This paper considers that a public department under specialized TQM manpower constraints have to implement multiple total quality management (TQM) policies to promote its service performance (fundamental goal) by adopting a centralized sequential advancement strategy (CSAS). Under CSAS, the decision-makers (DMs) start off by focusing specialized TQM manpower on a single policy, then transfer the specialized TQM manpower to the next policy when the first policy reaches the predetermined implementation time limit (in terms of education and training). Suppose that each TQM policy has a different desirous education and training goal. When the desirous goals for all TQM policies are achieved, we say that the fundamental goal will be satisfied. Within the limitation of total implementation period of time for all policies, assume the desirous goals for all TQM policies cannot be achieved completely. Under this premise, the optimal implementation sequence for all TQM policies must be calculated to maximize the weighted achievement of the desirous goal. We call this optimization problem a TQM case of "centralized sequential decision-making problem (CSDMP)". The achievement of the desirous goal for each TQM policy is usually affected by the experience in prior implemented policies, which makes solving CSDMP quite difficult. As a result, this paper introduces the concepts of sequential effectiveness and path effectiveness. The structural properties are then studied to propose theoretical methods for solving CSDMP. Finally, a numerical example is proposed to demonstrate CSDMP′s usability.
This paper explores a rational investment decision model in sequential capital allocation process under capital rationing. A method is proposed for measuring the new investment decision factor which is the flexibility that describes the future availability of invested funds. This flexibility is important in sequential decision process. Also presented is a multiobjective (MO) decision model into which flexibility is incorporated with the profit and risk factors. The effectiveness of this criterion is compared with the expected present value and the mean-semivariance criteria through a simulation model.
Relating to grasping sequential landscape characteristics in consideration of the behavioral characteristics of the subject experiencing visual perception, this study was made on the subject of main walking line section for visitors of three treasures of Buddhist temples. Especially, as a method of obtaining data for grasping sequential visual perception landscape, the researcher employed [momentum sequential viewpoint setup] according to [the interval of pointers arbitrarily] and fisheye-lens-camera photography using the obtained omni-directional angle visual perception information. As a result, in terms of viewpoint selection, factors like approach road form, change in circulation axis, change in the ground surface level, appearance of objects, etc. were verified to make effect, and among these, approach road form and circulation axis change turned out to be the greatest influences. In addition, as a result of reviewing the effectiveness via the subjects, for the sake of qualitative evaluation of landscape components using the VR picture image obtained in the process of acquiring omni-directional angle visual perception information, a positive result over certain values was earned in terms of panoramic vision, scene reproduction, three-dimensional perspective, etc. This convinces us of the possibility to activate the qualitative evaluation of omni-directional angle picture information and the study of landscape through it henceforth.
This paper proposes a NAND-NAND logic sequential Programmable Logic Array (PLA) using CMOS technology, and test generation methods about stuck-open faults. By using LSSD (Level Sensitive Scan Design) method instead of Flip-Flops in Sequential PLA, the complex test problems of sequential logic are simplified. After generating the test sets using connection graph, regular test sequences and all transistor faults detection method in PLA are proposed. Finally, by programming these algorithms in PASCAL at VAX 8700 and adopting these to pratical CMOS Sequential PLA circuits, we proved the effectiveness of this design.
정부지원사업을 평가할 때 단지 수혜집단의 수혜 전 후의 성과를 단순 비교하거나, 혹은 수혜집단과 비수혜집단의 수혜 전 후의 성과차이를 비교하는 경향이 있다. 한편, 이러한 성과평가의 방법은 수혜대상 주변의 환경변화나 수혜집단과 비수혜집단 간의 차이로 인한 영향을 통제하지 못하는 단점이 있다. 따라서 본 연구에서는 이러한 단점을 극복하는 한 가지 방법으로 PSM과 DID의 순차적 적용을 제안한다. 제안한 방법론을 클린사업장 조성 지원 사업의 성과평가에 적용한 결과 자기선택편의를 제거할 수 있어 보다 정교한 성과평가가 가능하였다.
Journal of information and communication convergence engineering
/
제9권2호
/
pp.224-229
/
2011
Cellular Automata is a discrete dynamical system that can be completely described in terms of local relation. For any given image, the system can save its features as well as increase or decrease the brightness of it locally through consideration of optimized transition in succession. These transitions in succession satisfy the function "Lyapunov" and have sequential movements. This study suggests the way of noise reduction for each image with the use of the Sequential Cellular Automata system. The mentioned transition in succession gives stable results with high-convergence performance to random noises and PSNR (Peak Signal-to-Noise Ratio) using histograms and MSE (Mean Square Error) for verification of effectiveness.
This paper presents a new approach for determining an accurate incentive levels of Direct Load Control (DLC) program using sequential Monte Carlo Simulation (MCS) techniques. The economic analysis of DLC resources needs to identify the hourly-by-hourly expected energy-not-served resulting from the random outage characteristics of generators as well as to reflect the availability and duration of DLC resources, which results the computational explosion. Therefore, the conventional methods are based on the scenario approaches to reduce the computation time as well as to avoid the complexity of economic studies. In this paper, we have developed a new technique based on the sequential MCS to evaluate the required expected load control amount in each hour and to decide the incentive level satisfying the economic constraints. In addition, the mathematical formulation for DLC programs' economic evaluations are developed. To show the efficiency and effectiveness of the suggested method, the numerical studies have been performed for the modified IEEE reliability test system.
PLC를 사용한 공정제어시스템의 설계에서 PLC 표준언어중 LD 언어가 가장 널리 사용되고 있다. 그러나 LD 언어는 데이터처리와 유지보수에 대한 단점이 있다. 반면에 SFC 그래픽언어는 복잡한 순차동작을 간결하게 記述할 수 있는 완벽한 방법이지만, 인터록조건을 記述하는데 문제점이 있다. 본 논문에서는 기존의 SFC 컴파일러를 사용하여 인터록을 실현하는 방법을 제시하고, 실예로서 In-Line Spin Coater에 적용하여 타당성을 확인하였다.
This paper concerns an effective text-prompted speaker verification method to increase the performance of speaker verification. While various speaker verification methods have already been developed, their effectiveness has not yet been formally proven in terms of achieving an acceptable performance level. It is also noted that the traditional methods were focused primarily on single, prompted utterance for verification. This paper, instead, proposes sequential decision method using variable threshold focused at handling two utterances for text-prompted speaker verification. Experimental results show that the proposed speaker verification method outperforms that of the speaker verification scheme without using the sequential decision by a factor of up to 3 times. From these results, we show that the proposed method is highly effective and achieves a reliable performance suitable for practical applications.
In transmission system, reclosing scheme is very useful method to improve continuity of power supply and reliability of system. Especially, high speed reclosing which is used generally in transmission systems has a benefit improving transient stability. However, the reclosing can jeopardize the stability under the condition having high difference of voltage phase angle between both ends. Thus, this paper proposes optimal sequential reclosing scheme to improve transient stability due to reclosing operation. The optimal sequential reclosing is that each phase is closed sequentially considering transient energy. In this paper, 345kV and 154kV transmission system is modeled using EMTP (ElectroMagnetic Transient Program) to verify the performance and effectiveness of optimal sequential reclosing on transient stability. Also, Integral Square Error(ISE) method is used to assess the transient stability.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.