DOI QR코드

DOI QR Code

Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway -

철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 -

  • 김환용 (인천대학교 도시건축학부) ;
  • 신민호 (한국철도기술연구원) ;
  • 한상천 (인천대학교 도시건축학부) ;
  • 최영우 (인천대학교 도시건축학부) ;
  • 김창호 (인천대학교 도시건축학부)
  • Received : 2018.11.19
  • Accepted : 2018.11.20
  • Published : 2018.12.31

Abstract

Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.

Keywords

HBOOB1_2018_v8n4_41_f0001.png 이미지

Figure 1. Osong test line railway

HBOOB1_2018_v8n4_41_f0002.png 이미지

Figure 2. Railway infrastructure process in application

Table 1. Current status of osong test line railway

HBOOB1_2018_v8n4_41_t0001.png 이미지

Table 2. Quantification index of BIM usage and unused

HBOOB1_2018_v8n4_41_t0002.png 이미지

Table 3. Examination of cost calculation factors

HBOOB1_2018_v8n4_41_t0003.png 이미지

Table 4. Equation of consumption costs by using BIM

HBOOB1_2018_v8n4_41_t0004.png 이미지

Table 5. Consumption cost results from BIM use

HBOOB1_2018_v8n4_41_t0005.png 이미지

Table 6. Benefit/Cost according to a shorter period of work

HBOOB1_2018_v8n4_41_t0006.png 이미지

Table 7. Benefit calculation formula using BIM

HBOOB1_2018_v8n4_41_t0007.png 이미지

References

  1. Jang, Y. H., Park, S. I., Han, J. H., Lee, S. H. (2013). Utilization of IFC Data Model for Constructing Railway Bridge Library Based on BIM Standards, Korean Society of Civil Engineers, pp. 669-672.
  2. Kim, B. J., Ju, H. W., Jang, M. S., Kim, B. J., Chin, S. Y. (2016). An Analysis on Design Error Issues of BIM Conversion Design Projects through Case Studies, Journal of Korea Institute of BIM, pp. 47-57.
  3. Kim, H. S., Lee, J., Um. J. K., Im, J. W. (2012). Effectiveness analysis due to the public transportation's accessibility improvement coming close to Osong station, Journal of the Korean Society for Railway, pp. 903-912.
  4. Kim, J. H., Ji, S. G., Jeong, T. H., Seo, J. W. (2014). A Feasibility Study to Adopt BIM-based Infrastructure Management System, Journal of the Korean Society of Civil Engineers, 34(1), pp. 285-292. https://doi.org/10.12652/KSCE.2014.34.1.0285
  5. Kim, M. J., Lee, K. H., Kwon, S. H., Park, S. I., Lee, S. C. (2014). BIM application case study of civil infrastructure Industry, Journal of the Korean Society for Railway, pp. 1119-1124.
  6. Kim, M. J., Lee, K. H., Son, C. B. (2014). An Status Analysis on the BIM Utilization and Its Improvement Measures in Domestic Architects, Journal of the Architecture Institute of Korea, 30(8), pp. 79-86.
  7. Kim, Y. H., Kim, H. S., Kang, L. S. (2015). A Study of BIM Delivery Model for Railway Construction Project using BIM Function Breakdown Structure, Journal of the Korean Society for Railway, 18(4), pp. 344-353. https://doi.org/10.7782/JKSR.2015.18.4.344
  8. Lee, C. G., Lee, S. R., Wang, J. B. (2008). A Study on the Applicability Improvement Enhance of Rolling Stock Safety Regulation, Journal of the Korean Society for Railway, pp. 1570-1594.
  9. Lee, S. H., Kwak, C., Lee, K. J., Shin, T. H., Chin, S. Y., Kim, Y. S. (2009). A Derivation of BIM Adoption Strategy through Domestic and Foreign BIM-based Projects, Journal of the Architecture Institute of Korea, 29(1), pp. 677-680.
  10. Lee, T. H., Lee, S. B., Hong, H. P., Kim, B. G. (2010). A Review of the Interoperability of Signalling System between Trunk Lines with Metro Rail Network, Journal of the Korean Society for Railway, pp. 2317-2322.
  11. Lim, C. W., Yu, J. H., Kim, C. D. (2010). Analysis for BIM Object Information Compatibility Problem Classification Among BIM Softwares, Journal of the Korea Institute of Building Construction, pp. 257-260.
  12. Oh, H. O., Kim, J. H., Kim, M. S. (2011). The Study on the Structure Design Process and Modeling Guidelines Based on BIM, Journal of the Architecture Institute of Korea, 27(12), pp. 107-114.
  13. Park. J. W., Kim, S. C., Lee, S. S., Song, H. Y. (2009). Suggesting Solutions when Applying Building Information Modeling (BIM) to the Korean Construction Industry through Case Studies, Journal of the Korea Institute of Building Construction, pp. 93-102.
  14. Shin, M. H., Park, J. J., Lee, G. I., Kim, B. G., Min, B. E. (2016). Development of Rail Infrastructure Information Management System with Application of BIM, Korean Society of Civil Engineers, pp. 313-314.
  15. Son, J. I., Ock, J. H. (2016). A Study on Measurement Method of BIM ROI in Architectural Design Firm, Journal of Computational Design and Engineering, 21(3), pp. 267-280.

Cited by

  1. 특허 동시분류 네트워크 분석을 활용한 BIM 기술구조와 핵심기술 분석 vol.10, pp.2, 2018, https://doi.org/10.13161/kibim.2020.10.2.001