• 제목/요약/키워드: Shield tunneling

검색결과 68건 처리시간 0.022초

실드테일보이드에 의해 발생하는 지표구조물의 침하 억제를 위한 마이크로파일의 적용 (An Application of Micropile to Restrain the Settlement of Structure on the Ground Surface caused by Shield Tail Void)

  • 임종철;윤이환;박이근;고호성
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.177-184
    • /
    • 1999
  • In soft ground tunneling, shield method is very good for safety of neighboring structures. Although shield tunnel method has the merits to minimize the deformation of ground around tunnel, ground deformations occurred until the material grouted in tail void hardens are inevitable. In this study, the effects of micropile used as one method to restrain the settlement of neighboring structures by the tail void are studied by laboratory model tests. As a basic test result, the effective direction of micropile and the restraint rate of settlement by micropile reinforcement are known.

  • PDF

쉴드터널 라이닝 세그멘트의 해석과 거동 특성 (Analysis and Structural Behavior of Shield Tunnel Lining Segment)

  • 이환우;김관수;김광양;강대희
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.757-762
    • /
    • 2007
  • The lining segment which is the main structure of the shield tunnel consists of joints, not continua. Past international and domestic design data have been commonly used for design practices without specific verification about the structural analysis model, design load, and affection of the soil constant of the lining segment. In this study, the propriety is estimated through the comparison between analytical solution and numerical solution for segment analysis and design models of the shield tunnel which is being used internationally and domestically. As a result, the full. circumferential beam jointed spring model (1R-S0) is suggested by considering aspects of convenient use, application to field condition, and accuracy of analysis result. With suggested model, the parameter analysis was conducted for joint stiffness, ground rigidity, joint distribution, and joint number.

  • PDF

쉴드TBM터널에서 뒤채움 주입이 지반의 단기·장기 침하에 미치는 영향에 대한 수치해석적 연구 (Study on the effect of tail void grouting on the short- and long-term surface settlement in the shield TBM Tunneling using numerical analysis)

  • 오주영;박현구;김도형;장석부;이승복;최항석
    • 한국터널지하공간학회 논문집
    • /
    • 제19권2호
    • /
    • pp.265-281
    • /
    • 2017
  • 얕은 터널의 시공에 있어 지표 침하는 주요 관리 사항으로 쉴드 TBM 기술을 적용함으로써 굴착 중 지반 변형의 제어를 통하여 침하를 경감시키는 것이 가능하며, 특히 뒤채움 주입은 침하 경감의 목적으로 쉴드 공법에서는 일반적으로 적용되는 기술이다. 투수성이 낮은 지반에서의 TBM 시공에 의한 지표 침하는 터널 시공 중에 발생할 뿐만 아니라, 터널 관통 후에도 장기간에 걸쳐 발생한다. 장기 침하는 주로 터널 주변의 압밀에 의해 발생되고, 이 압밀 과정은 터널 주변에 과잉간극수압을 유발하는 뒤채움 주입에 의해 영향을 받게 되며 결과적으로 쉴드 TBM 터널에서는 뒤채움 주입이 장기 침하에 큰 영향을 주게 된다. 본 연구에서는 쉴드 TBM 공법 중 뒤채움 주입이 지표 침하에 미치는 영향을 파악하기 위해 3차원 응력-간극수압 연계해석을 수행하였다. 해석 결과 뒤채움 주입압의 증가는 단기 침하를 경감시키지만, 다수의 경우에서 장기 침하의 감소에 기여를 하지 않는 것으로 나타났다. 또한, 장기 침하를 최소한으로 제한할 수 있는 한계 주입압의 존재를 확인하였다.

실내모형시험을 통한 연약지반의 쉴드 TBM 터널굴착 모사 (Simulation of shield TBM tunneling in soft ground by laboratory model test)

  • 한명식;김영준;신일재;이용주;신용석;김상환
    • 한국터널지하공간학회 논문집
    • /
    • 제15권5호
    • /
    • pp.483-496
    • /
    • 2013
  • 본 논문에서는 연약지반에 건설되는 Shield TBM 터널의 시공기술을 제시하였다. 이 연구를 수행하기 위하여 Shield TBM 장비를 축소 제작하여 축소모형 시험을 수행하였으며, 쉴드터널 굴착을 모사하기 위하여 다양한 장비들이 적용되었다. 또한 축소모형시험 중 Shield TBM 장비로 인해 발생되는 지반의 거동을 계측하였으며, 지반의 안정성은 시뮬레이션 결과를 토대로 평가하였다. 이를 바탕으로 쉴드터널의 안전한 시공을 위한 기초자료로 활용하고자 한다. 결론적으로 Shield-TBM 구간에 대한 실내축소모형시험을 통하여 설계의 신뢰성을 확보하고, 시공 시 안전을 위한 개선사항 등과 특히, Shield TBM 추진시 쉴드터널이 통과하는 공항 활주로의 안정성을 확보하기 위한 시공방안을 제시하고자 한다.

3차원 수치해석을 이용한 Shield TBM 굴진시 지표침하 주요 영향요소 분석 (A study on key factors of ground surface settlement due to shield TBM excavation using 3-dimension numerical analysis)

  • 전기찬;김동현
    • 한국터널지하공간학회 논문집
    • /
    • 제17권3호
    • /
    • pp.305-317
    • /
    • 2015
  • 본 연구는 Shield TBM 굴착시 지표침하에 대한 주요 요소를 선정하기 위하여 3차원 지반해석 프로그램을 이용하여 막장압, 뒤채움압, 굴진장, 지반모델 및 요소망에 대한 다양한 조건을 적용하여 수치해석을 수행하였다. 수치해석에 의한 지표침하 산정결과 뒤채움압과 지반모델조건이 가장 큰 영향을 미치는 요소로 판단되었으며 향후 지반조건 및 장비특성에 따른 사례를 추가하여 연구를 보완하고자 한다.

대구경 Shield TBM공법에 의한 수영강 하저터널 시공계획 및 시공중 발생되는 거동의 공학적 분석 (Construction Plan by Large Diameter Shield TBM Method and Analysis of Deformation on Site Under Soo-Young River)

  • 윤현돈;황규호;최기훈
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.25-32
    • /
    • 2001
  • Doosan Construction & Engineering Co., Ltd is building a railway tunnel beneath the Soo-Young River connecting MinLak Station and Centum City Station, a section 230, subway line 2, Pusan City, Korea. When completed the tunnel will have a finished inner diameter of 6.5m(21.311) throughout its total length of 840m(420m = 0.52 miles, Two Single Track Tunnel : 420m+420m). The ground profile of the face toward shield machine is composed of multi layers, silty clay, clayey gravel, soft rock etc. This research paper is to predict ground deformation and variation of stresses around tunnel using Hyperbolic model, and to reflect the works on the next shield tunneling project. And this research paper is analyzed data of measuring instrument (such as settlement gauge, inclinometer, Multiple extensometer, etc.) which is installed along tunnel line for safety of tunnel. For calculations, the finite difference Method is applied. Backfill grouting material is supposed to have instantly strength of 10kg/$\textrm{cm}^2$ above, although its strength is available after 24 hours passed.

  • PDF

해외 쉴드TBM 입찰안내서 분석을 통한 국내 발주 기준 정립에 관한 연구 (A study on the establishment of domestic criteria through analysis of shield TBM requirements in overseas ITB (Invitation to Bid))

  • 김기환;김혁;문철화;김용휴;김동호;이재용
    • 한국터널지하공간학회 논문집
    • /
    • 제19권6호
    • /
    • pp.985-997
    • /
    • 2017
  • 해외에서는 이미 많은 국가에서 대부분의 터널공사가 쉴드TBM공법으로 발주되고 있으며, 국내 기업도 활발하게 참여하여 수행하고 있는 실정이다. 국내의 경우는 재활용 장비를 활용한 전력구, 가스관로, 상하수도 공사를 중심으로, 지하철 터널의 경우는 신규장비를 활용한 7 m 이상의 쉴드TBM공법이 주로 발주되고 있다. 쉴드TBM은 한번 제작되면 변경하기 쉽지 않으므로, 해당 공사의 다양한 특성을 만족하도록 제작조건에 대해 충분한 정보를 발주자가 제공할 필요가 있다. 본 연구는 먼저 최적의 쉴드TBM 제작을 위해 최근 홍콩과 영국에서 발주된 도심지 터널공사의 입찰안내서에서 제시한 제반 조건들을 검토하고, 국내의 입찰안내서와 비교분석하였다. 이러한 분석결과는 향후 국내에서 쉴드TBM을 이용하여 터널공사를 수행하고자 하는 경우, 입찰 및 제작에 대한 보다 발전된 가이드라인을 제공할 수 있을 것으로 기대된다.

주요 영향요소를 고려한 쉴드TBM 터널 3차원 수치해석기법 연구 (Study on the 3 dimensional numerical analysis method for shield TBM tunnel considering key factors)

  • 전기찬;김동현
    • 한국터널지하공간학회 논문집
    • /
    • 제20권2호
    • /
    • pp.513-525
    • /
    • 2018
  • 쉴드TBM 터널을 대상으로 하는 3차원 수치해석은 gap, tail void, 세그먼트설치, 뒤채움재 주입 등과 같은 쉴드TBM 굴착의 여러 특성들을 고려하여 시공과정을 반영할 수 있는 해석이 수행되어야 한다. 그러나 기계 굴착의 특성을 고려하는 해석적 기법은 여러가지 기법들이 혼용되어 적용되는 것이 일반적으로 해석결과의 일관성과 신뢰도에 의문이 제기된다. 본 논문에서는 쉴드TBM 터널의 3차원 수치해석에 사용될 수 있는 여러 기법들을 대상으로 현장에서 실제 계측된 지표침하 데이터를 활용한 매개변수연구를 수행하였다. 그 결과 설계단계에서 지표침하와 막장압 등 터널주변지반의 거동을 유사하게 예측하고 평가하는데 활용할 수 있는 해석기법으로서 분석하고 정리하였다. skin plate 주면압, 뒤채움압과 soil model이 지표침하에 가장 큰 영향요소로 파악되었고, 응력제어기법은 해저터널과같이 굴착지반의 volume loss 정보를 얻을 수 없거나 지표침하나 막장압 등 터널 주변거동파악이 중요한 경우에 적용 가능한 것으로 판단되며, 설계자는 현장여건과 쉴드TBM의 특성이 반영된 합리적인 3차원 수치해석을 수행하는데 본 가이드라인을 기본자료로 활용될 수 있을 것으로 사료된다.

쉴드 TBM 터널 굴착시 지표침하에 관한 신뢰성해석 (Reliability analysis of surface settlement during shield TBM tunneling)

  • 한명식;조국환
    • 한국터널지하공간학회 논문집
    • /
    • 제18권3호
    • /
    • pp.305-318
    • /
    • 2016
  • 본 연구에서는 ${\bigcirc}{\bigcirc}$국제공항 제2여객터미널 연결 철도 건설공사 기본설계 중 쉴드 TBM 터널 굴착 시 Gap parameter와 관련된 지반물성치의 불확실성을 평가하고, 지표침하에 대한 신뢰성해석을 수행함으로써 쉴드 TBM 설계의 적절성을 평가하고자 한다. 또한 Gap parameter에 이용되는 설계정수의 신뢰도지수 및 파괴확률에 대한 민감도를 분석함으로써, 지표침하에 큰 영향을 미치는 설계정수를 평가함으로써 최적의 설계를 수행하는데 기초 자료를 제공하고자 하였다.

건설장비에 의한 터널작업의 소음환경 실태 (Noise Generation Characteristic for Tunnel Construction Equipments)

  • 장재길;김갑배
    • 한국소음진동공학회논문집
    • /
    • 제23권9호
    • /
    • pp.841-849
    • /
    • 2013
  • Workers engaged in construction works have been exposed to high levels of noise during their work in tunnels. Noise is one of the major health hazards for employees working in construction sites. The aim of this study is to evaluate the noise levels generating from tunneling equipments such as jumbo drills, backhoes, payloaders, shotcrete machines and service cars. Explosion and turbo fan noises were also monitored. A high precision sound level meter was introduced for measuring LAeq, LAFmax, LAFmin and LCpeak noises in 5 tunneling work sites that were located in Seoul, Kyunggi-do and Kangwon-do areas with NATM and shield methods. The highest noise was recorded by explosion(151.9 dB LCpeak) followed by jumbo drills of higher than 110 dB(A) LAeq. Backhoe normally generated 90~110 dB(A) LAeq while breaking work of rock showed additional around 5~15 dB(A). Noise exposure levels for payloader and shotcrete machine scored more than 90 dB(A) which might be a source of noise-induced hearing loss. Additional research in revealing noise levels from construction equipments operating in tunneling works may enhance the protection of workers who exposed to noise primarily at the sites.