• Title/Summary/Keyword: Ship Operator

Search Result 155, Processing Time 0.027 seconds

A Study on the Evaluation of Berthing Energy of Large-Sized Container Ships with the effect of Shallow Waters (대형 컨테이너선의 천수역 영향을 고려한 접안에너지 산출에 관한 연구)

  • Kim Chol-Seong;Lee Yun-Sok;Lee Chung-Ro;Cho Ik-Soon
    • Journal of Navigation and Port Research
    • /
    • v.29 no.8 s.104
    • /
    • pp.673-678
    • /
    • 2005
  • In order to improve the safety of ship berthing and the efficiency of berth operation in the harbour, the berthing energy acting on a ship in berthing maneuver need to be estimated properly. The berthing energy is used as one of the criteria to determine the maximum permissible load q{ fender as well as important factors to establish the berthing speed and the required power of tug-boat for pilot and ship operator. Some problems of berthing energy are discussed on the basis of the hydrodynamic aspects. Then, series calculations of berthing energy are carried out considering the effect of water depth on added mass and the ship shape for container series from 1,600TEU to 12,000TEU.

Serviceability Assessment of Corroded Subsea Crude Oil Pipelines (부식된 해저 원유 파이프라인의 사용적합성 평가)

  • Cui, Yushi;Kim, Dong Woo;Seo, Jung Kwan;Ha, Yeon Chul;Kim, Bong Ju;Paik, Jeom Kee
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.52 no.2
    • /
    • pp.153-160
    • /
    • 2015
  • Pipelines are one of the most important structures in subsea equipment. It is the main equipment for transportation of crude oil and natural gas to the downstream facilities. Crude oil and natural gas leak will be carry out not only political and financial issues but also pollution to the environment. Inaccurate predictions of corrosion behavior will make hazardous consequences. The serviceability assessment of corroded structures is essential especially for subsea pipelines. As corrosion is concerned, the effects of failure due to significant reduction will make it hard to the pipeline operator to maintain the serviceability of pipelines. In this paper, the serviceability assessment of corroded crude oil pipeline is performed using the industry design code (Shell92, DNV RP F101, ASME B31G, BS 7910, PCORRC) and FEA depending on corrosion area. In last step, the future integrity of the subsea crude oil pipeline is assessed to predict the remaining year in service of crude oil pipelines.

A Study on the Web Application for Sailing Ship Location Information interface based by RIA (RIA기반의 선박항해정보를 위한 웹 애플리케이션 구축 "평택항 원양어선 항해정보현황 사례를 중심으로")

  • Jung, Hoe-Jun;Park, Dea-Woo;Han, Kyung-Don
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.10a
    • /
    • pp.613-616
    • /
    • 2009
  • Information present condition is using situation board by manual processing that is consisted of ship arrangement plan and letterpress and magnet etc. in Pyeongtaekhang's deep-sea fishing vessel company. Study that mark open sea far from land ship information of underway 37 ships that is accepted in every time in internet web application environment that is based on Ubiquitous Network in PC that is linked to internet. 3 through practical use of RIA of Flash technology base compose Digital Dash-Board in width grid structure only and do ship sailing addition that is operating in 6 oceans and latitude, hardness indication as well as various informations to do visual display do. Emphasized in dynamic Web Application construction because can heighten the convenience to operator and user, and take advantage of real time data.

  • PDF

Study on Screening Examination of Small Boat Operator's Certificate of Competency (소형선박조종사 면허시험 전형제도에 관한 연구)

  • KIM, Wook-Sung;KIM, Yong-Bok;KIM, Jong-Hwa;KIM, Sung-Ki;KIM, Seok-Jae;PARK, Tae-Geon;RYU, Kyong-Jin;LEE, Yoo-Won
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.27 no.6
    • /
    • pp.1523-1531
    • /
    • 2015
  • Small boat operator's certificate of competency took up 39.0% of total license holders and required for at least 19,000 boats in 2013, was proposed the improvement items by reviewing the acts and criteria related to the current test and analyzed the questions of set at examinations. About 31% of questions of the current written test are unsuitable for the target boat and operational knowledge of the operator. It is appropriate that the subject categorization criteria and contents of the subjects will be improved to include practical details related to safe ship operation, and the number of questions increased according to each subject category in amended examination after January 1st, 2017. The interview test should be improved so that the questions can be forwarded in a clear manner through formulation of practical problems, photos, etc. considering the real situations such as high age/low education status of testee and it is necessary to lengthen the interview time per testee. The test and interview personnel should consist of a human resource pool with experience in small boat operator training and workers of related areas familiar with field terminology. Furthermore, the test should be divided into small boats of 2 to 5 tons and those exceeding 5 tons according to the tonnage of small boats.

A Study on the Route Operation & Safety Improvement in Gwangyang Traffic Safety Designated Area Based on ES Model (ES모델을 통한 광양항 교통안전특정해역의 항로운영과 안전성 향상에 관한 연구)

  • Kim, Deug-Bong;Park, Young-Soo
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.22 no.2
    • /
    • pp.153-159
    • /
    • 2016
  • Gwangyang traffic safety designated area is composed of 3 fairways (Deep water fairway, inbound fairway, and outbound fairway). However, inbound vessels can't use this passage because of Samyeo rock and artificial fishing banks in inbound route. The problem with the rocks and artificial fishing banks has been raised by ship navigators and authorities of the port. This research is about the safety evaluation and management plan of the passage, and we conducted maritime traffic simulation using a model based on a ship operator risks. As a result, assuming that future marine traffic volume is the same as the present, and if the ship operators use 3 fairways and not two, it showed risk reduction of 46.4 % (vessels over 50,000 DWT using DW route) and 57.1 % (vessels over 10,000 DWT using DW route). Also, in a traffic volume condition which is the same as the present, to induce vessels over 50,000 DWT to use DW route is effective in mitigating of risks. Meanwhile, in a condition which increased the traffic volume by 150 %, it is more effective to induce vessels to use DW route. This research is the result of analysis using the model based on ship operator risks, and not cost-effectiveness analysis on the removal of Samyeo rock and artifical fishing banks. This research is expected to be used on setting up the sea route and management plan (particularly, restriction on passing DW route).

Speed-Power Performance Analysis of an Existing 8,600 TEU Container Ship using SPA(Ship Performance Analysis) Program and Discussion on Wind-Resistance Coefficients

  • Shin, Myung-Soo;Ki, Min Suk;Park, Beom Jin;Lee, Gyeong Joong;Lee, Yeong Yeon;Kim, Yeongseon;Lee, Sang Bong
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.5
    • /
    • pp.294-303
    • /
    • 2020
  • This study discusses data collection, calculation of wind and wave-induced resistance, and speed-power analysis of an 8,600 TEU container ship. Data acquisition system of the ship operator was improved to obtain the data necessary for the analysis, which was accomplished using SPA (Ship Performance Analysis, Park et al., 2019) in conformation with ISO15016:2015. From a previous operation profile of the container, the standard operating conditions of mean draft were 12.5 m and 13.6 m, which were defined with the mean stowage configuration of each condition. Model tests, including the load-variation test, were conducted to validate new ship performance and for the speed-power analysis. The major part of the added resistance of container ship is due to the wind. To check the reliability of wind-resistance calculation results, the resistance coefficients, added resistance, and speed-power analysis results using the Fujiwara regression formula (ISO15016:2015) and Computational fluid dynamics (Ryu et al., 2016; Jeon et al., 2017) analysis were compared. Wind speed and direction measured using an anemometer were used for wind-resistance calculation and the wave resistance was calculated using the wave-height and direction-data from weather information. Also, measured water temperature was used to calculate the increase in resistance owing to the deviation in water density. As a result, the SPA analysis using measured data and weather information was proved to be valid and able to identify the ship's resistance propulsion performance. Even with little difference in the air-resistance coefficient value, both methods provide sufficient accuracy for speed-power analysis. The differences were unnoticeable when the speed-power analysis results using each method were compared. Also, speed-power analysis results of the 8,600 TEU container ship in two draft conditions show acceptable trends when compared with the model test results and are also able to show power increase owing to hull fouling and aging. Thus, results of speed-power analysis of the existing 8,600 TEU container ship using the SPA program appropriately exhibit the characteristics of speed-power performance in deal conditions.

A Study of Reliability Analysis and Application on Naval Combat System Using Field Critical Failure Data (야전 치명고장자료를 이용한 함정전투체계 신뢰성 분석 및 활용 방안)

  • Kim, Young-Jin;Oh, Hyun-Seung;Choi, Bong-Wan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.49-59
    • /
    • 2016
  • Naval combat system developed in-country is progressing at an alarming rate since 2000. ROK navy will be achieved all vessels that have combat system in the near future. The importance of System Engineering and Integrated Logistics Support based on reliability analysis is increasing. However, reliability analysis that everyone trusted and recognized is not enough and applied practically for development of Defense Acquisition Program. In particular, Existing Reliability Analysis is focusing on reliability index (Mean Time Between Failure (MTBF) etc.) for policy decision of defense improvement project. Most of the weapon system acquisition process applying in the exponential distribution simply persist unreality due to memoryless property. Critical failures are more important than simple faults to ship's operator. There are no confirmed cases of reliability analysis involved with critical failure that naval ship scheduler and operator concerned sensitively. Therefore, this study is focusing on Mean Time To Critical Failure (MTTCF), reliability on specific time and Operational Readiness Float (ORF) requirements related to critical failure of Patrol Killer Guided missile (PKG) combat system that is beginning of naval combat system developed in-country. Methods of analysis is applied parametric and non-parametric statistical techniques. It is compared to the estimates and proposed applications. The result of study shows that parametric and non-parametric estimators should be applied differently depending on purpose of utilization based on test of normality. For the first time, this study is offering Reliability of ROK Naval combat system to stakeholders involved with defense improvement project. Decision makers of defense improvement project have to active support and effort in this area for improvement of System Engineering.

A Basic Study on Development of VTS Control Guideline by Collision Risk model based on Ship's Operator's Consciousness (선박운항자 의식 기반 충돌 위험도 모델을 이용한 관제 가이드 라인 개발에 관한 기초 연구)

  • Park, Sang-Won;Park, Young-Soo
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2015.10a
    • /
    • pp.20-23
    • /
    • 2015
  • In ports of Korea, the marine traffic flow is congested due to a large number of vessels coming in and going out. In order to improve the safety and efficiency of these vessels, South Korea is operating with a Vessel Traffic System, which is monitoring its waters 24-7. However despite these efforts of the VTS (Vessel Traffic System) officers, marine accidents are occurring in their assigned districts. VTS Officers are controlling subjectively based on their experience due to no VTS guideline. On this paper, we listened to Busan VHF channel for 3days and applied to collision risk model. With collision risk model, We deducted a moment which advise or recommend to vessel in encounter situation, VTSO's career, day&night.. We suggested a collision risk value as guide line of VTSO's control time.

  • PDF

A Basic Study on Development of VTS Control Guideline based on Ship's Operator's Consciousness (선박운항자 의식 기반 적정 관제시기 분석에 관한 기초 연구)

  • Park, Sang-Won;Park, Young-Soo
    • Journal of Navigation and Port Research
    • /
    • v.40 no.3
    • /
    • pp.105-111
    • /
    • 2016
  • In ports of Korea, the marine traffic flow is congested due to a large number of vessels coming in and going out. In order to improve the safety and efficiency of these vesse's movement, South Korea is operating with a Vessel Traffic System, which is monitoring its flow 24-7. However despite these efforts of the VTS (Vessel Traffic System) officers, marine accidents are occurring continuously in their control area. VTS Officers are controlling subjectively based on their experience due to no VTS control guideline of dangerous situation among vessels. On this paper, we listened to Busan VHF channel for 3days and analyzed the message. With collision risk model, We analyzed a moment of risk which officers advise or recommend to vessel in encounter situation, VTSO's career, and day&night.

A Simulation-Based Capacity Analysis of a Block-Assembly Process in Ship Production Planning (시뮬레이션을 이용한 블록조립 공정 능력 분석)

  • Song, Young-Joo;Lee, Dong-Kun;Choe, Sung-Won;Woo, Jong-Hun;Shin, Jong-Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.1
    • /
    • pp.78-86
    • /
    • 2009
  • A capacity calculation and process analysis is a very important part for the entire ship production planning. Ship's production plan is set up with a concept that the product is produced based on the capacity achievable by the processes while general manufacturing sets up the production plan based on product lead-time. Therefore, in case the calculation of capacity for each process of shipbuilding yard is different from actual conditions, a series of production plan - ship table composition, dual schedule plan and execution schedule plan, etc - may accumulate errors, lose reliability of planning information and cause heavy cost deficit in this course. In particular, in case of new shipbuilding yard, stocks between processes are built up and half blocks are not supplied in timely manner, and that is sometimes due to the clumsiness of the operator but it is more often because of the capacity to execute each process is not logically calculated. Therefore, this paper presents the process to calculate the assembly leadtime and assembly process capacity for shipbuilding yard assembly factory. This paper calculated the block type for calculation of assembly lead time based on block DAP(detailed assembly procedure), and introduced cases that calculate production capacities by assembly surface plate by considering the surface plate occupied area of the blocks that change depending on assembly field area and assembly processes through assembly simulation.