• Title/Summary/Keyword: Slab joint

Search Result 223, Processing Time 0.03 seconds

Analytical Studies on Shape of Shear Pocket of Full-Depth Precast Slab (프리캐스트 바닥판의 전단포켓 형상에 관한 해석 연구)

  • Han Sang-Yun;Lee Man-Sup;Lee Seong-Rok;Song Jae-Joon;Kang Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1119-1124
    • /
    • 2004
  • Full depth precast concrete bridge deck system can be advantageously to reduce construction time, hence lowering the cost. This system has several significant design and construction component. To connect between the concrete slab and steel girder, precast deck has shear pocket. Post-tensioning tightens the joints and prevents any leakage though the joint. When post-tensioning is applied, stress concentration occurs in the edge of shear pocket. In this study, precast decks using four types of shear pocket is analyzed by F.E.M.

  • PDF

The Reasonable Concrete-Placing Methods and Sequences of Composite Steel Bridge (강합성형 교량의 합리적인 타설방법과 순서에 관한 연구)

  • Jo, Byung-Wan;Seo, Sug-Gu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.3 no.2
    • /
    • pp.205-212
    • /
    • 1999
  • Recently, unexpected cracks in the concrete deck slab of composite steel bridges have been widely reported at an early age of concrete placing due to the concrete placing sequence and methods. Accordingly, the analytical research was carried out to verify the negative moment at an internal supports due to the several concrete pouring sequence and to determine the reasonable concrete placing method on the deck slab of composite steel bridge. The results show that the conventional concrete-placing method, which pours concrete first on the positive moment regions and then negative regions, leads to the minimum moment at an internal supports. However, the conventional method produces two impractical construction joints on every spans and makes field engineer to pour concrete continuously. In conclusion, this concrete-placing method was verified to be reasonable only when the construction joint was placed at the $\frac{5}{8}l{\sim}\frac{6}{8}l$ location of the middle span.

  • PDF

Fatigue Durability of Cramp Joint at Precast Highway Deck Slabs (프리캐스트 바닥판용 클램프 조인트의 피로내구성)

  • Kim, Yoon Chil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.2
    • /
    • pp.156-162
    • /
    • 2008
  • The fatigue durability test using the actual size beam was performed with a cramp joint in order to apply to the highway bridge deck slab. Three types of beam were investigated for durability performance by considering stress conditions in real bridge deck slabs, 1) A beam with major shear force applied at the joint (RC Type) 2) A beam with major bending moments applied at the joint (PSC Type) 3) A beam with the pure shear applied at the joint. The experiment for beams with cramp joints showed that the cramp joint had enough durability for fatigue regardless of the overlaid length of the looped distribution bars under the current design strength level. Moreover, it was clarified that the enough durability for fatigue under the load repetition was achieved by increasing the joint span grater than 1.5D with the consideration of the deformation due to reduction in joint stiffness.

Interaction between opening space in concrete slab and non-persistent joint under uniaxial compression using experimental test and numerical simulation

  • Vahab Sarfarazi;Kaveh Asgari;Mehdi Kargozari;Pouyan Ebneabbasi
    • Computers and Concrete
    • /
    • v.31 no.3
    • /
    • pp.207-221
    • /
    • 2023
  • In this investigation, the interaction between opening space and neighboring joint has been examined by experimental test and Particle flow code in two dimension (PFC2D) simulation. Since, firs of all PFC was calibrated using Brazilian experimental test and uniaxial compression test. Secondly, diverse configurations of opening and neighboring joint were provided and tested by uniaxial test. 12 rectangular sample with dimension of 10 cm*10 cm was prepared from gypsum mixture. One quarter of tunnel and one and or two joint were drilled into the sample. Tunnel diameter was 5.5 cm. The angularities of joint in physical test were 0°, 45° and 90°. The angularities of joint in numerical simulation were 0°, 30°, 60°, -30°, -45°, -60° and its length were 2cm and 4cm. Loading rate was 0.016 m/s. Tensile strength of material was 4.5 MPa. Results shows that dominant type of crack which took place in the model was tensile cracks and or several shear bands develop within the model. The Final stress is minimum in the cases where oriented angle is negative. The failure stress decrease by decreasing the joint angle from 30° to 60°. In addition, the failure stress decrease by incrementing the joint angle from -30° to -60°. The failure stress was incremented by decreasing the number of notches. The failure stress was incremented by decreasing the joint length. The failure stress was incremented by decreasing the number of notches. Comparing experimental results and numerical one, showed that the failure stress is approximately identical in both conditions.

Experiments on Longitudinal Joints of Precast Composite Hollow Slabs (프리캐스트 합성 중공바닥판의 교축방향 이음부에 대한 실험)

  • Shim, Chang-Su;Chung, Young-Soo;Kim, Dae-Ho;Min, Jin;Kim, Byung-Suk
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.14-17
    • /
    • 2004
  • A prefabricated composite hollow slab with perforated I-beams was suggested for the replacement of deteriorated concrete decks or the construction of new composite bridges with long-span slabs. Composite slabs with embedded I-beams have considerably higher stiffness and strength. For the application of prefabricated composite slabs to bridges, joints between slabs should satisfy the requirements of the ultimate limit state and the serviceability limit state. In this paper, three types of the detail for loop joints were selected and their structural performance in terms of strength and crack control was investigated through static tests on continuous composite slabs. A main parameter was the detail of the joint, such as an ordinary loop joint and loop joint with additional reinforcements. Even though there was no connection of the steel beams at the joints, the loop joints showed good performance in ultimate strength. In terms of crack control, the loop joint with additional reinforcements showed better performance. In ultimate limit state, the continuous composite slabs showed good moment redistribution and ductility.

  • PDF

Development of Evaluation Method for Jointed Concrete Pavement with FWD and Finite Element Analysis (FWD와 유한요소해석을 이용한 줄눈콘크리트포장 평가법 개발)

  • Yun, Kyong-Ku;Lee, Joo-Hyung;Choi, Seong-Yong
    • International Journal of Highway Engineering
    • /
    • v.1 no.1
    • /
    • pp.107-119
    • /
    • 1999
  • The joints in the jointed concrete pavement provide a control against transverse or longitudinal cracking at slab, which may be caused by temperature or moisture variation during or after hydration. Without control of cracking, random cracks cause more serious distresses and result in structural or functional failure of pavement system. However, joints nay cause distresses due to its inherent weakness in structural integrity. Thus, the evaluation at joint is very important. and the joint-related distresses should be evaluated reasonably for economic rehabilitation. The purpose of this paper was to develop an evaluation system at joints of jointed concrete pavement using finite element analysis program, ILLI-SLAB, and nondestructive testing device. FWD. To develop an evaluation system for JCP, a sensitivity analysis was performed using ILLI-SLAB program with a selected variables which might affect fairly to on the performance of transverse joints. The most significant variables were selected from precise analysis. An evaluation charts were made for jointed concrete pavement by adopting the field FWD data. It was concluded that the variables which most significantly affect to pavement deflections are the modulus of subgrade reaction(K) and the modulus of dowel/concrete interaction(G), and limiting criteria on the performance of joints at JCP are 300pci. 500,000 lb/in. respectively. Using these variables and FWD test, a charts of load transfer ratio versus surface deflection at joints were made in order to evaluate the performance of JCP. Practically, Chungbu highway was evaluated by these evaluation charts and FWD field data for jointed concrete pavement. For Chungbu highway, only one joint showed smaller value than limiting criterion of the modulus of dowel/concrete interaction(G). The rest joints showed larger values than limiting criteria of the modulus of subgrade reaction(K) and the modulus of dowel/concrete interaction(G).

  • PDF

Nonlinear Analysis for Negative Moment Distribution of MRS Slab End Joints (비선형 해석에 의한 MRS 슬래브 단부 접합부의 모멘트 분포 연구)

  • Moon, Jeong-Ho;Oh, Young-Hun;Lim, Jae-Hyung
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.2
    • /
    • pp.177-184
    • /
    • 2011
  • This paper describes an analytical study on the design approach of PC system with continuous connections at member ends. In multi-ribbed moment resisting slab (MRS) system, double tee members are connected continuously over inverted tee beams with the continuous reinforcements placed within topping concrete. Thus, negative moments are concentrated within the narrow connection area. In order to propose a design method, experimental results of the companion study were examined using detailed nonlinear analysis. Then nonlinear static analysis was used to evaluate the partial continuity effect and the moment redistribution mechanism. Material and cross sectional properties were obtained from experimental results of the companion study. Plastic hinge properties for nonlinear static analysis were modeled with cracking moment, nominal moment, corresponding member deformations, etc. The analysis results showed that a large amount of negative moment of MRS slab can be reduced by applying partial continuity and moment redistribution in MRS joint.

Estimation of Slab Response of Plate Girder Bridge in Traffic-Induced Vibration by Three-Dimensional Analysis (삼차원 해석에 의한 강합성교 바닥판의 교통유발진동 응답 평가)

  • Kim, Chul Woo;Kawatani, Mitsuo;Lee, Woo Hyun
    • Journal of Korean Society of Steel Construction
    • /
    • v.10 no.2 s.35
    • /
    • pp.263-277
    • /
    • 1998
  • Recently, it is frequently reported that fatigue damages of deck slabs and floor systems of highway bridges occur under the conditions of increasing weight and traffic of heavy vehicles. These troubles are affected by dynamic wheel load of heavy vehicles running on roadway surface roughness with bump at expansion joint. It is required that this kind of traffic-induced vibration of highway bridges must be analyzed by using three-dimensional models of bridge and vehicle. In this study, the three-dimensional dynamic analysis is carried out, and dynamic responses of deck slab and wheel loads of moving vehicle are estimated according to different vehicle speeds and bump heights. Analytical responses of bridge deck slab are compared with experimental ones which were measured at Umeda entrance bridge of Hanshin Expressway in Osaka.

  • PDF

Crack Control of the Upside of Double Tee Slab and Inversed Tee Beam Joint (더블티 슬래브-역티형 보 접합부 상부의 균열억제를 위한 실험연구)

  • Nam, Sang-Uk;Song, Han-Beom;Yi, Waon-Ho;Yang, Won-Jik;Baik, Young-Soo;Tae, Kyung-Hoon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.345-348
    • /
    • 2008
  • Recently, demand is caused that new building environment of value added rising demand on the lines of becoming bigger, manhattanize of structure and becoming high standard of structure in a construction site and influx of advanced foreign nation technique. To satisfy these requirements for alternative, structures applied to the PSC, PC is increasing. Double Tee Slab is possible for long length structure and applied to the method of construction. When assembling Double Tee Slab produced by the factory in the field, becamed carry-out topping concrete in upper, but occurred crack to slab line. There is no structural problem to crack occurred in upper, waterproof in maintenance and repair of structure due to a conservative cause several problems.

  • PDF

The Study of Longitudinal Joint with Tensile Grip Connection in Highway Bridges (교축방향 인장이음에 관한 연구)

  • Seo, Seung-Tag
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.9 no.2
    • /
    • pp.155-160
    • /
    • 2006
  • 합성상판을 시공하는 경우 교축방향에 분할된 저강판을 접합 일체화해야 한다. 본 논문에서는 강 콘크리트 합성상판을 대상으로 3종류의 배력철근 방향 이음구조를 제안하며, 보 공시체에 의한 정적 정점피로 실험한다. 그 결과 보의 피로실험 결과 저강판 혹은 고력볼트가 피로파단 하였으며, 3차원 FEM해석에 이음부의 휨 강성도 및 피로강도에 대해서 해석적으로 검토된다.

  • PDF