Kim, Doo-Gyum;Kim, Min-Seok;Kim, Min-Kyu;Lee, Jong-Woo
Proceedings of the KSR Conference
/
2011.10a
/
pp.211-225
/
2011
Railroad signalling systems are to control intervals and routes of trains. There are ATS(Automatic Train Stop), ATP(Automatic Train Protection), ATO(Automatic Train Operation) and ATC(Automatic Train Control) system. Trains are operated in the section which is met on the signalling system because various signalling systems are used in Korea. On the other words, trains are not operated in the section which is used in the other signalling system. To solve this problem, recently combined on-board system has been developed. The combined on-board system is designed by doubling the ATS, ATP and ATC system. Information signal is received by magnetic sensors in the ATC system and is received by antennas in the ATS and ATP system. Therefore, it is possible to arise transmission problems by magnetic coupling. In this paper, electric model of the ATS and ATP antenna is suggested and interference frequency by the magnetic coupling between the ATS and ATP antenna is estimated numerically. As a results of the magnetic coupling, the value of the magnetic coupling is presented without magnetic induction.
The TVM 430 system manufactured by Ansaldo STS in France is currently used in ground signalling system for Kyungbu HSR. It transmits the speed information to the on-board signalling system in the form of continuous signal via the track, and the rolling stock in Kyungbu HSR runs with 300km/h max. operating speed by using the corresponding information. Looking from the recent international trends in HSR, reducing the travelling time and increasing of the line capacity is promoting via the improvement of train speed. In case of TGV Est, they are realizing the normal operation with 320km/h max. operating speed by using TVM SEI signalling system, which is similar to TVM 430. Furthermore, in case Honam HSL, which is under construction, is looking over faster speed than the limited one of Kyungbu HSR(i.e. over 300km/h). In this paper, it is assumed that the existing TVM 430 ground signalling system is used and train speed is improved, therefore the number of block section to be increased depending on the increase of train speed and the standard speed to be used in this case is drawn via the simulation of the train model and described the method accordingly.
Tylosin biosynthesis is controlled in cascade fashion by multiple transcriptional regulators, acting positively or negatively, in conjunction with a signalling ligand that acts as a classical inducer. The roles of regulatory gene products have been characterized by a combination of gene expression analysis and fermentation studies, using engineered strains of S. fradiae in which specific genes were inactivated or overexpressed. Among various novel features of the regulatory model, involvement of the signalling ligand is not essential for tylosin biosynthesis.
The Transactions of the Korea Information Processing Society
/
v.7
no.9
/
pp.2948-2957
/
2000
A broadband access network in B- ISDN subscriber network, plays a role of concentration or multiplexing of various subscribers into a service node. To establish an end-to-end ATM connection, interworking functions between \'B5.2 interface's connection protocol and the signalling protocol, are perfonned at the service node. A sequential interworking model and a parallel interworking model were proposed for these interworking functions. The sequential interworking model proceeds the signalling protocol of network node after the response of VB5.2 interface protocol. On the other hand, the parallel interworking model proceeds the signalling protocol and the VB5.2 interface protocol simultaneously. In this paper, we analyze and simulate above two interworking models in tenns of a connection setup delay and completion ratio, when call requests with eBR and VBR transfer capability arrive at the service node. We observed that the completion ratios of the two interworking models are quite closed. However the connection setup delay of parallel interworking model is improved by about 33% compared with that of the sequential interworking model.
Saba, Evelyn;Lee, Yuan Yee;Kim, Min Ki;Kim, Seung-Hyung;Hong, Seung-Bok;Rhee, Man Hee
Journal of Ginseng Research
/
v.42
no.4
/
pp.577-584
/
2018
Background: Ginseng (Panax ginseng) is a widely used traditional herbal supplement that possesses various health-enhancing efficacies. Various ginseng products are available in market, especially in the Korean peninsula, in the form of drinks, tablets, and capsules. The different ginseng types include the traditional red ginseng extract (RGE), white ginseng, and black red ginseng extract (BRGE). Their fermented and enzyme-treated products are also available. Different treatment regimens alter the bioavailability of certain compounds present in the respective ginseng extracts. Therefore, in this study, we aimed to compare the antioxidant and immune-stimulating activities of RGE, BRGE, and fermented red ginseng extract (FRGE). Methods: We used an acetaminophen-induced oxidative stress model for investigating the reduction of oxidative stress by RGE, BRGE, and FRGE in Sprague Dawley rats. A cyclophosphamide-induced immunosuppression model was used to evaluate the immune-stimulating activities of these ginseng extracts in BALB/c mice. Results: Our results showed that most prominently, RGE (in almost all experiments) exhibited excellent antioxidant effects via increasing superoxide dismutase, catalase, and glutathione peroxidase activities in the liver and decreasing serum 8-hydroxy-2'-deoxyguanosine, aspartate aminotransferase, and lactate dehydrogenase levels compared with the groups treated with FRGE and BRGE. Moreover, RGE significantly increased the number of white blood cells, especially T and B lymphocytes, and antibody-forming cells in the spleen and thymus, and it also activated a number of immune cell subtypes. Conclusion: Taken together, these results indicate that RGE is the best supplement for consumption in everyday life for overall health-enhancing properties.
A broadband access network in B-ISDN subscriber network, plays a role of concentration or multiplexing of various subscribers into a service node. For call and connection control functions, DSS2 and B-ISUP signalling protocols are standardized for each of a subscriber side and a network node. B-BCC and B-ANCC protocol were proposed for VB5.2 interface. This interface allows dynamic control of ATM connections at the broadband access network. To establish an end-to-end ATM connection, interworking functions between VB5.2 interface's connection control protocol and the signalling protocol, are performed at the service node. A sequential interworking model and a parallel interworking model were proposed for these interworking functions. The sequential interworking model recommended by ITU-T causes an overall connection setup delay by introducing the access network, because this model proceeds the signalling protocol of network node after the response of VB5.2 interface protocol. On the other hand, the parallel interworking model proceeds the signalling protocol and the VB5.2 interface protocol simultaneously. The simultaneity of the parallel interworking model minimizes the overall connection setup delay. In this paper, we analyze and simulate above two interworking models with B-BCC or B-ANCC protocol in terms of a connection setup delay and completion ratio.
The basic user location strategies proposed in current PCS(Personal Communication Services) Network are two-level Database strategies. These Databases which exist in the Signalling network always maintain user's current location information, and it is used in call setup process to a mobile user. As the number of PCS users are increasing, this strategies yield some problem such as concentrating signalling traffic on the Database, increasing Call setup Delay, and so on. In this paper, we proposed RCP(Reverse Connection setup Protocol) model, which apply RVC(Reverse Virtual Call setup) algorithm to PCS reference model, and CRCP(Cache algorithm in RCP) model, which adopt Caching strategies in the RCP model. When Cache-miss occur, we found that CRCP model require less miss-penalty than PCS model. Also we show that proposed models are always likely to yield better performance in terms of reduced Location Tracking Delay time.
Journal of the Korean Institute of Telematics and Electronics B
/
v.28B
no.7
/
pp.535-539
/
1991
In this paper, message time delay is considered in the SCCP(Signalling Connection Control Part) of the CCITT common channel signalling system No.7. In this simulation, the protocol of the SCCP is programmed using C language and this program is considered on condiion of only connectionless mode and class 0. This simulation reveals bottleneck point depending on message processing capability in the SCCP, so this simulation shows the low limit of the SCCP's processing capability. We show that bottleneck point is at 2000[ messages/sec ] on model A and at 3500[ message/sec ] in model C.
Journal of the Korean Institute of Telematics and Electronics A
/
v.33A
no.10
/
pp.48-60
/
1996
This paper focuses on the necessities of interworking and dervation of the requirements of interworking system for interworking between 64 Kbps based N-ISDN (narrowband ISDN) and B-ISDN(broadband ISDN). Furthermore, the design and the implementation of IWF (interworking function) are presentd. We analyze two ISDN signalling systems, and propose the architecture of interworking system. And then we make the baisc call procedure model between N-ISDN and B-ISDN, and verify the dynamic behaviors through the reachability tree of petri net. IWF is designed and implemented for transforming the differences between the two signalling systems. The operational confirmity of th eimplemented program was confirmed by the local test method. The performance of IWF was evaluated throguh the simulation language SLAM-II. As the result of evaluation shows, we confirm that the processing delay is maintained within 3 ms under the utilization 0.9.
The national subway went under construction in 1971, and after three years of endeavor, Seoul subway line number one opened for traffic in 1974. Line number two went under construction in 1978 and it opened for traffic in 1984. With the use of safety operation for more than 20 years, the life cycle nearly came to an end. Therefore the improvements for the safety operation are unavoidable. The total system should not be affected when the new and conventional systems are overlapped, the system operation is in the initial stage, and it confronts the situation of abnormal operation. However, there is a total lack of experience in construction and improvement for the trains that are in the use of large transport and density headway. In this paper, we propose an improvement method of the subway signalling system using ATO (Automatic Train Operation control scheme) to which the latest Digital ATC is applied, and examine the first application model of ATO system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.