Improvement of Synthesis Construction Plan through 6sigma

6시그마를 통한 종합시공계획서 작성 프로세스 개선

  • 백호진 (한양대학교 건축공학과) ;
  • 유창규 (한양대학교 건축환경공학과) ;
  • 이윤선 (한양대학교 건축환경공학과) ;
  • 김재준 (한양대학교 건축환경공학과)
  • Published : 2007.11.09

Abstract

To achieve project successfully in domestic construction site, pre-management of risk is important factor. Synthesis Construction Document made early construction is representative as means of pre-management of risk. But, Synthesis Construction Document is not working properly for pre-management of risk because the level is low as Synthesis Construction Document is made formally and the time is too late to pre manage the risk for various factor. A epoch-making method that differ with existing need to solve this deep-rooted problem of domestic construction site. So, this study is analyzing to achieve subject to heighten level Synthesis Construction Document and shorten creation period with "S"construction company(introducing 6sigma by tool of management innovation 6 sigma)'s data and offering an opportunity that heightens effectiveness and goes forward and aims possibility about construction site suitability of 6sigma by confirming Pilot Test.

국내 건설현장에서 프로젝트를 성공적으로 수행하기 위해서는 Risk 사전관리가 중요한 요인이다. 사전 Risk를 관리하는 수단으로 공사 착공 초기 작성되는 종합시공계획서가 대표적이다. 그러나 여러 가지 요인으로 인해 종합시공계획서가 내용면에서 형식적으로 작성되어 수준이 낮고 Risk를 제어하기 늦은 시점에 작성됨으로 해서 Risk 사전관리 차원의 종합시공계획서의 역할을 제대로 수행하지 못하고 있다. 이는 국내 건설현장의 고질적인 문제로 기존과 다른 획기적 방법으로 해결해야 가능하다고 판단된다. 이에 6시그마를 도입하여 경영혁신의 도구로 활용하고 있는 S사의 데이터를 활용하여 이 문제를 6시그마과제로 수행함으로써 Risk 사전관리 차원에서의 종합시공계획서를 활용 가능토록 문서의 수준을 높이고 작성기간을 단축할 수 있는 개선방안에 대해 알아보고, 이를 실제 현장에 적용한 Pilot Test 결과를 확인함으로써 종합시공계획서의 실효성을 높이고 나아가 6시그마의 건설현장 적용성에 대한 가능성을 가늠하는 기회를 제공하고자 한다.

Keywords