• Title/Summary/Keyword: Software Development Project Management

Search Result 255, Processing Time 0.029 seconds

An Suggestion of the Software Industry Structure Improvement in Korea : Focusing on the IT Service and Solution Provider Firms (국내 소프트웨어 산업 구조의 개선에 대한 제안 : IT서비스 및 솔루션 기업을 중심으로)

  • Ahn, Yeon S.;Moon, Song Chul
    • Journal of Information Technology Applications and Management
    • /
    • v.21 no.1
    • /
    • pp.165-176
    • /
    • 2014
  • This paper was tried to show the improvement model for software industry structure in Korea regarding to have the global level of competence in Korean software firms. To suggest the improvement model for software industry structure, the detailed status about software industry which as in the supply and demand perspectives and comparativeness dimension were analysed. Also to this model the special survey results from the 35 professionalists in the software industry were included. This improvement model suggests the big software firms have to consider the economy of the scale, and to enter global IT market, the other SMEs have to pursuit themselves as a specified technology firms. So it is good for the oversea project collaboration with the solution provider firms and IT service firms. And it is desirable to make a the economy of scale regarding as the solution venture startup, M&A, networking the software firms as supply chain. Also the development of new business model for new market and firms with the high-tech business competency will be required.

Design of Quality Metrics and Accreditate Procedure for SW Process Improvement based on K-model (K-모델기반의 소프트웨어 프로세스 품질 척도 및 인증절차 설계)

  • Hwang, Sun-Myung
    • Journal of Advanced Navigation Technology
    • /
    • v.13 no.6
    • /
    • pp.861-875
    • /
    • 2009
  • In order to make high quality software and high reliability software, systematic development management and organizational support are essential needed. Since 1990's Software process models such as ISO/IEC 15504 and CMMI have been used to improve organization capability. But these models have problems that are used to apply on large scaled organization or large project and so many practices are actually required. We present characteristics of ISO/IEC 15504, CMMI and K-model can easily apply to small and medium sized business or project, and propose the standard quality metric and accreditate procedure based on K-model for measuring quantitative quality level.

  • PDF

A Study on Tourist Destination Remodeling: Gossi-Cave in Yeong Wol (동굴관광지 리모델링 개발사례 연구 - 고씨동굴 관광지를 대상으로 -)

  • Park, Yong-Soon;Park, Han-Sik
    • Journal of Korean Society of Rural Planning
    • /
    • v.14 no.3
    • /
    • pp.99-110
    • /
    • 2008
  • Tourist destination remodeling project is the tourist destination activation program to promote underdeveloped tourist destination that the Ministry of Culture and Sports has been implementing as a pilot program since 2005. Since previous tourist destination development programs focused on developing facilities, they could not quite cope with the changes in the tourism paradigm. Especially for caves, they could not escape from the simple sightseeing for the characteristics of the resource were fit to the caves. These results failed to meet tourist demands to experience and participate that the number of tourists is continuously decreasing. To cope with the circumstances, the government introduced a pilot program, a comprehensive tourist destination reorganization plan designed to comprehensively promote the tourism contents development (software) that can differentiate the region such as the tourism activation programs, tourist destination management and operation system reorganization (humanware) along with the repair of facilities (hardware project). This study emphasized the participation of residents who are the actual subject of management and operation of tourist facilities and programs in the course of establishing the master plan for remodeling for Gossi Cave that it can be used as the reference for establishing remodeling plan based on resident participation in the future.

Development of the Performance Analysis Model Based on Research and Development Phases for Automated Construction Equipment

  • Lee, Jeong-Ho;Kim, Young-Suk
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.1-17
    • /
    • 2012
  • The automated construction machines have been recently developed to help solve the construction industry problems that significantly affect labour, productivity, quality, and profit. Despite the importance of performance analysis to commercialize the automated construction machines, previous studies have mainly concentrated on developing hardware and software of automated construction machines. This research now focuses on two objectives: (1) to propose an analysis model which can measure productivity, quality, and safety improvement rate of automated construction machines based on research and development (R&D); and (2) to develop a performance analysis system which will aid the evaluator in analysing the performance of automated construction machines. Finally, it is anticipated that the effective use of the performance analysis model and computerized system will ably develop the high-performance, automated construction machines and establish the marketing strategy to increase not only the commercial value but also the upkeep and development of construction machines.

A Study of Standard Curriculum for Software Process and Quality (SW프로세스 및 품질 표준커리큘럼에 관한 연구)

  • Yeom, Hee-Gyun;Hwang, Sun-Myung
    • Journal of Digital Convergence
    • /
    • v.10 no.1
    • /
    • pp.317-321
    • /
    • 2012
  • There are SW engineering absence that cause the SW quality and Productivity Increase problems during software development project. Are exist necessity awareness of SW engineering growth and professional SW engineering manpower education. This paper define the SW Engineering standard Curriculum that establishment continuous growth and suggest guide manpower practical use guide. When performing the projects, we can suggest for SW Engineering professionals acquisition and standard to solve them by using Standard Curriculum for Software Engineering, which can strengthen manpower capacity the organization SW Engineering. This research provides solution of SW Process Curriculum about SW Development Process and SW Quality.

A Study on Suggestions for Activating Smart Contract - Focusing on Software Export Business (스마트계약의 활성화 방안에 관한 연구 - 소프트웨어 수출사업을 중심으로)

  • Whayoon Song
    • Korea Trade Review
    • /
    • v.47 no.1
    • /
    • pp.163-180
    • /
    • 2022
  • The purpose of this study is to examine the extent to which smart contracts can be applied to the software export business and to find out the legislative issues to activate smart contracts. A smart contract is a computer program that automatically executes a contract when conditions are fulfilled. Smart contracts can play a pivotal role in the field that requires immediate execution of contract or in a highly standardized field with multiple parties involved. In the software export business, it is desirable to apply the smart contract partially rather than applying the smart contract to the entire process because various parties are involved and the process is very complicated. The business model of exporting packaged software, a completed software that is mainly licensed for use, rather than the business model of exporting customized software is suitable for using smart contracts because the project for implementing customized software is mainly focused in the development stage. When smart contracts are used in processes such as contract signing, payment, and project management, work efficiency can be increased. In addition, smart contracts can be used when conditions can be quantified, such as error penalties, in areas that previously required contracts with third parties such as banks, guarantors. In order for smart contracts to be actively used in practice, legal reviews on various issues are necessary including the legality of a smart contract and the validity as an electronic document of NFT (non-fungible token) certificate. Also, for the system stability preventing hacking, etc, the periodic verification or inspection by a third party is essential. To activate smart contracts in international transactions the international treaty regarding smart contracts is also necessary.

A Study on Escalation of Commitment Behavior in Software Projects : The Perspective of Cultural Differences (소프트웨어 개발 프로젝트에서 수행의 지속행위에 관한 연구 : 문화적 차이의 관점에서)

  • 김인재;심형섭;김종은
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.2
    • /
    • pp.1-14
    • /
    • 2004
  • The level of sunk cost and risk-taking theory have been offered as one explanation for the escalation of commitment behavior. This Study attempted to replicate Keil's study in Korea. Keil examined the level of sunk cost associated with the risk propensity and risk perception of decision-makers, and these factors are assessed for cross-cultural robustness using matching laboratory experiments carried out in three countries. The level of sunk cost and the risk perception of decision-makers contributed significantly to their continuous willingness to their project. Moreover, the risk propensity of decision-makers was inversely related to risk perception, and this inverse relationship was significantly more weak in Korea than in Singapore. These results show that the sunk-cost effect exists across cultures, and that the risk-taking behaviors are partially mediated by cultural factors.

  • PDF

A Study on Development Project Management using Open Source Configuration Management and Defect Tracking Tools (오픈소스 형상도구와 결함추적도구를 이용한 개발 프로젝트 관리에 관한 연구)

  • Lee, Jihyun;Park, Youngsik
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.1445-1447
    • /
    • 2012
  • 팀으로 구성된 개발 조직은 주어진 시간 안에 가용할 수 있는 인력으로 고객에게 전달될 최종 산출물인 소프트웨어를 개발한다. 개발과 통합을 거친 소프트웨어는 테스트를 거치며 발생되는 결함에 대해 수정 조치한다. 하지만 결함 수정과 병행하여 초기 요구사항은 변경되고 추가되어 개발되는 소프트웨어에 반영되야 함으로 팀에서는 메일, 전화, 또는 게시판 방식으로 결함 사항을 알리고 최종 소프트웨어를 개발해 나간다. 본 논문은 이러한 환경에 결함추적도구를 사용하여 결함 발견 시 등록하고, 해결된 소프트웨어의 버전을 관리하기 위한 방법에 대해 오픈소스 기반의 형상관리도구와 결함추적도구를 활용한 환경을 연구해 나가고자 한다.

Development of an Object-Relational IFC Server

  • Hoon-sig Kang;Ghang Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1346-1351
    • /
    • 2009
  • In this paper we propose a framework for an Object Relational IFC Server (OR-IFC Server). Enormous amounts of information are generated in each project. Today, many BIM systems are developed by various CAD software vendors. Industry Foundation Classes (IFC) developed by International Alliance for Interoperability (IAI) is an open standard data model for exchanging data between the various BIM tools. The IFC provides a foundation for exchanging and sharing of information directly between software applications and define a shared building project model. The IFC model server is a database management system that can keep track of transactions, modifications, and deletions. It plays a role as an information hub for storing and sharing information between various parties involved in construction projects. Users can communicate with each other via the internet and utilize functions implemented in the model server such as partial data import/export, file merge, version control, etc. IFC model servers using relational database systems have been developed. However, they suffered from slow performance and long transaction time due to a complex mapping process between the IFC structure and a relational-database structure because the IFC model schema is defined in the EXPRESS language which is object-favored language. In order to simplify the mapping process, we developed a set of rules to map the IFC model to an object-relational database (ORDB). Once the database has been configured, only those pieces of information that are required for a specific information-exchange scenario are extracted using the pre-defined information delivery manual (IDM). Therefore, file sizes will be reduced when exchanging data, meaning that files can now be effectively exchanged and shared. In this study, the framework of the IFC server using ORDB and IDM and the method to develop it will be examined.

  • PDF

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF