• Title/Summary/Keyword: Small Construction Sites

Search Result 224, Processing Time 0.025 seconds

Methodology for Prioritizing Sidewalk Construction among 100 Candidate Sites on Rural National Highways (지방부 국도에서의 보도설치 우선순위 결정을 위한 방법론 개발 (일반국도 적용사례 중심으로))

  • Jeon, Woo Hoon;Yang, Choong Heon;Yoon, Jung Eun;Yang, Inchul
    • International Journal of Highway Engineering
    • /
    • v.17 no.4
    • /
    • pp.127-133
    • /
    • 2015
  • PURPOSES: The purpose of this study is to develop a methodology to prioritize sidewalk construction on rural national highways. METHODS : In order to determine an appropriate prioritization for sidewalk construction, we developed a specific methodology. The proposed methodology includes three main steps: 1) Analytic Hierarchy Process (AHP) methods, 2) Subjective evaluation of relevant road agencies for the candidate sidewalks along rural national highways, and 3) Field study conduction. Each step has four phases. The primary feature of this methodology is the addition of expert consultation and survey data, as well as a field study. In addition, the method could guarantee flexibility in selection for evaluation criteria. As a result, the proposed methodology could be used as a general procedure for application to other roadway classifications when considering sidewalk construction. RESULTS: In order to demonstrate the reasonableness of the proposed methodology, a case study was performed for exactly 100 candidate sites for sidewalk construction on rural national highways. All required evaluation scores were properly produced for each candidate site. By doing so, decision-makers can determine the priority for sidewalk construction at these sites by reviewing quantitatively and qualitatively considered data. CONCLUSIONS: The results of the case study can be applied to a long-term fundamental plan for sidewalk construction on rural national highways. Furthermore, this methodology could be employed to prioritize a small-scale SOC project(e. g. bicycle or pedestrian roads).

USING WEB CAMERA TECHNOLOGY TO MONITOR STEEL CONSTRUCTION

  • Kerry T. Slattery;Amit Kharbanda
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.841-844
    • /
    • 2005
  • Computer vision technology can be used to interpret the images captured by web cameras installed on construction sites to automatically quantify the results. This information can be used for quality control, productivity measurement and to direct construction. Steel frame construction is particularly well suited for automatic monitoring as all structural members can be viewed from a small number of camera locations, and three-dimensional computer models of steel structures are frequently available in a standard electronic format. A system is being developed that interprets the 3-D model and directs a camera to look for individual members as regular intervals to determine when each is in place and report the results. Results from a simple lab-scale system are presented along with preliminary full-scale development.

  • PDF

Derivation of Key Safety Management Factors by Construction Process through Cross-Tabulation Analysis between Accident Types and Objects (건설공사 공종별 사고유형 및 사고객체 교차분석을 통한 중점안전관리항목 도출)

  • Yoo, Nayeong;Kim, Harim;Lee, Chanwoo;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.127-128
    • /
    • 2022
  • The construction industry has a higher disaster rate than other industries, so safety education and management are highly important. In order to reduce the construction accident rate, it is necessary to study the key safety management factors reflecting the characteristics of the construction industry, where there are differences in processes and manpower input for each process, and a small number of managers. Therefore, in this study, key safety management factors for each Process of construction were derived through cross-analysis between safety accident types and accident occurrence objects through disaster case data. The extracted key safety management factors are expected to provide useful information for safety education and supervision of construction sites.

  • PDF

A Basic Study on the Analysis of Construction Accident Statistics Data (건설안전사고 통계데이터 분석에 관한 기초연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.122-123
    • /
    • 2018
  • Although the disaster rate of the industry as a whole is on a downward trend, the disaster rate of the construction industry is on an ongoing trend. Therefore, in this study, we analyzed safety accident statistical data of the construction site over the past three years. As a result of the analysis, the incidence of disasters at small construction sites was very high. And the proportion of disaster occurred for workers who worked in less than 6 months even roughly 92.6%. In addition, as a result of analyzing the form of disaster occurrence, the crash was 34.1% and the fall was 15.1%. The analysis results of these construction safety accidents are to provide as a basic material for developing a policy that can prevent safety accidents and a safety accident prediction model.

  • PDF

A Case Study on the Measurement and Estimation of Bearing Capacity of Large Diameter Bored Pile (대구경 현장타설말뚝의 지지력 측정 사례연구)

  • 이원제;정훈준;이우진;장기수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.285-292
    • /
    • 2000
  • Though there has been increasing use of large diameter drilled shaft as a foundation structure of bridges, current practice for quality control is to confirm the minimum required load carrying capacity during construction stage. For economic and appropriate design of drilled shaft, it is necessary to evaluate the load transfer mechanism by pile load tests during initial stage of construction and to use the test results as a feedback to a revision of initial design. In this paper, results of load tests peformed at several domestic sites are presented to investigate the load transfer characteristics of large diameter drilled shaft. It was found that most of the load on piles is sustained by shaft friction and that only small portion of the load reaches the bottom of the drilled shaft. Some test results of drilled shaft by Pile Driving Analyzer performed at same sites are also presented to compare the load transfer characteristics interpreted from static pile load tests.

  • PDF

The state of Act and Policy for Recycling of Construction Industry Wastes

  • Ahn, Ji-Whan;Lee, Yong-Hee;Kim, Hyung-Seok;Lee, Bong-Han;Kim, Hwan;Oh, Jae-Hyun;Gung, Yeon-Nam;Kang, Byung-Ok;Kim, Kyung-Soo
    • Proceedings of the IEEK Conference
    • /
    • 2001.10a
    • /
    • pp.671-674
    • /
    • 2001
  • In Korea, because of the shortage of reclaimed lands and disposal sites and the small size of national land, A political measure for construction wastes recycling is needed. therefore we studied the current state of construction wastes recycling and the act for it. And we analyzed problems and unreasonable regulations regarding the wastes. So we suggested an alternative act to increase the construction wastes recycling.

  • PDF

A Study on the Improvement of Technical Guidance Fee for Preventing Accidents at Small-Medium Construction Sites (중·소규모 건설현장 재해예방 기술지도 대가 개선에 관한 연구)

  • Lim, Se-Jong;Shin, Seung-Hyeon;Won, Jeong-Hun;Yoon, Young-Cheol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.469-481
    • /
    • 2021
  • Under Korean law, small-to-medium-sized construction projects with budgets of more than 100 million won and less than 12 billion won must receive technical guidance by a visiting technician belonging to a specialized institution. This study proposed a method for calculating the technical guidance fee to prevent the potential inadequacy of technical guidance when the responsibility providing the technical guidance fee is changed from a contractor to a client. The method simplified the construction works which should receive technical guidance into four sections according to the construction amount. For each section, the number of instances of technical guidance per day provided by the visiting technician and the minimum technical grade of the visiting technician were limited, and the guideline for estimating engineering services fees was applied to calculate the fee per instance of technical guidance. The results show that the proposed method can be applied to the establishment of a technical guidance fee guideline since it well reflects the current fee distribution and K2B analysis results.

The Fundamental Study of Height Determination Using GPS Leveling Technique (GLT에 의한 정밀 표고결정의 기초적 연구)

  • 강인준;장용구;곽영주
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.19 no.2
    • /
    • pp.155-161
    • /
    • 2001
  • When determining a three dimensional position for engineering purposes, we can use the GPS survey to find position. According to the enhancement of precision for domestic Geoid model, the positional accuracy of GPS about precise method of vertical position has been also increased. But by considering Geoid undulation, it is difficult to measure GPS-derived elevations. Because Geoid undulation has changed little in local sites, GPS-derived elevations are similar to orthometric height. By ignoring Geoid undulation, it is possible to measure GLT-derived elevations at the local. small construction sites. GLT(GPS Leveling Technique) provides a method for computing orthometric heights. GLT processes the data more rapidly than conventional measurement devices. We only considered the weight factors affecting accuracy between the points. That is, the GPS procedures to produce satisfactory elevation accuracy depends on the method of observations, receivers and conditions of the local environment. A comparison was performed between the GPS survey using Geoid model and GLT at a part within Pusan National University and construction model sites in South Korea. And the writers proved the GPS surveying is efficient in positioning accuracy, time, and cost on a construction sites.

  • PDF

Change of Heavy Metals and Sediment Facies in Surface Sediments of the Shihwa Lake (시화호 표층퇴적물의 중금속 및 퇴적상 변화)

  • 최만식;천종화;우한준;이희일
    • Journal of Environmental Science International
    • /
    • v.8 no.5
    • /
    • pp.593-600
    • /
    • 1999
  • In order to determine the changes of sediment facies and metal levels in surface sediments after the construction of Shiwha Lake, surface sediments were sampled at 8 sites located on the main channel monthly from June, 1995 to August, 1996 and analysed for 12 metals (Al, Fe, Mn, V, Cr, Co, Ni, Cu, Zn, Cd, As and Pb) by ICP/AES and ICP/MS. Two groups of sampling sites(the inner lake with 3 sites and the outer lake with 5 sites) are subdivided by the surface morphology ; the inner lake is a shallow channel area with a gentle slope, while the outer lake is relatively deep and wide channel with a steep slope which has many small distributaries. After the construction of dam, fine terrestrial materials were deposited near the outer lake, which resulted in the change of major sediment facies from sandy silt to mud. With the deposition of fine sediments in the outer lake, anoxic water column induced the formation of sulfide compounds with Cu, Cd, Zn and part of Pb. Metal (Cr, Ni, Cu, Zn and Cd) contents in sediments increased up to twice within 2 years after the construction of dam. This is due to the direct input of industrial and municipal wastes into the lake and the accumulation of metals within the lake. In addition, frequent resuspension of contaminated sediments in a shallow part of the lake may make metal-enriched materials transport near the outer lake with fine terrestrial materials. As the enrichment of Cu, Zn, Cd and part of Pb in the Shiwha Lake may be related to the formation of unstable sulfide compounds by sulfate reduction in anoxic water or sediment column, the effect of mixing with open coastal seawater is discussed.

  • PDF

Assessment of Fire Evacuation Safety for Building Construction (건축물 건설공사시 화재피난안전성 평가에 관한 연구)

  • Jeong, Myeong-Jin;Lee, Myeong-Gu;Ham, Eun-Gu
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.119-124
    • /
    • 2014
  • Recently buildings are constructed in larger and higher scales and becoming more complex. However from small to large scale buildings and on construction sites there still are fire safety accidents that occur continuously. Therefore this study is aimed to assess of evacuation safety for building construction by use of simulation. On this study, the evacuation times required were estimated for the permissible evacuation times in cases. Fire safety management plans were suggested for building construction.