutive exit ramps.

A Study on the Characteristics Improvement of Electro-Hydraulic Servo System Controlled by High Speed Solenoid Valve (고속전자밸브로 제어되는 전기.유압 서보시스템의 특성 개선에 관한 연구)

  • Park, Seong-Hwan;Lee, Jin-Geol
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.7 no.4
    • /
    • pp.288-294
    • /
    • 2001
  • In this study, a new PWM method considering the actuation delay of high speed solenoid valves is proposed to improve the response characteristics of electro hydraulic servo systems controlled by high speed solenoid valves. In addition, the decision method for the system gain, the basic period of PWM, and the sampling time is proposed, Since the conventional system controlled by high speed solenoid valves is too slow to apply this method, a high speed driving circuit(Quick-Drive) which enables rapid switching of the high speed solenoid valve at a high speed sampling mode is applied to realize this method. The experimental result shows that it is possible to achieve precision and quiet control without occurrence of limit cycle and wide range dead band.

  • PDF

Prioritizing Freeway Segments for Variable Speed Limit (VSL) Operations based on Traffic Safety (교통안전을 고려한 고속도로 가변제한속도 운영구간 우선순위 결정 연구)

  • Choi, Sae-Ro-Na;Lee, Kee-Yong;Oh, Cheol
    • Journal of Korean Society of Transportation
    • /
    • v.30 no.3
    • /
    • pp.57-70
    • /
    • 2012
  • Variable speed limit(VSL) is a useful speed management tool for alleviating traffic congestion and enhancing traffic safety. The purpose of this study is to identify promising freeway segments for safety enhancement through VSL operations. An ordered probit model was adopted to capture factors affecting freeway crash severity that can be used to support decision making for selecting the promising segments. Pseudo elasticity and marginal effects, which are outcomes of the ordered probit analysis, were used to determine priority of promising segments for traffic safety. The results of this study would be useful in installing VSL systems and developing traffic control and operations strategies in practice.

Control of nonlinear production-distribution process with limited decision policy (최대구매 제한을 갖는 비선형 생산분배계의 제어)

  • 정상화;정상표;오용훈
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.14 no.3
    • /
    • pp.156-165
    • /
    • 1997
  • In the practical control systems, the dynamic range of actuatiors is limited(or saturated) when actuators are driven by sufficiently large signals. This gives rise to a nonlinearity as a result of actuator saturation. For example, the upper limit is imposed on productive capability by available factory space and capital equipment. Other examples of those kinds of actuator saturations are a maximum torque of the actua- ting motors and a throttle position in an aircraft speed control A saturating actuator may lead not only to a large overshoot during start-up and shut-down, but also to deterioration of the performance due to the uncertainties. That is, the speed of response is decreased and, possibly, the system output may not follow the lalrge reference inputs. The large-overshoot may be accompanied by rest wind-up(or called by integra- tor wind-up) which comes from controllers with integral action in saturation operation regions. Eventually, as the overshoot increases, the system has a limit cycle or becomes oscillatorily unstable. Due to these cir- cumstances, many studies are focused on the stability and robustness of the nonlinear systems with satu- rating actuator in the time-domain as well as in the frequency-domain.

  • PDF