Browse > Article
http://dx.doi.org/10.6106/JCEPM.2012.2.2.001

Development of the Performance Analysis Model Based on Research and Development Phases for Automated Construction Equipment  

Lee, Jeong-Ho (Department of Architectural Engineering, Inha University)
Kim, Young-Suk (Architectural Engineering, Inha University)
Publication Information
Journal of Construction Engineering and Project Management / v.2, no.2, 2012 , pp. 1-17 More about this Journal
Abstract
The automated construction machines have been recently developed to help solve the construction industry problems that significantly affect labour, productivity, quality, and profit. Despite the importance of performance analysis to commercialize the automated construction machines, previous studies have mainly concentrated on developing hardware and software of automated construction machines. This research now focuses on two objectives: (1) to propose an analysis model which can measure productivity, quality, and safety improvement rate of automated construction machines based on research and development (R&D); and (2) to develop a performance analysis system which will aid the evaluator in analysing the performance of automated construction machines. Finally, it is anticipated that the effective use of the performance analysis model and computerized system will ably develop the high-performance, automated construction machines and establish the marketing strategy to increase not only the commercial value but also the upkeep and development of construction machines.
Keywords
Automation; performance analysis; safety; quality;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Y.S. Kim, J.H. Lee, "The Establishment of a Research and Development Process Model for Automated Construction Robots", The Journal of the Architectural Institute of Korea, vol. 19, no. 6, pp. 201-209, 2003.
2 Y. Kim, C. Haas, K. Boehme, Y. Cho, "Implementing an Automated Road Maintenance Machine (ARMM): Lessons from the Field", Automation and Robotics in Construction XVI, pp.459-464, 1999.
3 J. Kim, "A Hearing on the Establishment of the Second Basic Plan for Construction Industry Promotion", The Korea Research Institute for Human Settlements, 2002.
4 H. Ham, "Engineering Economy", Donghyun Publishing (www.dhpub.co.kr), 1998.
5 Y. Ham, S. Kwon, J. Noh, J. Han, K. Kim, "Development of Road Stripe Removing Equipment Using High-pressure Water Jet", Automation in Construction, vol. 15, no. 5, pp. 578-588, 2006.   DOI   ScienceOn
6 J. Han, K. Kim, Y. Kim, J. Lee, J. Kim, "A Development of Stewart Platform Based Pipe Manipulator", 21st International Symposium on Automation and Robotics in Construction, pp. 352-357, 2004.
7 R. Navon, "Conceptual Design of a Flooring robot: Development Methodology and Results", Automation in Construction, vol. 4, no. 3, pp.225-238, 1995.   DOI   ScienceOn
8 Y. Rosenfeld, A. Shapira, "Automation of Existing Tower Cranes: Economic and Technological Feasibility", Automation in Construction, vol. 7, no. 4, pp.285-298. 1998.   DOI   ScienceOn
9 A. Warszawski, Y. Rosenfeld, "Economic Analysis of Robots Employment in Building", 14st International Symposium on Automation and Robotics in Construction, pp. 177-184, 1997.
10 http://www.kicttep.re.kr
11 Y.S. Kim, "How Far Has the Development Technology for Automated Construction Robots Come?", The Construction Business Journal, no. 57, The Construction Economy Research Institute of Korea, pp. 54-56. 2006.
12 Y.S. Kim, "Development and Implementation of an Automated Pavement Crack Sealer", the Ministry of Construction and Transportation, 2004.