• Title/Summary/Keyword: Share of cost

Search Result 499, Processing Time 0.025 seconds

The Determinants of Wage Premium (임금(賃金)프리미엄의 결정요인(決定要因))

  • Rhee, Chong-hoon
    • KDI Journal of Economic Policy
    • /
    • v.14 no.4
    • /
    • pp.79-106
    • /
    • 1992
  • This study analyzes the determinants of wage premium, defined as the excess of actual wage rate over opportunity wage, for the average worker in a Korean bargaining unit. Average wage premium of a firm is decomposed into quasi-rent per worker and rent-sharing rule. Per capita quasi-rent, representing a firm's ability to pay, is defined as the difference between sales revenue and the opportunity cost of mobile factors, divided by the number of employees. Rent-sharing rule, a measure of workers' bargaining power, is defined as the average wage premium divided by the per capita quasi-rent. Empirical results show that the differences in wage premium among Korean bargaining units are much better explained by the differences in quasi-rent than by the differences in bargaining power. Also, comparing the results of 1986 with those of 1988 show that the wage settlement mechanism in 1988 was not quite different from that of 1986, in spite of the drastic change in industrial relation system in 1987. It may simply yield higher opportunity wages, by raising the bargaining power of overall workers. The tendency of Korean labor market in 1988 to show a dual structure of high & low wage premium sectors, is not due to the fact that the differences in bargaing powers across firms tend to expand, but to the fact that unions tend to reduce the wage differences among the workers within an enterprise by pursuing more equal distribution of total wage premium. Hence, the policies for reducing the wage differentials across firms should focus on rent-regulating industrial policies, e.g. eliminating monopoly rents by deregulation.

  • PDF

A Study on the Technology Acceptance Factors of the Public Cloud Computing Services (공공 클라우드 컴퓨팅 서비스의 기술수용 결정요인 연구)

  • Kim, Dae Ho;Kim, Tae Hyung
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.8 no.2
    • /
    • pp.93-106
    • /
    • 2013
  • Cloud computing services have became an hot issues in business fields while the IT-related global company such as Amazon, MS, and Google took part in. The cloud computing makes it possible to share in the form of outsourcing of hardware and software through the Internet, to build a distributed computing environment via multiple terminals, and to reduce the cost using open source. Such a cloud computing services have not shown any significant growth in Korea yet compared to other countries. Therefore, in this study focusing on public cloud computing services, it is intended to analyze the determinants of public cloud computing services using the technology model. Thus, for users using public cloud services, we conducted a questionnaire survey from the beginning of January 2013 to the end of February 2013. And we derived a research model based on the Technology Acceptance Model(TAM). As a result of this study, it shows that personal aspects significantly impacts on the perceived usability, service aspects, systems aspects, and the intent of the technology acceptances. System aspects significantly effect on the intent of technology acceptances. Perceived usability significantly effects on the service aspects and the systems aspects. The main factors effecting on the intent of the technology acceptances are system aspects and perceived usability in order. And it shows that the personal aspects decreases the intent of the technology acceptances.

  • PDF

The design and FPGA implementation of a general-purpose LDI controller for the portable small-medium sized TFT-LCD (중소형 TFT-LCD용 범용 LDI 제어기의 설계 및 FPGA 구현)

  • Lee, Si-Hyun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.12 no.4
    • /
    • pp.249-256
    • /
    • 2007
  • AIn this paper, a new desist of LDI controller IC for general purpose is proposed for driving the LDI(LCD Driver Interface) controller in $4{\sim}9$ inches sized portable small-medium TFT-LCD(Thin Film Transistor addressed -Liquid Crystal Display) panel module. The designed LDI controller was verified on the FPGA(Reld Programmable Gate Array) test board, and was made the interactive operation with the commercial TFT-LCD panel successfully. The purpose of design is that it is standardized the LDI controller's operation by one LDI controller for driving all TFT-LCD panel without classifying the panel vendor, and size. The main advantage for new general-purpose LDI controller is the usage for the desist of all panel's SoG(System on a Glass) module because of the design for the standard operation. And in the previous method, it used each LDI controller for every LCD vendor, and panel size, but because a new one can drive all portable small-medium sized panel, it results in reduction of LDI controller supply price, and manufacturing cost of AV(Audio Video) board and panel. In the near future, the development of SoG IC(Integrated Circuit) for manufacturing more excellent functional TFT-LCD panel module is necessary. As a result of this research, the TFT-LCD panel can make more small size, and light weight, and it results in an upturn of domestic company's share in the world market. With the suggested theory in this paper, it expects to be made use of a basic data for developing and manufacturing for the SoG chip of TFT-LCD panel module.

  • PDF

Design of Traffic Control Scheme for Supporting the Fairness of Downstream in Ethernet-PON (이더넷 기반 광가입자망에서 공평성 보장을 위한 하향 트래픽 제어 기법 설계)

  • Han Kyeong-Eun;Park Hyuk-Gu;Yoo Kyoung-Min;Kang Byung-Chang;Kim Young-Chon
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.43 no.5 s.347
    • /
    • pp.84-93
    • /
    • 2006
  • Ethernet-PON is an emerging access network technology that provides a low-cost method of deploying optical access lines between OLT and ONUs. It has a point-to-multipoint and multipoint-to-point architecture in downstream and upstream direction, respectively. Therefore, downstream packets are broadcast from an OLT toward all ONUs sithout collision. On the other hand, since alt ONUs share a common channel, the collision may be occurred for the upstream transmission. Therefore, earlier efforts on Ethernet-PON have been concentrated on an upstream MAC protocol to avoid collision. But it is needed to control downstream traffic in practical access network, where the network provider limits available bandwidth according to the number of users. In this paper, we propose a traffic control scheme for supporting the fairness of the downstream bandwidth. The objective of this algorithm is to guarantee the fairness of ONUs while maintaining good performance. In order to do this, we define the service probability that considers the past traffic information for downstream, the number of tokens and the relative size of negotiated bandwidth. We develop the simulation model for Ethernet-PON to evaluate the rate-limiting algorithm by using AWESIM. Some results are evaluated and analyzed in terms of defined fairness factor, delay and dropping rate under various scenario.

Traumatic Disc Injuries and the Iatrogenic Spinal Disability (외상성 추간판 손상과 의원성 척추장애인 만들기)

  • Lee, Kyeong-Seok;Doh, Jae-Won;Yoon, Seok-Mann;Bae, Hack-Gun;Yun, Il-Gyu
    • Journal of Korean Neurosurgical Society
    • /
    • v.29 no.7
    • /
    • pp.935-939
    • /
    • 2000
  • Objective : Traumatic disc lesion is a lesion with tremendous controversies. The causal relationships of this lesion are not established along with pathogenesis, diagnostic criteria, methods of treatment and the outcome. However, a significant number of patients with back pain after a trauma underwent spinal operations under the diagnosis of traumatic disc lesions. Such an ill-directed operation eventually produce a person with an iatrogenic disability. We present two illustrative cases, and tried to make a preventive method. Methods : We examined the path from mild trauma after a road traffic accident into the iatrogenic disability in two illustrative cases, who requested disability assessment and medical appraisement. We evaluated the reason and background for such an unwanted outcome and tried to find a method to reduce or prevent it by a literature review. Results : These two patients were admitted to the hospital with the diagnosis of lumbar sprain after a road traffic accidents. They eventually underwent spinal surgery under another diagnosis such as traumatic disc herniation or internal disc disruption. They stayed at the hospital for more than six months and finally lost their jobs. They became the disabled at last. Although they complained back pain, they never insisted by themselves that their symptoms were due to the traumatic disc lesion. To prevent such an iatrogenic disability, the doctors should assist them to go-back to the workplace promptly instead of a reckless extension of the treatment period. It may be necessary to evaluate the certificates to extend the treatment period with an additional diagnosis by a medical expert. To reduce the unnecessary long-term admission, a new billing system such as a partial share for the high cost of the treatment by the patients may be needed. Conclusion : It is not the patient but the doctors, who has the responsibility to avoid the unnecessary operations. All treating doctors should try to reduce or prevent such an iatrogenic complication caused by ourselves before we are forced to do so.

  • PDF

A Study on Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (계층화분석법에 의한 BTO 민간투자사업 협상의 주요쟁점 특성분석에 관한 고찰)

  • Roh, Tae-Ho;Kim, Jong-Won;Lim, Chang-Sik;Lee, Jong-Chool
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.137-146
    • /
    • 2008
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

Fault Test Algorithm for MLC NAND-type Flash Memory (MLC NAND-형 플래시 메모리를 위한 고장검출 테스트 알고리즘)

  • Jang, Gi-Ung;Hwang, Phil-Joo;Chang, Hoon
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.49 no.4
    • /
    • pp.26-33
    • /
    • 2012
  • As the flash memory has increased the market share of data storage in imbedded system and occupied the most of area in a system, It has a profound impact on system reliability. Flash memory is divided NOR/NAND-type according to the cell array structure, and is classified as SLC(Single Level Cell)/MLC(Multi Level Cell) according to reference voltage. Although NAND-type flash memory is slower than NOR-type, but it has large capacity and low cost. Also, By the effect of demanding mobile market, MLC NAND-type is widely adopted for the purpose of the multimedia data storage. Accordingly, Importance of fault detection algorithm is increasing to ensure MLC NAND-type flash memory reliability. There are many researches about the testing algorithm used from traditional RAM to SLC flash memory and it detected a lot of errors. But the case of MLC flash memory, testing for fault detection, there was not much attempt. So, In this paper, Extend SLC NAND-type flash memory fault detection algorithm for testing MLC NAND-type flash memory and try to reduce these differences.

A Study on the Efficiency & Limitation of 3D Animation Production Management Using Production Management Tool - Focusing on Shotgun Software & Ftrack (3D 애니메이션 제작 관리를 위한 제작관리도구(Tool)의 효율성 및 한계 - 샷건(Shotgun)과 Ftrack(에프트랙)을 중심으로)

  • Lee, Esther Kkotsongyi
    • Cartoon and Animation Studies
    • /
    • s.49
    • /
    • pp.1-23
    • /
    • 2017
  • 3D animation production has had a pivotal position in current animation industry and the necessity of professional management tool for 3D animation production has claimed due to its sophisticated pipeline from advance of technology and global production partnership trend. Shotgun and Ftrack are providing the most appropriate management toolset for 3D animation management among the extant management tools and the efficiency of Shotgun & Ftrack is identified compared with the traditional document oriented management style. The biggest strength of production management using Shotgun is that all of the production staff can directly participate in the communication on the tools therefore they can share the information on Shotgun & Ftrack in real time without constraint of time and location. Moreover, all the process of the production and the history of the discussion on certain production issues are systematically accrue on the tool so that the production history can be easily tracked. Finally, the production management using tools contributes collecting and analysing the production information for the production management team in studios. However, Shotgun & Ftrack has metadata based retrieval method which cost huge amount of effort by human's manual annotation and it also has the limitation of accuracy. In addition, the fact that studios has to have technical professionals first in order to institute the tools into their studios is the actual difficulty of Korean studios when they want to use management tools for their project. Thus, this paper suggests adopting the content-based retrieval system on the tools and tools' expanded technical service for the studios as the solution of the identified issues.

The Technology Trend of Interconnection Network for High Performance Computing (고성능 컴퓨팅을 위한 인터커넥션 네트워크 기술 동향)

  • Cho, Hyeyoung;Jun, Tae Joon;Han, Jiyong
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.8
    • /
    • pp.9-15
    • /
    • 2017
  • With the development of semiconductor integration technology, central processing units and storage devices have been miniaturized and performance has been rapidly developed, interconnection network technology is becoming a more important factor in terms of the performance of high performance computing system. In this paper, we analyze the trend of interconnection network technology used in high performance computing. Interconnect technology, which is the most widely used in the Supercomputer Top 500(2017. 06.), is an Infiniband. Recently, Ethernet is the second highest share after InfiniBand due to the emergence of 40/100Gbps Gigabit Ethernet technology. Gigabit Ethernet, where latency performance is lower than InfiniBand, is preferred in cost-effective medium-sized data centers. In addition, top-end HPC systems that demand high performance are devoting themselves from Ethernet and InfiniBand technologies and are attempting to maximize system performance by introducing their own interconnect networks. In the future, high-performance interconnects are expected to utilize silicon-based optical communication technology to exchange data with light.

Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (AHP 기법을 이용한 BTO 민간투자사업 협상의 주요쟁점 특성분석)

  • Roh, Tae-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.8
    • /
    • pp.234-244
    • /
    • 2007
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.