• Title/Summary/Keyword: Set Building

Search Result 1,449, Processing Time 0.031 seconds

An efficient optimization approach for wind interference effect on octagonal tall building

  • Kar, Rony;Dalui, Sujit Kumar;Bhattacharjya, Soumya
    • Wind and Structures
    • /
    • v.28 no.2
    • /
    • pp.111-128
    • /
    • 2019
  • In this paper an octagon plan shaped building (study building) in presence of three square plan shaped building is subjected to boundary layer wind flow and the interference effects on the study building is investigated using Computational fluid dynamics. The variation of the pressure coefficients on different faces of the octagon building is studied both in isolated and interference conditions. Interference Factors (IF) are calculated for different faces of the study building which can be a powerful tool for designing similar plan shaped buildings in similar conditions. A metamodel of the IF, in terms of the distances among buildings is also established using Response Surface Method (RSM). This set of equations are optimized to get the optimum values of the distances where the IF is unity. An upstream Interference zone for this building setup and wind environment is established from these data. Uncertainty principle is also utilised to determine the optimum positions of the interfering buildings considering the uncertain nature of wind flow for minimum interference effect. The proposed procedure is observed to be computationally efficient in deciding optimum layout at buildings often required in city planning. The results show that the proposed RSM-based optimization approach captures the interference zone accurately with substantially less number of experiments.

Combining Machine Learning Techniques with Terrestrial Laser Scanning for Automatic Building Material Recognition

  • Yuan, Liang;Guo, Jingjing;Wang, Qian
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.361-370
    • /
    • 2020
  • Automatic building material recognition has been a popular research interest over the past decade because it is useful for construction management and facility management. Currently, the extensively used methods for automatic material recognition are mainly based on 2D images. A terrestrial laser scanner (TLS) with a built-in camera can generate a set of coloured laser scan data that contains not only the visual features of building materials but also other attributes such as material reflectance and surface roughness. With more characteristics provided, laser scan data have the potential to improve the accuracy of building material recognition. Therefore, this research aims to develop a TLS-based building material recognition method by combining machine learning techniques. The developed method uses material reflectance, HSV colour values, and surface roughness as the features for material recognition. A database containing the laser scan data of common building materials was created and used for model training and validation with machine learning techniques. Different machine learning algorithms were compared, and the best algorithm showed an average recognition accuracy of 96.5%, which demonstrated the feasibility of the developed method.

  • PDF

BIM-Based Simulator for Rebar Placement

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.98-107
    • /
    • 2012
  • Reinforcing bars (rebar) comprise an integral part of a concrete structure, and play a major role in the safety and durability of the building. However, the actual placement or installation of rebar is not planned and controlled by the detailer. Recently, 4D simulations, using 3D model and scheduling software, have been used to improve the efficiency of the construction phrase. However, 4D simulators have not been introduced at the detailed level of work, such as rebar placement. Therefore, this paper suggests a BIM-based simulator for rebar placement to determine the sequence with which rebar is placed into the form. The system using Autodesk Revit API automatically generates rebar placement plans for a building structure, and labels the placement sequence of each individual bar or set of bars with ascending numbers. The placement sequence is then visualized using Autodesk Revit Structure 2012. This paper provides a short description of a field assessment and limits.

The ASHRAE Design Guide for Tall, Supertall and Megatall Building Systems

  • Simmonds, Peter
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.4
    • /
    • pp.311-318
    • /
    • 2015
  • The ASHRAE Design Guide for Tall, Supertall and Megatall Building Systems was produced in collaboration with the CTBUH. The design guide outlines various tall building mechanical systems that are presently being designed or are planned for the future. Tall commercial buildings in particular present a series of design problems that set them apart from other functions. The Design Guide will be of interest to owners, architects, structural engineers, mechanical engineers, electrical engineers and other specialized engineers and consultants. This design guide addresses design issues for tall commercial buildings, which are very often mixed-use, and commonly consist of low level retail, office floors, residential units, and hotel uses.

A Study on the Maintenance System Improvement for Commercial Residential Buildings (주상복합건물의 유지관리 제도 개선방안)

  • Kim Seung-Jin;Baeck Kwang-Sub;Yeo Jong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.191-196
    • /
    • 2005
  • Unpreparedness of the maintenance regulations is regarded as the main reason for the short life span of the multi-owned commercial residential buildings. This study suggests that the followings should be prepared for the effective maintenance and life prolongation of the multi-owned commercial residential buildings : 1) Standard maintenance regulations for those buildings should be set up, 2) Building maintenance works should be performed by the specialists, like licensed building manager, mechanical and electrical engineers, etc., 3) Long-range repair expenses should be laid by on the monthly base according to the long-range repair plan, 4) Regulations concerning the defect repair should be provided properly.

  • PDF

Radionuclide-Specific Exposure Pathway Analysis of Kori Unit 1 Containment Building Surface

  • Byon, Jihyang;Park, Sangjune;Ahn, Seokyoung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.18 no.3
    • /
    • pp.347-354
    • /
    • 2020
  • Site characterization for decommissioning Kori Unit 1 is ongoing in South Korea after 40 years of successful operation. Kori Unit 1's containment building is assumed to be mostly radioactively contaminated, and therefore radiation exposure management and detailed contamination investigation are required for decommissioning and dismantling it safely. In this study, site-specific Derived Concentration Guideline Levels (DCGLs) were derived using the residual radioactivity risk evaluation tool, RESRAD-BUILD code. A conceptual model of containment building for Kori Unit 1 was set up and limited occupational worker building inspection scenario was applied. Depending on the source location, the maximum contribution source and exposure pathway of each radionuclide were analyzed. The contribution of radionuclides to dose and exposure pathways, by source location, is expected to serve as basic data in the assessment criteria of survey areas and classification of impact areas during further decommissioning and decontamination of sites.

A Study on the Expression Level of BIM Model for utilizing in Construction Phase (시공단계 활용을 위한 BIM모델의 표현수준에 관한 연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.253-254
    • /
    • 2016
  • In the trend of building enlargement, high-rise and irregular shaped building, domestic application of BIM in construction phase is increasing in recent years. BIM that is based on a three-dimensional, requires a specific building expression. Model expression level required for each phase such as design, construction, and maintenance of the construction project can be different. BIM model to apply in practice is difficult because it is not clear to set up the criteria for the expression level of construction BIM model. And it has a limit that is lower productivity in construction project. Therefore, this study considers the way of the improvement and analyzes the application for representation level of construction BIM model through the survey. By analyzing of the survey results, this study will be to present a basis for an appropriate expression level setting of construction BIM model.

  • PDF

A Study on Prediction of Hourly Cooling Load Using Building Area (건물 면적을 이용한 시간별 냉방부하 예측에 관한 연구)

  • Yoo, Seong-Yeon;Han, Kyu-Hyun
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.11
    • /
    • pp.798-804
    • /
    • 2010
  • New methodology is proposed to predict the hourly cooling load of the next day using maximum/minimum temperature and building area. The maximum and minimum temperature are obtained from forecasted weather data. The cooling load parameters related to building area are set through a database provided from reference buildings. To validate the performance of the proposed method, the predicted cooling loads in hourly bases are calculated and compared with the measured data. The predicted results show fairly good agreement with the measured data for benchmarking building.

A Translator for Parametrized Building Component Interoperability among Open BIM Support Software (개방형 BIM 지원 소프트웨어간 파라메트릭 건축부재 정보의 호환성 향상을 위한 변환기)

  • Kim, In-Han;Lee, Ji-Ah;Park, Seung-Hwa
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.6
    • /
    • pp.467-475
    • /
    • 2010
  • Due to the needs of design optimization and productivity for modernized Korean traditional house, standardization of Korean traditional building components is proceeding by BIM (Building Information Modeling). Currently, most of BIM software support object-based parametric modeling. By means of parameterized Korean traditional building components, the shape and assembly relation can be controlled. Although IFC(ISO/PAS 16739), which is an international standard in the AEC field, has been developed for information exchange among BIM software, IFC and other existing common data formats cannot be exchangeable parametric information. For the exchangeable parametric information within IFC, the authors defined meta-data by using Pset(Property-Set). The authors analyzed results about interoperability test in Revit $Architecture^{TM}$, $ArchiCAD^{TM}$ and Digital $Project^{TM}$. In order to solve found problems, the authors developed a translator to improve interoperability among BIM software.

Image segmentation and line segment extraction for 3-d building reconstruction

  • Ye, Chul-Soo;Kim, Kyoung-Ok;Lee, Jong-Hun;Lee, Kwae-Hi
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.59-64
    • /
    • 2002
  • This paper presents a method for line segment extraction for 3-d building reconstruction. Building roofs are described as a set of planar polygonal patches, each of which is extracted by watershed-based image segmentation, line segment matching and coplanar grouping. Coplanar grouping and polygonal patch formation are performed per region by selecting 3-d line segments that are matched using epipolar geometry and flight information. The algorithm has been applied to high resolution aerial images and the results show accurate 3-d building reconstruction.

  • PDF