• Title/Summary/Keyword: Site Risk

Search Result 1,317, Processing Time 0.035 seconds

A Study on safety improvement of Underground wall construction to Design for Safety (설계안전성검토를 통한 지하외벽공사의 안전개선 연구)

  • Ji, Kyung-Hwan;Choi, Byong-Jeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.4
    • /
    • pp.56-68
    • /
    • 2019
  • Safety-conscious design on site is required for site constructions because of the introduction of the design for safety, but it still leaves much to be desired. This study compared the site where the design was applied and the site where it was not applied. The applied case examined the underground wall construction during frame construction, which corresponds to the skeleton of the building construction. The underground wall construction is quite risky due to the exposure to exterior environments and involvement of various stages, such as scaffolding, formwork, reinforcing work, and concrete casting work. Therefore, the risk factors for each stage were identified and a risk assessment was carried out to select an alternative method to reduce the risk. The risk factors of the selected alternative construction method were also identified and a risk assessment was conducted. The risk assessment weight was calculated by comparing the site where the construction method was applied and the site where it was not, explaining the necessity of the design for safety in reducing the risk. In addition, an actual case where an alternative construction method was used was studied to highlight the necessity for a design for safety.

Multi-unit Level 2 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site

  • Cho, Jaehyun;Han, Sang Hoon;Kim, Dong-San;Lim, Ho-Gon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1234-1245
    • /
    • 2018
  • The risk of multi-unit nuclear power plants (NPPs) at a site has received considerable critical attention recently. However, current probabilistic safety assessment (PSA) procedures and computer code do not support multi-unit PSA because the traditional PSA structure is mostly used for the quantification of single-unit NPP risk. In this study, the main purpose is to develop a multi-unit Level 2 PSA method and apply it to full-power operating six-unit OPR1000. Multi-unit Level 2 PSA method consists of three steps: (1) development of single-unit Level 2 PSA; (2) extracting the mapping data from plant damage state to source term category; and (3) combining multi-unit Level 1 PSA results and mapping fractions. By applying developed multi-unit Level 2 PSA method into six-unit OPR1000, site containment failure probabilities in case of loss of ultimate heat sink, loss of off-site power, tsunami, and seismic event were quantified.

Case Study of Health Risk Assessment and Preliminary Remediation Goals Calculation for the Petroleum Contaminated Site (유류 오염지역 토양의 위해성 평가 및 사전복원목표 산정 사례연구)

  • 정규혁
    • Environmental Analysis Health and Toxicology
    • /
    • v.17 no.4
    • /
    • pp.347-355
    • /
    • 2002
  • As concerns on the effects of soil contamination on human health have grown, more efforts have been made to quantify the effects. One of such efforts is the development of risk assessment methodology. The fundamental objectives of this approach is to investigate the alternative options that reduce the risk of hazardous chemicals results from environmental pollution, which will eventually lead to an accomplishment of removement of identified toxicants in polluted environment. The U.S. EPA Risk Assessment guidance for the superfund (RAGS) provides a methods for assessing the health risk of contaminated soils and determining the preliminary remediation goals (PRGs). Using this approach, we assessed the health risk and preliminary remediation goals of petroleum contaminated site in Kyounggi province.

Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method (FMECA 기법을 적용한 건설현장 거푸집작업의 통합 안전위험성 평가 및 대응방안 마련)

  • An, Sun-Ju;Song, Sang-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.39-48
    • /
    • 2012
  • Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.

Improvement of Synthesis Construction Plan through 6sigma (6시그마를 통한 종합시공계획서 작성 프로세스 개선)

  • Baek, Ho-Jin;Yoo, Chang-Kyu;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.613-617
    • /
    • 2007
  • To achieve project successfully in domestic construction site, pre-management of risk is important factor. Synthesis Construction Document made early construction is representative as means of pre-management of risk. But, Synthesis Construction Document is not working properly for pre-management of risk because the level is low as Synthesis Construction Document is made formally and the time is too late to pre manage the risk for various factor. A epoch-making method that differ with existing need to solve this deep-rooted problem of domestic construction site. So, this study is analyzing to achieve subject to heighten level Synthesis Construction Document and shorten creation period with "S"construction company(introducing 6sigma by tool of management innovation 6 sigma)'s data and offering an opportunity that heightens effectiveness and goes forward and aims possibility about construction site suitability of 6sigma by confirming Pilot Test.

  • PDF

An Empirical Study on the Determinants of e-Trust - Focused on the Domestic Trade Portal Site - (e-신뢰(e-Trust)의 결정요인에 관한 연구 -국내 무역포털사이트를 중심으로-)

  • Song, Sun-Yok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.41
    • /
    • pp.205-234
    • /
    • 2009
  • The trade portal site is one of the innovative skills which makes it possible for trade companies to manage international trade activities more efficiently by using the newest information technology. Especially, trade portal site can be considerable help to small and medium-sized enterprises which have much difficulties in finding overseas buyers due to the lack of international marketing capabilities. This study attempts to present a comprehensive model about the determinants of e-Trust in domestic trade portal site and to suggest practical strategies for e-Trade. Therefore, a theoretical framework was presented by the literature review, and a empirical study was carried out through a questionnaire survey to those who have had experiences of visiting trade portal site. The empirical analysis had the following results. First, it reveals that reputation, web-site quality, transaction efficiency of the trade portal site have influence upon e-Trust dimension. On the other hand, perceived risk did not have significant relationship with e-Trust. Second, e-Trust had significant impact on willingness to depend on the trade portal site. And also, e-Trust had positive influence on performance of using which is measured by sales increase, information sharing, and synergy effect.

  • PDF

Suggestions for Increasing Utilization of KORA for Supporting the Off-site Risk Assessment System (화학사고 장외영향평가 지원 프로그램(KORA)의 활용도 증대를 위한 제언)

  • Kim, Jungkon;Ryu, Jisung;Ryu, Taekwon;Kwak, Sollim;Lim, Hyeongjun;Choi, Woosoo;Jung, Jinhee;Lee, Jieun;Lim, Dongyeon;Yoon, Junheon
    • Journal of Environmental Health Sciences
    • /
    • v.44 no.2
    • /
    • pp.124-132
    • /
    • 2018
  • Objectives: All enterprises intending to install and operate hazardous chemical handling facilities should prepare an off-site risk assessment (ORA) report that evaluates the impact of potential chemical accidents on the surrounding environment and population. This study was conducted to introduce the process of development and the functioning of the Korea Off-site Risk Assessment support tool (KORA) developed by the National Institute of Chemical Safety and to suggest manners to increase its utilization. Additionally, this article provided an overview of KORA. Methods: In order to identify problems with and refinements for KORA, the required items for each phase of KORA were derived by analyzing the Chemical Control Act and related administrative regulations. Results: The functions of KORA made receptor-considered assessment of chemical accidents possible, but several limitations were found in particular phases, such as the analysis of impact range, consideration of sensitive receptors, and assessment of environmental receptors. Conclusion: In this study, we suggested manners to increase the utilization of KORA. It is anticipated that the further research suggested in the study could contribute to the stabilization of the KORA system.

A Study on the Risk Factors at the Broadcasting Production Site (방송 제작 특성에 기반한 유해위험요인 분석)

  • Nam, Yun Kyung;Jin, Sangeun;Lee, Jong-Bin;Kim, Kyungwoo;Na, Minoh
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.67-75
    • /
    • 2020
  • Due to various industrial accident that occur to the staff in the broadcasting production sites, the issue of safety at the broadcast production site is becoming a social issue. Nevertheless, not many researches have been carried out on the actual conditions of the staff's production environment and its safety issues. Therefore, the purpose of this study was to prepare a countermeasure based on engineering knowledge by analyzing working environment to improve the poor working environment of staff. First, this study analyzed statistical data of industrial accidents over the past five years to find out the current status of disasters at broadcasting production sites. As a result, the intensity of the accident was not weak in that the loss days was more than one month in 85% of accident. In addition, the type of accident was high in the fall/trip accidents. Second, this study visited 10 broadcasting production sites for risk assessment. By analyzing the characteristics of the working environment and 104 questionnaires, we predicted the types of accidents that can occur in the broadcasting production site. As a result, accident types such as fall, collision, and trip were relatively high, similar to the characteristics of construction site. Third, it was possible to quantify the scale of the risk in the broadcasting production, and as a result, the quantity of temporary structure and accident risk were proportional. In other words, this study analyzes broadcasting work environment and defines risk factors based on safety engineering knowledge. Finally, this study suggested a guideline to improve the safety of the broadcasting production site.

Determination of Target Clean-up Level and Risk-Based Remediation Strategy (위해성에 근거한 정화목표 산정 및 복원전략 수립)

  • Ryu, Hye-Rim;Han, Joon-Kyoung;Nam, Kyoung-Phile
    • Journal of Soil and Groundwater Environment
    • /
    • v.12 no.1
    • /
    • pp.73-86
    • /
    • 2007
  • Risk-based remediation strategy (RBRS) is a consistent decision-making process for the assessment and response to chemical release based on protecting human health and the environment. The decision-making process described integrates exposure and risk assessment practices with site assessment activities and remedial action selection to ensure that the chosen actions are protective of human health and the environment. The general sequences of events in Tier 1 is as follows: initial site assessment, development of conceptual site model with all exposure pathways, data collection on pollutants and receptors, and identification of risk-based screening level (RBSL). If site conditions do not meet RBSL, it needs further site-specific tier evaluation, Tier 2. In most cases, only limited number of exposure pathways, exposure scenarios, and chemicals of concern are considered the Tier 2 evaluation since many are eliminated from consideration during the Tier 1 evaluation. In spite of uncertainties due to the conservatism applied to risk calculations, limitation in site-specific data collections, and variables affecting the selection of target risk levels and exposure factors, RBRS provides us time- and cost-effectiveness of the remedial action. To ensure reliance of the results, the development team should consider land and resource use, cumulative risks, and additive effects. In addition, it is necessary to develop appropriate site assessment guideline and reliable toxicity assessment method, and to study on site-specific parameters and exposure parameters in Korea.

A Basic Study on Quantification Risk Model of Human Accidents on Exterior Construction Site in South Korea (국내 건설현장 내·외부 인명사고 리스크 정량화 모델 개발 기초연구)

  • Oh, Jun-Seok;Ha, Sun-Geun;Kim, Tae-Hee;Jeon, Sang-Sub;Kim, Ji-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.132-133
    • /
    • 2018
  • Many studies regarding construction safety management have been conducted. However, it is insufficient to research on external construction site. As a result, ordinary people around the construction site have injured and have a negative view when they think construction industrial since it has regarded having an overfull industrial accidents on media. To break the stereotype and prevention of accident on construction industry have been emphasized at this point in time, it is necessary to establish a comprehensive safety management system which is considered not only internal safety management but also external safety management. Therefore, the objective of this study is to develop the human accident risk quantification model by utilizing the third party payout data which occurred by incomplete safety management on external construction site. This study is conducted as a basic study for developing safety management manuals on internal·external construct site. In the future, it is expected to be used as a reference.

  • PDF