• Title/Summary/Keyword: Site Risk

Search Result 1,338, Processing Time 0.032 seconds

A Study on the Safety Distances for High Pressure-toxic Gases by Specific Accident Scenarios (고압 독성가스 사고발생 시나리오별 안전거리 확보에 관한 연구)

  • Kim, Song-Yi;Hwang, Yong-Woo;Lee, Ik-Mo;Moon, Jin-Young
    • Journal of the Korean Institute of Gas
    • /
    • v.20 no.6
    • /
    • pp.1-8
    • /
    • 2016
  • Gu-mi hydrogen fluoride leak accident in 2012 was amplified social anxiety for chemical accidents. To relieve these anxieties Off-site Risk Assessment was introduced in 2015. Off-site Risk Assessment is targeted at most chemicals, and most of the high-pressure-toxic gases which are mainly used in high-tech industries such as semi conductor, display, Photovoltaic panels industry are included in the substance of the Off-site Risk Assessment. Since Korean companies occupy a high market share in high-tech industries, high pressure-toxic domestic gas consumption is constantly increasing. Accordingly, it is expected to increase the possibility of accidents. In accordance with the circumstances, this study was to conducted Consequence Analysis(CA) about high pressure-toxic gases those are high demand in domestic. CA was used for ALOHA developed by US EPA & US NOAA and the CA result of Arsine was the largest at 4,700 m. CA results are expected to be utilized for determining the effective Safety distances when high pressure-toxic gas leak.

Leachate Concentration to Groundwater Considering Source Depletion for Risk Assessment in Vadose Zone of Contaminated Sites (오염부지 위해성평가 시 불포화대 오염원 고갈을 고려한 토양유출수 농도 결정)

  • Chang, Sun Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.6
    • /
    • pp.583-592
    • /
    • 2020
  • This study assessed source depletion in the vadose zones of contaminated sites. The possible range of infiltration rate in Korea was statistically analyzed. The results showed a trend of decreasing leachate concentration of 13 pollutants used for risk assessment. Among them, benzene, ethylbenzene, toluene, and xylene showed a lower leachate concentration in groundwater over time due to their low distribution coefficient and also possible biodegradation effects. The average values of the relative concentration could be taken as a default index due to a very small range of uncertainties. In the case of heavy metals, it was shown that the leachate concentration in a pollutant does not decrease over time. Considering the annually different infiltration, a site-specific source-depletion scenario was applied to Cheongju in North Chungcheong Province. The result was expressed as a time series of the relative concentration of the leachate concentration, and this was compared to the trend by averaged Korean infiltration. Finally, an open-source code that used Python was used to help calculate the leachate concentration by this site-specific infiltration scenario.

Contamination Characteristics of Hazardous Air Pollutants in Particulate Matter in the Atmosphere of Ulsan, Korea (울산시 미세먼지의 유해대기오염물질 오염 특성)

  • Lee, Sang-Jin;Kim, Seong-Joon;Park, Min-Kyu;Cho, In-Gyu;Lee, Ho-Young;Choi, Sung-Deuk
    • Journal of Environmental Analysis, Health and Toxicology
    • /
    • v.21 no.4
    • /
    • pp.281-291
    • /
    • 2018
  • Recently, long-range atmospheric transport (LRAT) from China is regarded as a major reason for elevated levels of particulate matter (PM) in Korea. However, local emissions also play an important role in PM pollution, especially in large-scale industrial cities. In this study, PM samples were collected at suburban, residential, and industrial sites in Ulsan, Korea. Polycyclic aromatic hydrocarbons (PAHs) and heavy metals were analyzed, and a potential human health risk assessment was conducted. The concentrations of PAHs and heavy metals in total suspended particles (TSP) increased during high $PM_{10}$ episodes, and backward trajectory analysis verified the influence of LRAT from China during the high episodes. Furthermore, the concentrations of PAHs and heavy metals in $PM_{2.5}$ and $PM_{10}$ at the industrial site were higher than those at the residential site. The risk assessment of PAHs and heavy metals in $PM_{2.5}$ suggested no significant health effects. The highest levels of PAHs were measured in the particle size of $0.32{\sim}0.56{\mu}m$ at the residential site, and those of heavy metals were detected in the particle size of 1.8~5.6 and $>18{\mu}m$, reflecting different major emissions sources for both groups. On the basis of this preliminary study, we are planning long-term monitoring and modeling studies to quantitatively evaluate the influence of industrial activities on the PM pollution in Ulsan.

Enhancing Small-Scale Construction Sites Safety through a Risk-Based Safety Perception Model (소규모 건설현장의 위험성평가를 통한 안전인지 모델 연구)

  • Kim, Han-Eol;Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.97-108
    • /
    • 2024
  • This research delves into the escalating concerns of accidents and fatalities in the construction industry over the recent five-year period, focusing on the development of a Safety Perception Model to augment safety measures. Given the rising percentage of elderly workers and the concurrent drop in productivity within the sector, there is a pronounced need for leveraging Fourth Industrial Revolution technologies to bolster safety protocols. The study comprises an in-depth analysis of statistical data regarding construction-related fatalities, aiming to shed light on prevailing safety challenges. Central to this investigation is the formulation of a Safety Perception Model tailored for small-scale construction projects. This model facilitates the quantification of safety risks by evaluating safety grades across construction sites. Utilizing the DWM1000 module, among an array of wireless communication technologies, the model enables the real-time tracking of worker locations and the assessment of safety levels on-site. Furthermore, the deployment of a safety management system allows for the evaluation of risk levels associated with individual workers. Aggregating these data points, the Safety Climate Index(SCLI) is calculated to depict the daily, weekly, and monthly safety climate of the site, thereby offering insights into the effectiveness of implemented safety measures and identifying areas for continuous improvement. This study is anticipated to significantly contribute to the systematic enhancement of safety and the prevention of accidents on construction sites, fostering an environment of improved productivity and strengthened safety culture through the application of the Safety Perception Model.

On-the-go Nitrogen Sensing and Fertilizer Control for Site-specific Crop Management

  • Kim, Y.;Reid, J.F.;Han, S.
    • Agricultural and Biosystems Engineering
    • /
    • v.7 no.1
    • /
    • pp.18-26
    • /
    • 2006
  • In-field site-specific nitrogen (N) management increases crop yield, reduces N application to minimize the risk of nitrate contamination of ground water, and thus reduces farming cost. Real-time N sensing and fertilization is required for efficient N management. An 'on-the-go' site-specific N management system was developed and evaluated for the supplemental N application to com (Zea mays L.). This real-time N sensing and fertilization system monitored and assessed N fertilization needs using a vision-based spectral sensor and controlled the appropriate variable N rate according to N deficiency level estimated from spectral signature of crop canopies. Sensor inputs included ambient illumination, camera parameters, and image histogram of three spectral regions (red, green, and near-infrared). The real-time sensor-based supplemental N treatment improved crop N status and increased yield over most plots. The largest yield increase was achieved in plots with low initial N treatment combined with supplemental variable-rate application. Yield data for plots where N was applied the latest in the season resulted in a reduced impact on supplemental N. For plots with no supplemental N application, yield increased gradually with initial N treatment, but any N application more than 101 kg/ha had minimal impact on yield.

  • PDF

Multiple, Sequential, Remote Intracranial Hematomas Following Cranioplasty

  • Moon, Hong-Joo;Park, Ju-No;Kim, Sang-Dae;Lim, Dong-Jun;Park, Jung-Yul
    • Journal of Korean Neurosurgical Society
    • /
    • v.42 no.3
    • /
    • pp.228-231
    • /
    • 2007
  • The intracranial hemorrhage in regions remote from the site of initial operations is unusual but may present as fatal surgical complication. We report a rare case of multiple, sequential, remote intracranial hematomas after cranioplasty in a patient who did not have any prior risk factors. A 51-years-old man was transferred to the hospital after a head trauma. The brain computed tomography (CT) revealed acute subdural hemorrhage on the right hemisphere with prominent midline shifting. After performing decompressive craniectomy and hematoma removal, the patient recovered without any complications. However, the patient showed neurological deterioration immediately after cranioplasty, which was done three months after the first surgery. There was extensive hemorrhage in the posterior fossa remote from the site of the initial operation site. The brain CT taken soon after removing this hematoma evacuation displayed large epidural hematoma on the left hemisphere. This case represents posterior fossa hemorrhage after supratentorial procedure and sequential delayed hematoma on the contralateral supratentorial region thus seems very rare surgical complications. Despite several possible pathogenetic mechanisms for such remote hematomas, there are usually no clear cut relationships with each case as in our patient. However, for the successful outcome, prompt evaluation and intensive management seem mandatory.

A Study on the Risk of Organic Solvents for Underground Area under Construction Site through a Fire Accident Case (화재사고사례를 통해서 본 건설현장 지하공간에서의 유기용제의 위험성에 대한 연구)

  • Ahn, Byung-Joon;Jung, Ki-Hyuk;Lee, Jung-Suk;Rhim, Jong-Kuk
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.1
    • /
    • pp.9-17
    • /
    • 2018
  • In the consideration of the working conditions, which have several kinds of works operating at the same time, at construction sites, it is difficult to prevent industrial accidents. There are a number of works to employ flammable materials and hot works simultaneously operated without fire protection systems. It causes a huge fire and casualties. In this research to analyze an accident case, the reasonable prevention methods are suggested throughout the property tests for the organic solvents and the analysis of the behavior for vapour cloud in the underground area of the construction site.

Trend in Off-Line PD Monitoring with HVAC Testing (배전반 설비의 온라인 모니터링 및 진단의 동향)

  • Yun, Ju-Ho;Hong, Chang-Il;Hwang, Jong-Sun;Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2007.06a
    • /
    • pp.529-530
    • /
    • 2007
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway - (철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 -)

  • Kim, Hwan-Yong;Shin, Min-Ho;Han, Sang-Cheon;Choi, Young-Woo;Kim, Chang-Ho
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.41-48
    • /
    • 2018
  • Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.

A Case Study of Disaster Accidents at Construction Site Based on PDCA Theory

  • Shin, Dong-Won;Kong, Ha-Sung
    • International journal of advanced smart convergence
    • /
    • v.10 no.3
    • /
    • pp.245-256
    • /
    • 2021
  • This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.