• Title/Summary/Keyword: Site Application Verification

Search Result 67, Processing Time 0.026 seconds

Development of LiDAR Drone-based Point Cloud Data Accuracy Verification Technology (드론 LiDAR를 활용한 점군 데이터 정확도 검증 기술 개발)

  • Jae-Woo Park;Dong-Jun Yeom
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.6_3
    • /
    • pp.1233-1241
    • /
    • 2023
  • This paper investigates the efficient application of drone LiDAR technology for acquiring precise point cloud data in construction and civil engineering. A structured workflow encompassing data acquisition, processing, and accuracy verification is introduced. Practical testing on a construction site affirms that drone LiDAR surveying yields accurate and reliable data across various applications. With a focus on accuracy and verification, the results contribute to the progression of surveying methodologies in construction and civil engineering. The findings provide valuable insights into the dynamic technological landscape of these fields, establishing a foundation for more effective and precise surveying techniques. This study underscores the transformative potential of drone LiDAR technology in shaping the future of construction and civil engineering survey practices.

A Study on the value decision and the application method of USLE factors for the soil loss estimation in the large scale site development area using GIS-In the Case of BuJu Mountain in MokPo City- (GIS를 이용한 대규모 단지 개발지의 토양유실량 추정을 위한 USLE의 인지값 결정과 적용 방법에 관한 연구-목포시 부주산을 대상으로-)

  • 우창호;황국웅
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.24 no.3
    • /
    • pp.115-132
    • /
    • 1996
  • The purpose of this study is to estimate the soil loss amount with Geographic Information System according to the land use change of Buju mountain area in Mokpo city. To estimate the soil loss, Universal Soil Loss Equation which is the most proper technique to predict soil loss in this site condition is adopted and IDRISI, a raster GIS software, is used. GIS application with USLE is very efficient to estimate soil loss accurately and fastly. In order to decide value and to find application method of USLE factors, we used existing rainfall erosion index, soil erodibility analysis, slope length, slope steepness, vegetation management and practices, which are rated by GIS through the analysis of various studies related USLE. The result of this study was compared with the previous other researches to verify our method of constructing numerical data of USLE's factors. The result of verification of our way showed significance for the soil loss in forest area. But the result of verification for the soil loss in forest area. But the result of verification for the soil loss of cultivated area showed some errors. It seems that this result was due to local variation of topographical map.

  • PDF

Development and Application of Timeout Protocol on OR (수술실 타임아웃 프로토콜 개발 및 적용)

  • Park, Jeong-Sook;Kim, Eun-Hee;Lee, Hye-Ran
    • Korean Journal of Adult Nursing
    • /
    • v.20 no.2
    • /
    • pp.353-363
    • /
    • 2008
  • Purpose: This study was conducted to develop a timeout protocol as the process of patients verification in the operating room, and to evaluate its effects. Methods: The timeout protocol was developed based on the experience of practices and the universal protocol of JCAHO 2004. The subjects of this study were 192 surgical members working in the operating room at an university hospital in Daegu, Korea. Results: The timeout protocol was developed in six steps; participants verification, encouragement of compliance, verification of right 3 PSP, agreement of surgical team members, verification of the parties to a patient, patient agreement. The data which have been resulted from the experimental group show significantly higher than those of control group as follows; cognition(t = -6.580, p = .000), contents of performance; progress of anesthesiologist as leader(${\chi}^2$ = 29.029, p = .000), verification of right patient, right site and right procedure(${\chi}^2$ = 40.663, p = .000), participation of surgical team(${\chi}^2$ = 68.412, p = .000), and the number of cases of performance(${\chi}^2$ = 242.900, p = .000). Conclusion: It suggests that medical accidents caused by failures in a preoperative verification process can be prevented if a timeout is conducted active involvement and effective communication among surgical team members for a final verification of the correct patient, procedure, and site.

  • PDF

Verification Methods of OWASP TOP 10 Security Vulnerability under Multi-Tenancy Web Site's Environments (멀티테넌시 기반 웹 사이트의 OWASP TOP 10 보안취약성 검증 방법)

  • Lee, Do Hyeon;Lee, Jong Wook;Kim, Jeom Goo
    • Convergence Security Journal
    • /
    • v.16 no.4
    • /
    • pp.43-51
    • /
    • 2016
  • Nowadays hacked using a security vulnerability in a web application, and the number of security issues on the web site at many sites due to the exposure of personal information is increasing day by day. In this paper, considering the open-source Web Application Security Project at the time of production of the website. Proposed the OWASP TOP 10 vulnerability verification method, by applying the proposed method and then analyzed for improved method and vulnerability to verify the performance of security vulnerability.

u-City service Model based on Implementation and Adaptability

  • Lee, Yeon-Ho;Ko, Seong-Sun;Lee, Nam-Yong;Kim, Jong-Bae
    • Journal of information and communication convergence engineering
    • /
    • v.8 no.3
    • /
    • pp.251-257
    • /
    • 2010
  • The realization of u-City is coming near in some local governments by applying various city services, namely, u-City services to the city construction field to improve competitiveness of the city. But it is a reality that some local governments are experiencing many trial and errors in application of the u-City service in addition to the problem posing that the u-City service is not considering characteristics of development or application environment of an individual city. The present research proposes a service model for on-site application of the u-City service to solve this problem. The proposed model suggests a method for specifically conceptualizing and objectifying the on-site application that the existing concept-oriented model or an architecture-oriented model, etc. didn't provide. The verification system on effectiveness or effects of the u-City service model to remove ambiguity on the u-City service especially. The verification system of the u-City service model grasps the technology, function, procedure and target, etc. that the u-City service contains, evaluates whether the model satisfies conditions that the model should have, and secures objectivity and predictability of the u-City service model through confirmation on propriety, implementation and effectiveness, etc.

A Site Application verification of technology and Equipment for Construction Application of Construction CALS System (건설 CALS 시스템 건설공사 활용을 위한 요소기술 및 장비의 현장 적용성 검증)

  • Choi, Sang-Yong;Shin, Tae-Hong;Kim, Byung-Kon;Kim, Tea-Hak;Kwon, Soon-Wook;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.767-771
    • /
    • 2008
  • From industrial field spearhead IT and new create an added value and market with fusion of traditional industry composition researches actively to be in the process of advancing. The application possibility of high-tech IT technique is coming to be high in construction industry. Currently, the user requirements that upgrade existing system to high-tech construction project information system combined construction CALS system applying in road/river business management service with high-tech IT such as ubiquitous and mobile techniques are increasing. Therefore, the objective of this study is to verify site application of RFID and mobile equipment for applying in high-tech field with ubiquitous and mobile techniques so that construction CALS system gets advanced increasingly.

  • PDF

Verification and Application of Velocity Measurement Using Price Meter and ADCP (회전식유속계와 ADCP를 이용한 유속측정의 검증 및 적용)

  • Kim, Eung-Seok;Choi, Hyun-Il
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.3
    • /
    • pp.101-106
    • /
    • 2009
  • Although ADCP(Acoustic Doppler Current Profiler) have been introduced and utilized for flow measurements since the end of 1990's, in-situ behavior performance of ADCP at stream gauging stations has not been evaluated in Korea. The purpose of this study is for verification and application of velocity measurements using a price meter and ADCP. The verification of measured velocities was carried out in a laboratory open-channel. The differences between the two velocity values measured by a pirce meter and ADCP are within 2.1%, which means that ADCP can be used at stream gauging stations. After verification, ADCP was applied to the Maekok stream selected as a test site for application. for application. The test application was performed by comparison of velocity results measured by ADCP and a price meter. Results show that the velocity values obtained by using ADCP coincide well with those by using conventional devices with the average measurement discrepancy of 10.5%.

Productivity Analysis of the Site Installation Stage of Laminated Modular Multi-Family Housing (적층식 모듈러 공동주택 현장설치 단계의 생산성 분석)

  • Park, Moon-Sun;Kim, Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.5
    • /
    • pp.519-527
    • /
    • 2019
  • This study was conducted to present useful information on the utilization and productivity analysis of laminated modular multi-family housing. To this end, the process of site installation was investigated and analyzed through a prior study, and the monitoring survey was conducted through the site installation case of an stacked multi-family housing. Based on the above, the results of productivity analysis using the web-cyclone technique were also presented. However, the site installation process has limitations on generalisation because the process is not the same for each construction company, and also limits that require verification through application in the actual site of the web-cyclone model presented in this study.

Fitness-for-Service Assessment for Instrument Valve Material by Tensile Test for Verification (계기용 밸브 재질의 검증 인장시험에 의한 사용적합성 평가)

  • In Hwan Shin;Chi Yong Park
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.17 no.1
    • /
    • pp.49-55
    • /
    • 2021
  • In this paper, an application example for fitness-for-service of material is shown. A kind of instrument valve is made of austenitic stainless steel fabricated by the cold working process. The tensile strength of the cold worked austenitic stainless steel has to be limited under 90 ksi to prevent the stress corrosion cracking in power plants. In industrial fields, tensile strengths of some materials were discovered to be over the regulation requirements in a certified material test report (CMTR). Owner's verification tests were performed to compare with that in a CMTR and to check the appropriateness. It is found that, in the case of verification test under the required test speed, valve materials could be used in the field. Although it is only one application sample of material check process in the power generation site, this case study could show an importance of basic experimental technology in academia and research circles.

A study on the application of agile method to resolve electric system issues in the performance improvement of aged aircraft in the phase of mass production (양산 단계 노후 항공기 성능 개량에서 전기계통 이슈 해결을 위한 애자일 기법 적용연구)

  • In-Bok, Yoon;Kyeong-Soo, An
    • Journal of IKEEE
    • /
    • v.26 no.4
    • /
    • pp.560-567
    • /
    • 2022
  • This paper proposed an application of agile management method to resolve the electrical system issues identified during the mass production phase of aged aircraft performance improvement. The proposed method was applied from issue analysis to on-site verification and testing stage, before the formal configuration control process. At this time, the project was carried out by setting a sprint period to complete the verification according to requirements through daily scrum and sprint review. As a result, It was verified that the wiring installation of the aircraft, which was the output of the sprint, met requirements within the defined sprint period.