기초 매스콘크리트의 수화열 저감을 위한 초지연제 응결시간차 공법의 현장 적용 (Construction Considering the Difference of Setting Time of Super Retarding Agent for Reduction of Hydration Heat of Footing Mass Concrete)

  • 황인성;배정렬;윤석명;김기철;오선교;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.95-98
    • /
    • 2003
  • This paper presents the results of field experiment to apply the difference of setting tine method using super retarding agent for reducing hydration heat of mass concrete of foundation. According to the results, as the properties of fresh concrete, base concrete satisfies aimed slump and air content, and there is no difference of slump and air content with mixture of super retarding agent. The mixing ratio of super retarding agent is determined for setting time to be retarded by 12 hours in comparison with base concrete, but because the temperature of the air and concrete is low, the difference of setting time is retarded to 24 hours. In man concrete of foundation to which the difference of setting time method is applied, crack by hydration heat is not seen because the lower concrete of super retarding agent generates heat after generation of hydration heat of the upper concrete.

  • PDF

혼화재를 조합 사용한 초지연 콘크리트의 응결시간 추정 (Estimation of the Setting Time of the Super Retarding Concrete Combining Mineral Admixtures)

  • 한민철
    • 한국건축시공학회지
    • /
    • 제8권3호
    • /
    • pp.111-117
    • /
    • 2008
  • This study provides the setting time prediction method of super retarding concrete incorporating mineral admixtures at the same time including fly ash(FA), blast furnace slag(BS) based on maturity method. The setting time was retarded, as super retarding agent contents increase and curing temperature decreases. In addition, apparent activation energy by Arrhenius function was ranged from $24{\sim}35KJ/mol$ with slightly difference along with mixture proportion. This value is smaller than existing value $30{\sim}50KJ/mol$. It is Indicated that equivalent age using setting time can be a proper method to predict setting time and it also exhibited comparable relativity between prediction value and measurement value. Therefore, this study provided setting time prediction value with super retarding agent contents and mineral admixture combination. Setting time prediction equation provided herein is possibly valid for estimating precise setting time of the super retarding concrete at the job site.

초급 일본인 한국어 학습자의 거절 화행 연구 : 시간차에 따른 전략 사용 양상을 중심으로 (Study on the Refusal Speech Act of Japanese Korean Learners of Beginner Level : Focusing on the aspect of strategy use by time)

  • 이복자
    • 한국어교육
    • /
    • 제25권1호
    • /
    • pp.83-113
    • /
    • 2014
  • This study aims to examine the change of strategy use by analyzing the refusal sequence of beginner Japanese Korean learners by time difference of 10 weeks. The results of the study are as follows; First, in the solidarity system of politeness(power-, distance-), learners showed similar ability as native Koreans after 10 weeks. Second, in the deference system(power-, distance+), there was a difference according to the situational burden when using strategies. In the invitational setting, the learners sought justification for their refusal or tried to negotiate by explaining in detail as time passed. However, in the request setting, they showed no will to compromise by refusing directly and leading the listener to give up. Third, similar difference was found in the use of strategies depending on the situational burden in the hierarchical system(power+, distance+). While learners could present their justification for refusal by showing their interest in the invitation as time passed in the invitation setting, they expressed straight refusal and were not willing to negotiate in the request setting.

응결시간차를 활용한 매스콘크리트의 수화열 조정공법 (A Method on the Control of Hydration Heat of Mass Concrete Considering the Difference of Setting Time)

  • 심보길;윤치환;한민철;김기철;오선교;한천구
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2001년도 가을 학술발표회 논문집
    • /
    • pp.379-384
    • /
    • 2001
  • This Paper Presents field application test results of mass concrete using super retarding agent. The field test was carried out at mat foundation(thickness 1m) of newly constructed information center of Chongju university. Placing lift composed of 2 layers, and each layer is 50cm. Fly ash and flowing method is also applied. Difference of setting time of concrete between with super retarding agent and without super retarding agent is considered. Concrete without super retarding agent is placed at upper layer and with super retarding agent at lower layer According to test results, the reducing method of hydration heat considering difference of setting time with super retarding agent can reduce the highest temperature about 3~4$^{\circ}C$, and delay the peak time about 3~4days. Compressive strength using super retarding agent is somewhat higher than that of normal concrete. Accordingly, super retarding agent does not affect the strength development.

  • PDF

온도균열 저감공법을 복합사용한 매스콘크리트의 현장적용 (Field Application of the Mass Concrete Utilizing Combined Method for Temperature Crack Reduction)

  • 한상윤;이충섭;백대현;장덕배;한민철;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.37-39
    • /
    • 2010
  • In this study, with new office construction site of S Construction company as subject, to solve all the problems according to reduced hydration heat and temperature crack of mass concrete used mat foundation and placing time difference, low heat combination of coarse particle cement and fly-ash and setting time difference applied AE water reducing agent, and to prevent the early frost damage caused by low outdoor temperature, a heat insulation method using double bubble sheet was conducted. As a result, it was found that hydration heat and setting time difference was reduced by applying a low heat combination and setting time difference construction method, and that the high insulation capability of the double bubble sheet was able to not only prevent the early frost damage but also reduce temperature difference between the central part and the upper part of mass concrete.

  • PDF

초지연제의 응결시간차를 이용한 매스 콘크리트의 수화열 저감을 위한 현장 적용 (Field Application of Mass Concrete Using Setting Time Difference of Super Retarding Agent for Reduction of Hydration Heat)

  • 전충근;심보길;손성운;신동안;오선교;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.11-14
    • /
    • 2004
  • In this paper, field application of mass concrete using setting time difference of super retarding agent is reported to reduce hydration heat of concrete placed at newly constructed apartment house in Busan. Horizontal placing lift is applied. According to test results. slump and air content meets the requirement of target values. For compressive strength, it exceeds the nominal strength ordered by the costumer. Compressive strength of concrete cured in place is achieved more than the values of nominal strength at l4days. For temperature history, maximum temperature of center at top section shows 58.5$^{\circ}C$, and at bottom section, 62.6$^{\circ}C$. According to naked eye's investigation, no hydration heat crack is observed at the surface of concrete.

  • PDF

매스콘크리트의 수화열저감을 위한 초지연제 응결시간차 공법의 현장 적용 -대전 가오지구 코오롱 하늘채 아파트 현장- (Field Application of Setting Time Difference Method Using SRA for Reduction of Hydration Heat of Mass Concrete)

  • 전충근;김종;신동안;윤기원;오선교;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 춘계 학술기술논문발표대회 논문집
    • /
    • pp.21-24
    • /
    • 2005
  • In this paper, field application of mass concrete using setting time difference of super retarding agent is reported to reduce hydration heat of concrete placed at newly constructed apartment house in Daejeon. Horizontal placing lift is applied. According to test results,: slump and air content meets the requirement of target values. For compressive strength, it exceeds the nominal strength ordered by the costumer. For temperature history, maximum temperature of center at top section shows $25.6^{\circ}C$, and at bottom section, $35.4^{\circ}C$. According to naked eye's investigation, no hydration heat crack is observed at the surface of concrete.

  • PDF

전이보 매스콘크리트의 수화열저감을 위한 초지연제 응결시간차 공법의 적용가능성에 대한 검토 (Investigation on the Applicability for Method of Setting Time Difference by Super Retarding Agent for Reducing Hydration Heat of Transfer Girder Mass Concrete)

  • 윤섭;황인성;백병훈;한천구
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2004년도 춘계 학술발표회 제16권1호
    • /
    • pp.128-131
    • /
    • 2004
  • This paper is to investigate the mock up test results of mass concrete for transfer girder using setting time difference with super retarding agent(SRA) to reduce hydration heat. According to test results, the temperature history of plain concrete without placing lift had a steep rising curvature, and plain concrete had a big temperature difference between surface and middle section of mass concrete, which may result in occurrence of temperature crack. However, considering placing method B, because setting time of middle section concrete was retarded with an increase in SRA contents, higher hydration heat temperature was observed at surface section concrete compared with that at middle section concrete at early age, which can lower the possibility of hydration heat crack. In case of placing method C, although peak temperature of hydration heat was much lower, at early age, high crack occurrence possibility of the hydration heat attributable to the big temperature difference between middle section and bottom section of concrete was expected at bottom section concrete. Therefore, the structure above the ground like transfer girder is not applicable to consider the placing method C.

  • PDF

초대형 매트기초 매스 콘크리트의 응결시간조정에 의한 온도균열저감 공법적용의 기초적 실험 (A Fundamental Test of Temperature Crack Reduction Method Application by Setting Time Control of Large-Scaled Mat Foundation Mass Concrete)

  • 한천구;이재삼;노상균
    • 한국건축시공학회지
    • /
    • 제9권3호
    • /
    • pp.95-101
    • /
    • 2009
  • Constructing large-scale mat foundation mass concrete is increasing for the stability of building structure, because a lot of high rise building are being built in order to make full use of limited space. However, It is of increasing concerns that because limited placing equipments, available job-site and systems for mass concete placement in construction field do not allow to place great quantity of concrete at the same time in large scale mat foundation, consistency between placement lift can not be secured. And also, it is likely to crack due to stress caused by the difference of hydration heat generation time. To find out the solution against above problems, this study is to reconfirm the performance of normal concrete designed by mix proportion and super retarding concrete. The Fundamental test shows what happens if low heat proportioning and control method of setting time are applied at the job-site of newly constructed high rise building. The test result show that slump flow of concrete has been somewhat increased as the target retarding time gets longer, while the air content has been slightly decreased but this is no great difference from normal concrete. The setting time shows to be retarded as target retarding time gets longer, the range of retarding time increases. It is necessary to increase the amount of mix of super retarding agent in the proportion ration by setting curing temperature high since outdoor curing is about 6 hours faster than standard curing, which means the temperature of the concrete will be higher than the temperature of the surrounding environment, due to its high hydration heat when applying in a construction site. The compressive strength of super retarding concrete appears to be lower than normal concrete due to the retarding action in the early stage. However, as the time goes by, the compressive strength gets higher, and by the 28th day the strength becomes the same or higher than normal concrete.

초지연제의 응결시간차에 따라 분할타설된 매스 콘크리트의 수화열 저감 (Reduction of Hydration Heat in Division-Placed Mass Concrete Considering the Difference of Setting Time in Super Retarding Agents)

  • 지석;배정렬;황인성;윤치환;김기철;한천구
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.805-808
    • /
    • 2002
  • This study is designed to reduction of hydration heat of 4 layer division-placed mass concrete considering the difference of setting time of super retarding agent. According to the results, peak temperature of plain concrete by hydration heat show $63^{\circ}C$ around the age of 1 days. Hydration heat is lowest in the bottom layer, and highest in the middle of 3rd layer from the bottom. Hydration heat of mock up structure, which is division-placed at the same interval of 1 and 2 days by setting time difference of super retarding agent, is highest in the bottom layer because after peak temperature of 4th layer, hydration reaction progresses in order of 3rd, 2nd and 1st layer. But in mock up structure which is division-placed at the various interval. peak temperature by hydration heat is reduced by about $13^{\circ}C$, compared with plain concrete because after first peak hydration heat of 4th layer (plain concrete), hydration reaction progresses after the drop of hydration heat in order of 3rd, 2nd and 1st layer.

  • PDF