조선시대 화성성역의 공정관리 사례분석 (A Case Analysis on the Time Management of the HwaSung Construction Project in Choseon Dynasty)

  • 김균태
    • 한국건축시공학회지
    • /
    • 제8권6호
    • /
    • pp.139-145
    • /
    • 2008
  • The objective of this paper is to analyze the construction management capacity of Choseon Dynasty and suggest a new interpretation on the construction capacity of the time management by reviewing the time management case during a representative construction project, HwaSungk construction project implemented in the latter period of Choseon Dynasty around 200 years ago. which was described in HwaSungSungYoukEuGye. The analysis results of the time management capacity during the latter period of Choseon Dynasty depicted in the HwaSungSungYoukEuGye is summarized as follows: (1) It took 2 years and 6 months to complete the Hwasung construction project. However, all of the single buildings were constructed within 6 months, a relatively short period of time. Judging from the fact, it can be assumed that the construction techniques using wood of the time were very sophisticated. (2) When the HwaSung was constructed, it took a relatively short period of time to complete works from placing the foundation to erecting columns and to placing a crossbeam on the columns. Based on the fact, it can be also inferred that assembly processing techniques of the time were also sophisticated and the level of member processing and assembling techniques of the time was considerably good as well. (3) The HwaSung construction was continued throughout the year without any influence by weather conditions, which tells us that division of labor by work was performed, and it was possible to mobilize labor force for the construction project even during the busy farming seasons.

보현산천문대 단주기변광성 탐사(SPVS)연구 (SHORT-PERIOD VARIABILITY SURVEY (SPVS) IN BOAO)

  • 전영범;김승리;박윤호;박병곤;이충욱;이은정;김민수;이경훈
    • 천문학논총
    • /
    • 제20권1호
    • /
    • pp.21-27
    • /
    • 2005
  • We have been performing a wide-field photometric monitoring program, named SPVS (Short-Period Variability Survey), at the Bohyunsan Optical Astronomy Observatory (BOAO). The observation system consists of a small refracting telescope (D = 155 mm, f = 1050 mm) and a $2k{\times}3k$ CCD Camera. The field of view is $1.0^{\circ}{\times}1.5^{\circ}$. Detection limit is about V = 13 for short-period small amplitude variables such as ${\delta}$ Scuti-type pulsating stars, and about V = 15 for long-period large amplitude variables such as eclipsing binaries and RR Lyrae stars. The instrument is designed to be remote-controlled through internet. The primary purpose of this project is to search for variable objects in bright Galactic open clusters. We present results of test observations conducted towards NGC 7092.

클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형 (Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model)

  • 김종열;강창욱;황인극
    • 산업경영시스템학회지
    • /
    • 제34권3호
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

울산지역 어항개발의 경제성 평가 - 정자항을중심으로 - (Benefit-Cost Analysis for Developing Jeongja Port in Ulsan)

  • 김태용
    • 수산경영론집
    • /
    • 제39권1호
    • /
    • pp.63-85
    • /
    • 2008
  • The objective of this study is to review the methodology of economic analysis of fishing ports by examining the economical feasibilities of a national fishing port (Jeongja Port) in Ulsan. This study utilized market value evaluation method to measure the benefits and costs related to the development of ports. The benefit variables are income effects resulting from the developments while the cost variables are sum of construction costs and maintenance costs. The income effects are measured in two ways: (1) income from individual project resulting from the developments, (2) the income effects by utilizing investment multipliers. The results shows that the BC ratio (Benefits/Costs) of Jeongja port by using (1) income from individual project resulting from the developments was 1.07 while the BC ratio by using (2) the income effects by utilizing investment multipliers was 1.10 due to a relative short period of useful life for investment multipliers. However, the income variable utilizing investment multipliers is more sensitive to the period of duration than the income variable from individual project.

  • PDF

훼손된 도시생태계 생태복원 평가지표 제시 및 복원성과 분석 (Evaluation indicators for the restoration of degraded urban ecosystems and the analysis of restoration performance)

  • 손희정;김도희;김나영;홍진표;송영근
    • 한국환경복원기술학회지
    • /
    • 제22권6호
    • /
    • pp.97-114
    • /
    • 2019
  • This study aims to analyze the effect of urban ecosystem restoration projects by evaluating the short-term restoration performance of the project sites, from both qualitative and quantitative evaluations. In this study, for the qualitative evaluation, we derived the evaluation frame from previous studies and literature. For the quantitative evaluation, the changes in ecological connectivity after the restoration project were described using landscape permeability and network analysis. In addition, changes in habitat quality after the restoration project were evaluated by using InVEST Habitat Quality Model. These evaluations were applied to the three natural madang (ecological restoration) projects and two ecosystem conservation cooperation projects. As a result, three categories, 10 indicators, and 13 sub-indicators were derived from literature as the evaluation frame for this study. In the case of quantitative evaluation of restoration performance, habitat quality increased by 45% and ecological connectivity by 37% in natural-madang, and habitat quality by about 12% and ecological connectivity by about 19% in ecosystem conservation cooperation projects. This implies that the ecological restoration project can increase the ecological connectivity and the habitat quality of degraded sites even in a short period of time by improving the land-cover and land use. The results by applying the evaluation frame indicated that ecological and environmental factors and the ecological functions were improved by the restoration works, even though the magnitude of performances were diverse depending on the specific evaluation items, project type, and site characteristics. This study clarified that the success of ecological restoration project should be assessed by both of the short-term and long-term goals, which can be achieved by the maintenance and sustainable management, respectively.

A Study on Change in Perception of Community Service and Demand Prediction based on Big Data

  • Chun-Ok, Jang
    • International Journal of Advanced Culture Technology
    • /
    • 제10권4호
    • /
    • pp.230-237
    • /
    • 2022
  • The Community Social Service Investment project started as a state subsidy project in 2007 and has grown very rapidly in quantitative terms in a short period of time. It is a bottom-up project that discovers the welfare needs of people and plans and provides services suitable for them. The purpose of this study is to analyze using big data to determine the social response to local community service investment projects. For this, data was collected and analyzed by crawling with a specific keyword of community service investment project on Google and Naver sites. As for the analysis contents, monthly search volume, related keywords, monthly search volume, search rate by age, and gender search rate were conducted. As a result, 10 items were found as related keywords in Google, and 3 items were found in Naver. The overall results of Google and Naver sites were slightly different, but they increased and decreased at almost the same time. Therefore, it can be seen that the community service investment project continues to attract users' interest.

플랜트 건설현장의 작업반장 역할개선을 통한 위험율 저감방안 연구 (A study on hazard rate decrease plan in plant construction site by improving foreman's role)

  • 은남권;김창은
    • 대한안전경영과학회지
    • /
    • 제17권3호
    • /
    • pp.33-44
    • /
    • 2015
  • Domestic plant construction sites have a tendency to become bigger, more various and complicated. Moreover frequency of industrial incident is increasing due to short project period, coexistence work condition and using heavy construction equipment. Installing safety facilities and safety training contribute to prevent incident. But mostly incident happens due to workers' unsafe action and wrong work method. Technically, it is very difficult for us to closely manage workers preventing incident. Therefore, the role of foreman who ordinarily works together with his workers is considered more important. Specific execution plan was drawn through industrial incident statistics from Ministry of Labor and questionnaire survey to interest parties(supervisor, safety staff and foreman). If foreman has raised sense of belonging and responsibility by conducting practical safety training for his workers, manages job site and receives proper compensation for these roles, it will be expected that it fully influences incident decrease.

교통량 위험을 고려한 도로 민간투자사업 적정 관리운영기간 산정 모형 개발 (Development of Model for Optimal Concession Period in PPPs Considering Traffic Risk)

  • 구석모;이승재
    • 대한교통학회지
    • /
    • 제34권5호
    • /
    • pp.421-436
    • /
    • 2016
  • 민간투자사업은 많은 프로젝트 개발 비용이 투입되며, 관리운영기간 동안의 미래 수입을 통하여 투자비를 회수하는 구조로 추진된다. 일반적으로 긴 관리운영기간은 민간사업자의 더 많은 수입을 가져가게 하고 짧은 관리운영기간은 민간사업자의 수입회수 기간이 짧아져 더 적은 수입을 가져가게 된다. 관리운영기간의 설정은 민간투자사업의 중요 요인임에도 불구하고 전통적으로 정부가 사전에 결정하거나 민간이 제안한 기간으로 결정되고 있다. 특히 교통분야 사업에서 관리운영기간의 설정은 정확한 교통량 예측이 전제되어야 하나, 교통량 예측은 실제 교통량과 차이가 발생하는 등 위험 및 불확실성이 뒤따른다. 따라서 정부 및 민간사업자는 관리운영기간 설정시 교통량 예측 위험을 고려할 필요가 있다. 본 연구는 도로사업에 있어 교통량 위험을 고려한 적정 관리운영기간을 설정하는 모형을 제시하였다. 이를 위해 몬테카를로 시뮬레이션 기법을 적용하였으며, 시뮬레이션 과정에서 교통량 위험은 확률 분포(single probability distribution)와 확률 과정(stochastic process)을 함께 고려하였다. 본 연구에서 제시한 방법론 및 시뮬레이션 모형을 바탕으로 모의 분석을 수행하였다. 모의 분석 결과 기대수익률 7%인 경우, 평균 관리운영기간은 21.2년으로 산정되었으며, 정부의 할인율 5.5%를 적용한 경우 관리운영기간은 평균 17.2년으로 산정되었다. 그 밖에 도출된 통계량은 다각적인 해석을 통해 민간투자사업 관련 의사결정자들이 관리운영기간을 설정함에 있어 직관에 의존하거나 동일한 운영기간을 적용하기보다는 객관적이고 합리적인 관리운영기간 설정하도록 도움을 줄 것으로 기대된다.

PMO 기능 도입유형에 따른 프로젝트 성과의 영향 연구 : ICT 산업을 중심으로 (A Study on the Impact of Project Performance According to the Implementation type of PMO Function : Focus on Information and Communication Technology Industry)

  • 이무건;김승철;부제만
    • 한국IT서비스학회지
    • /
    • 제16권2호
    • /
    • pp.61-83
    • /
    • 2017
  • It is well known that PMO (Project Management Office)s are effective for successful project performance. Since it takes a long time to develop PMO capability, many public organizations and companies that do not have internal PMOs are increasingly relying on outsourcing of PMO functions in order to introduce mature PMO capabilities in a short period of time. However, it is not verified yet whether outsourced PMO is more effective than internal PMO or not. The objective of this study is to verify the effectiveness of PMO outsourcing. There are many different definitions about PMO function, and even the same PMO function may have different effectiveness depending on the Industry. Thus, this study redefined the PMO functions and Project Performance based on the past studies, and conducted research by focusing on the ICT (Information and Communication Technology) industry. The ICT industry is an important industry economically and has been attracting global attention recently. This study is the first attempt to prove the effectiveness of outsourcing of PMO function in Korea. We found that PMO function outsourcing is effective for certain aspects of project performance, particularly technical support and infrastructure management. Overall, PMO outsourcing is usually more effective than internal PMO for improving project performance. The results of this study are expected to contribute to the development of PMO theories and practices.

공동주택 리모델링공사 표준공기 설정에 관한 연구 (A Study on Estimating Normal Project Duration of Apartment Remodeling Project)

  • 윤종식;유일한
    • 한국건설관리학회논문집
    • /
    • 제18권2호
    • /
    • pp.12-20
    • /
    • 2017
  • 리모델링을 선호하는 가장 큰 이유는 조합 구성 후 8~9년이 소요되는 재건축에 비해 상대적으로 짧은 사업기간(5~6년)에 있다고 할 수 있다. 그 외에도 입주민의 이주 시 임시거주를 위한 전세기간이 통상 24개월이라는 점을 감안할 때 공기단축의 필요성은 더욱 커진다. 또한 기존 증축형 리모델링공사의 기간이 평균적으로 28~35개월로 예측되기 때문에 전세 24개월이라는 공사기간을 만회하기 위한 전략과 노력이 필요하다. 이에 본 연구는 리모델링공사의 사업기간을 개략적으로 판단할 수 있는 리모델링 표준공기 산정모델을 개발하였다. 신축공사 표준공기를 토대로 리모델링공사와의 차이점 분석을 통해 리모델링 특성에 맞는 표준공기(안)을 개발하였다. 리모델링공사에서 새롭게 정의해야 할 표준공기 기준은 철거공사에 따른 공기변화, 보강공사에 따른 공기변화, 증축공사에 따른 공기변화로 크게 3공종으로 구분된다. 작성된 표준공기(안)에 대하여 사례연구와 전문가 인터뷰를 통해 적정성에 대해 검증하였다. 본 논문에서 개발한 리모델링공사 표준공기는 설계 대안별로 개략공기를 산출할 수 있는 기준이 될 것이며 리모델링 사업주체들간 전략적 의사결정에 도움이 될 수 있을 것이다.