• Title/Summary/Keyword: Small Size Construction Site

Search Result 52, Processing Time 0.024 seconds

A Study on Improvement Plan to Enhancing the Effectiveness of Technical Guidance Project for Safety Control of Small Construction Site (소규모건설현장 안전관리를 위한 기술지도 사업의 실효성 제고를 위한 개선방안 연구)

  • Lim, HyoungChul;Beak, NakKyu;Kim, DaeYoung;Jeong, SeongChoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.79-85
    • /
    • 2018
  • The government and of the Safety and Health Corporation have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce accidents on the construction site. However, the number of disasters on the construction site is increasing every year, Which accounts for more than 80% of the total number of casualties. It is necessary to investigate the implementation status of safety and health management in the field of small-size construction site, and to provide the appropriate technical guidance plan to the relevant work places. Also, it is necessary to reduce the disaster at the small-size construction site, The purpose of this study is Improvement Plan to Enhancing the Effectiveness of Technical Guidance Project for Safety Control of Small Construction Site.

Profiling of Workers based on Safety Accident Big Data in Construction Site (건설현장 안전사고 빅 데이터 기반 작업자별 프로파일 분석)

  • Kang, Sung Won;Lee, Ki Seok;Yoo, Wi Sung;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.247-248
    • /
    • 2021
  • Recently, the government is pursuing to reduce the serious accidents in most industries, including the construction industry, by enacting laws on punishment. The accident rate tends to be depended on the size and type of construction sites, and the accidents occur frequently due to inadequate implementation of safety management system and management standards, especially, in small and medium-sized sites. This study has performed the profiling of 265,000 accident cases on construction sites by attribute analysis such as the ratio of days lost to work, and pattern of days lost to work compared to the size of the construction. It turned out that the proportion of accident cases was high mainly in small-scale construction sites, and long-term labor losses occurred. Shortly, it is necessary to establish an institutional standard for applying a realistic safety management cost calculation and management system centered on small-scale sites. Therefore, this study is expected to be used as fundamental data or guideline for developing a customized safety management and accident prevention system for a worker reflecting the conditions of a construction site in the future.

  • PDF

Computer Vision-based Continuous Large-scale Site Monitoring System through Edge Computing and Small-Object Detection

  • Kim, Yeonjoo;Kim, Siyeon;Hwang, Sungjoo;Hong, Seok Hwan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1243-1244
    • /
    • 2022
  • In recent years, the growing interest in off-site construction has led to factories scaling up their manufacturing and production processes in the construction sector. Consequently, continuous large-scale site monitoring in low-variability environments, such as prefabricated components production plants (precast concrete production), has gained increasing importance. Although many studies on computer vision-based site monitoring have been conducted, challenges for deploying this technology for large-scale field applications still remain. One of the issues is collecting and transmitting vast amounts of video data. Continuous site monitoring systems are based on real-time video data collection and analysis, which requires excessive computational resources and network traffic. In addition, it is difficult to integrate various object information with different sizes and scales into a single scene. Various sizes and types of objects (e.g., workers, heavy equipment, and materials) exist in a plant production environment, and these objects should be detected simultaneously for effective site monitoring. However, with the existing object detection algorithms, it is difficult to simultaneously detect objects with significant differences in size because collecting and training massive amounts of object image data with various scales is necessary. This study thus developed a large-scale site monitoring system using edge computing and a small-object detection system to solve these problems. Edge computing is a distributed information technology architecture wherein the image or video data is processed near the originating source, not on a centralized server or cloud. By inferring information from the AI computing module equipped with CCTVs and communicating only the processed information with the server, it is possible to reduce excessive network traffic. Small-object detection is an innovative method to detect different-sized objects by cropping the raw image and setting the appropriate number of rows and columns for image splitting based on the target object size. This enables the detection of small objects from cropped and magnified images. The detected small objects can then be expressed in the original image. In the inference process, this study used the YOLO-v5 algorithm, known for its fast processing speed and widely used for real-time object detection. This method could effectively detect large and even small objects that were difficult to detect with the existing object detection algorithms. When the large-scale site monitoring system was tested, it performed well in detecting small objects, such as workers in a large-scale view of construction sites, which were inaccurately detected by the existing algorithms. Our next goal is to incorporate various safety monitoring and risk analysis algorithms into this system, such as collision risk estimation, based on the time-to-collision concept, enabling the optimization of safety routes by accumulating workers' paths and inferring the risky areas based on workers' trajectory patterns. Through such developments, this continuous large-scale site monitoring system can guide a construction plant's safety management system more effectively.

  • PDF

Improvement of Construction Management Process for the Site Manager in Small Scale Building Construction Project (소규모 건설프로젝트에서 현장관리업무 개선방안)

  • Lee, Da-Un;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.81-87
    • /
    • 2018
  • Since February 2017, site managers in small architectural projects are required by the revised building act. In order to address issues for site managers and to improve project efficiency, system improving methods are surveyed and proposed in this study. The key inspection items in the existing surveillance guidance manual were investigated, and the checklist for site managers for a small to medium sized construction site was analyzed. This study also tries to propose using web-based site management systems for improvement of the utilization of checklists. It is expected that these on-site management systems, along with BIM technology, will be able to monitor the small size building construction project in real time and effectively monitor the various problems occurring on-site.

A Study on Store Space Supply in Apartment Sites (아파트단지 내의 상가공급 재고에 관한 연구)

  • 김한수
    • Journal of the Korean housing association
    • /
    • v.11 no.4
    • /
    • pp.53-63
    • /
    • 2000
  • The study focuses on the problems of store space supply in apartment sites and suggests policy directions for the problem. Based on the results of field survey and site reconnaissance, this study identifies following problems and policy directions. First, the stores do not meet consumers various demand due to item limitations with small size. Consequently, there are many closed and/or unsold stores with high vacancy rates, Second, there is a tendency that the closed store rate becomes higher as apartment size becomes smaller. We suggest some law and regulation amendment that make store supply optional rather than mandatory in the case of small apartment site construction.

  • PDF

Survey on Transition Process of Construction Sites in Left and Right of Lecture Hall in the Temple of Baekje During the 6~7th Century (6~7세기 백제 사찰 내 강당 좌우 건물지의 변천과정 고찰)

  • Jung, Ja-Young
    • Journal of architectural history
    • /
    • v.19 no.6
    • /
    • pp.137-153
    • /
    • 2010
  • Jeongrimsaji as temple remains of Baekje Sabi period, its re-excavation has been carried three times in full scale. As a result, the buildings in left and right of lecture hall was largely identified in 3 forms. First, layout of small buildings in left and right of lecture hall. Second, layput of corridor in left and right of lecture hall. Third, layout of construction site in the north of corridor in left and right of lecture hall. Above second is included into remains of Gorye, the third is included into remains of Baekje - the remains were almost ruined then. The first form and third form in above is different each other in size of buildings, form of layout, and location. It is important to investigate these points: the time of constructing the buildings; what position have the use and function of the buildings in the temple? ; transition process of layout of the Buddhist temple. In this context, of temple remains in Baekje during the 5~7th century, the cases where construction sites in left and right of lecture hall and construction site in the north of corridor are identified, have been reviewed. Based on this review, the use and function of buildings, their transition process were investigated. The survey results show that small buildings in left and right of lecture hall existed in the middle and later period of the 6th century. During the later 6th century ~ the 7th century, construction site in narrow and long square shape was located in left and right of lecture hall instead of small buildings in the north of corridor. Therefore, it is identified that the aforementioned thing is earlier stage and the latter thing is later stage.

Compressive Strength Properties of Small Diameter Core Concrete with Coarse Aggregate Particle Distribution (굵은 골재 입도분포에 따른 소구경 코어 콘크리트의 압축강도 특성)

  • Lee, Jin-Won;Lee, Sang-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.145-146
    • /
    • 2023
  • One of the causes of recent construction site collapses was that the compressive strength of concrete was less than half of the allowable design standard strength range. In the safety diagnosis of structures, the compressive strength of concrete is a factor that determines the durability of a building. Therefore, in this study, we aim to examine the characteristics of compressive strength according to the particle size distribution of coarse aggregate among the compressive strength factors using small-diameter cores. To avoid problems when collecting cores, core specimens with diameters of 100×200, 50×100, and 25×50 (mm) were manufactured directly. As a result of measuring the compressive strength of concrete for each diameter, the larger the core diameter, the higher the compressive strength. has increased.

  • PDF

A Case Study on Application and Standardization of Safety Adminstration Model in Complex Style Multiflex Housing Business. (단지형 다세대주택신축사업의 안전경영모델 표준화 및 적용사례 연구)

  • Kim, Sung Soo;Yoo, Tae Gyeong;Yoo, Jin Yeol;Lee, Tae Sik
    • Journal of Korean Society of Disaster and Security
    • /
    • v.9 no.2
    • /
    • pp.43-52
    • /
    • 2016
  • Notwithstanding industrial accident decrease generally, Construction industry is on the rise recently. Most accident occurs in the small scale like as multiflex housing, remodeling, neighbourhood facility more than safety supervisor appointed large scale construction site. By the size of business place, 81.6% of total accident occurs mostly in small scale site that is bellow 120 billion won and 50 manpower. This paper aimed that small scale housing company achieve a zero hazard practising and understanding the safety adminstration standar d model easily and it applied firstly after investigating the operation condition of construction site safety control in small scale company propelling the complex style multiflex housing business.

Development of Safety Strap to Prevent Fall Accidents (추락 사고 방지를 위한 안전대 개발)

  • Lim, kyeongmin;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.159-160
    • /
    • 2021
  • Every year on a construction site safety scale of the crash of an accident, but the large and small, accounting for more than half. In Construction Field wearing safety belts for their safety, but the impact of fracture, including the risk of injury occurs. Accordingly, the death as well as by the crash, injuries that can reduce the size of the invention was driven by safety belts.

  • PDF

The Effects of Golf Course Construction on the Geomorphic Characteristics of a Small Watershed (골프장 조성이 소유역의 지형적 특성에 미치는 영향 분석)

    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.27 no.2
    • /
    • pp.41-50
    • /
    • 1999
  • The purpose of this study is to find out the changes in geomorphic characteristics of a small watershed when a golf course is constructed. The research site is a set of seven small watersheds including an 18-hole golf course that were randomly selected. The size, shape, and drainage network of watersheds were measured by using planimeter, watershed eccentricity, and stream order, respectively. In addition, a 25m$\times$25m mesh was used on topographic maps and grading plans in order to obtain the slope, elevation, and aspect of the watersheds. The major results of this research, while investigating of the changes in geomorphic characteristics of watersheds when a golf course is constructed, are as follows: 1. The size of watersheds is increased in accordance to the difference in elevation between the golf course site and the small watershed. 2. The watershed eccentricities are in general similar except for a few low-valued cases. 3. The changes in the average altitude and the gradient are more drastic with their bigger original values. 4. The aspects are changed more with decreasing elevation. 5. The stream order decreases in the case of a low watershed eccentricity. 6. The surface modification has a closer relationship to the slope rather than the size of effective use area. 7. With a steeper gradient and an excessively low gradient, the height of cutting/filling is increased.

  • PDF