• 제목/요약/키워드: Sewage treatment water

검색결과 716건 처리시간 0.025초

간접가온 건조방식의 건조시설을 이용한 하수슬러지 퇴비화에 관한 연구 (Research on composting of sewage sludge using dryer facility with indirect heating system)

  • 백선재;한인섭;최익훈;강성효;홍성민
    • 상하수도학회지
    • /
    • 제28권3호
    • /
    • pp.299-304
    • /
    • 2014
  • The need of reusing sewage sludge is highly increasing as the amount of domestic sewage sludge is growing and sewage management strategies were reinforced. Accordingly, in this research, we studied the composting possibility of sludge in sewage treatment plant J, using dryer facility with indirect system by conducting component analysis of dried sludge and experiment on cultivating crops. It was observed from the component analysis, that the dried sludge is appropriate for both decomposed manure standard of Ministry of Environment and fertilizer standard of Rural Development Administration. Besides, in the experiment on cultivating lettuce, the experimental group(soil + dried sludge) was superior to the control group(soil + bed soil) in apparent condition of leaves tensity and damage by disease and pest. In case of cultivating tomato, the experimental group showed stronger durability of fruits dangling on stems compared to the control group after 9 weeks. Consequently, the excess sludge dried by indirect heating system in the sewage treatment plant J is appropriate for the standard of both Ministry of Environment and Rural Development Administration and show good result in experiment on cultivating crops therefore it can be reused for composting.

인공습지에서의 물질순환에 관한 연구 (Cycling of Matters in the Constructed Wetland)

  • 김동억;박제철
    • 한국환경과학회지
    • /
    • 제29권3호
    • /
    • pp.299-306
    • /
    • 2020
  • This study analyzed the changes in the concentrations of the pollutants of constructed treatment wetlands which come from the discharge water of a sewage treatment plant. According to the results of budgets in constructed wetlands, the net production of the organic carbon, nitrogen and phosphorus were 368 kgC/month, 306 kgN/month and -49 kgP/month, respectively. The high particle form of pollutants are mostly removed due to settlement and absorption when passing through wetlands, but because a low processing efficiency for pollutants was shown when sewage treatment plant wastewater flows in, there is a need for a water management system that can reduce the organic matter load through monitoring. The low removal efficiency of constructed wetlands were caused by both structural and operational problems. Therefore, to enable to play a role as a reduction facility of pollutants, an appropriate design and operation manuals for constructed wetlands is urgently needed.

하수종말처리장 방류수와 비점오염원 처리를 위한 주암호 인공습지 2년 운영 사례 (Case Study: Operation of the Juam Constructed Wetland for Effluent from a Sewage Treatment Plant and Diffuse Pollution for Two Years)

  • 정용준
    • 한국물환경학회지
    • /
    • 제22권6호
    • /
    • pp.1031-1037
    • /
    • 2006
  • In order to improve water quality of the Juam Lake, a constructed wetland was implemented and operated for 2 years with the effluent of sewage treatment plant and diffuse pollutant discharged from agricultural area. During the summer season, average removal efficiencies for BOD and SS were 15.8% and 39.4%, respectively. Due to the mixed effect of vegetation, soil microbes and sediments, the higher nutrient removal efficiencies were obtained: average T-N and T-P removal efficiencies were 64.2% and 71.7%, respectively. The concentration of sediment was increased initially, and maintained constant throughout monitoring period. The highest nitrogen and phosphorus uptake were observed in Phragmites japonica. The nitrogen uptake was estimated as 0.235 DW mg/g while phosphorus uptake was estimated as 2.059 DW mg/g.

신경망 분석을 활용한 하수처리장 데이터 분석 기법 연구 (Wastewater Treatment Plant Data Analysis Using Neural Network)

  • 서정식;김태욱;이해각;윤종호
    • 한국환경과학회지
    • /
    • 제31권7호
    • /
    • pp.555-567
    • /
    • 2022
  • With the introduction of the tele-monitoring system (TMS) in South Korea, monitoring of the concentration of pollutants discharged from nationwide water quality TMS attachments is possible. In addition, the Ministry of Environment is implementing a smart sewage system program that combines ICT technology with wastewater treatment plants. Thus, many institutions are adopting the automatic operation technique which uses process operation factors and TMS data of sewage treatment plants. As a part of the preliminary study, a multilayer perceptron (MLP) analysis method was applied to TMS data to identify predictability degree. TMS data were designated as independent variables, and each pollutant was considered as an independent variables. To verify the validity of the prediction, root mean square error analysis was conducted. TMS data from two public sewage treatment plants in Chungnam were used. The values of RMSE in SS, T-N, and COD predictions (excluding T-P) in treatment plant A showed an error range of 10%, and in the case of treatment plant B, all items showed an error exceeding 20%. If the total amount of data used MLP analysis increases, the predictability of MLP analysis is expected to increase further.

오염부하 물질수지 분석을 통한 합류식 하수관거 적정 차집용량 결정(II) - 차집용량과 월류오염부하 삭감목표 설정 - (Determination of Interception Flow by Pollution Load Budget Analysis in Combined Sewer Watershed (II) - Establishment of Intercepting Capacity and Reduction Goal of Overflow Pollution Load -)

  • 이두진;신응배
    • 상하수도학회지
    • /
    • 제19권5호
    • /
    • pp.557-564
    • /
    • 2005
  • The objective of this study is to evaluate a criteria of intercepting capacity and a reduction goal of overflow pollution load in combined sewer system. In the current criteria of intercepting capacity in the domestic sewage facility standard, it is known that three times of peak sewage (Q) in dry period or runoff flow by 2mm/hr is not appropriate since the intercepted flow is estimated by runoff and show different result even in the same watershed. Though a reduction goal of overflow pollution load can be determined from 1) same level of storm-water runoff pollution load in separated storm sewer, 2) less than 5% sewage load in dry weather period, by the domestic sewage facility standard, the simulated results from storm-water model show large differences between two criteria. While it is predicted that sewage pollution load standard three time larger than separated storm sewer standard in high population density and urbanized area, it is shown that separate storm sewer standard larger than sewage pollution load standard in middle population density and developing area. Accordingly, it is proposed that more reasonable intercepting flow and reduction goal of overflows pollution load should be established to minimize discharging pollution load in combined sewer systems. For the purpose, a resonable standard has to be amended by pollution load balance considering the characteristics of a watershed for generation, collection, treatment, and discharging flow.