• 제목/요약/키워드: Selection Process for Construction Method

검색결과 137건 처리시간 0.03초

골재 입도분포가 도로포장용 롤러전압 콘크리트에 미치는 영향 연구 (A Study on the Gradation Effect of the Property of Roller Compacted Concrete Pavement)

  • 송시훈;이승우
    • 한국도로학회논문집
    • /
    • 제17권3호
    • /
    • pp.49-58
    • /
    • 2015
  • PURPOSES : The use of environmentally friendly construction methods has been recently encouraged to reduce fuel consumption and the effects of global warming. For this purpose, the roller compacted concrete pavement (RCCP) construction method has been developed. RCCP is more environmentally friendly and economically efficient than general concrete by reducing the amount of CO2 generated through the application of a smaller amount of cement. RCCP has a number of advantages such as an easy construction method, low cost, high structural hydration performance, and aggregate interlocking. However, mix design standards and construction guidelines of RCCP are required for domestic application. In addition, a study on aggregate selection, which has an effect on the characteristics of RCCP, is necessary owing to a limited number of researches. Thus, the aggregate effect on the performance of RCCP in securing the required strength and workability was evaluated in consideration of domestic construction. METHODS : Sand and coarse aggregates of both 19mm and 13mm in maximum size were used in this study. Four types of aggregate gradations (s/a = 30%, 58%, and 70% for the sand and coarse aggregate of 19mm in maximum size, and s/a = 50% for a combination of the three types of aggregates) were set up to investigate the effects of the PCA band on the RCC characteristics. The conditions of s/a = 30% and 70% were evaluated to check the gradation effect outside of the recommended band. The conditions of s/a = 58% and 50% were used because they are the optimum combination of the two and three types of aggregates, respectively. RCCP gradation band was suggested gradation with a proper construction method of RCCP by synthetically comparing and analyzing the correlation of optimum water content, maximum dry density, and strength of requirements through its consistency and compaction test. RESULTS : The lower and upper limit lines are insufficient to secure a relatively strong development and workability compared to an aggregate gradation in the RCCP gradation band region. On the other hand, the line in the RCCP gradation band and the 0.45 power curve in the RCCP gradation band region were satisfactory, ensuring the required strength and workability. CONCLUSIONS : The suitable aggregate gradation on RCCP process should meet the RCCP gradation band area; however, fine particles passing through a #60 sieve do not need to be within the recommended gradation band because the influence of this region on such fine particles is small.

사례관리자들의 실천경험 연구 - 질적사례연구 방법 접근 - (A study on the experience of care managers - Approached Qualitative case study method -)

  • 김영숙;임효연;신소라
    • 사회복지연구
    • /
    • 제40권2호
    • /
    • pp.89-122
    • /
    • 2009
  • 본 연구는 사회복지실천현장의 사례관리자들의 직무세계를 분석하기 위해서 그들이 수행하는 사례관리 직무의 빈도, 가장 중요하다고 생각하는 직무군의 유형과 그 이유, 가장 어렵게 생각하는 직무의 유형과 그 이유를 질적사례연구방법을 통해 살펴보았다. 사례관리 직무범주는 데이컴 방법으로 도출했으며 도출된 9개의 직무영역을 사례관리 수행빈도, 중요도, 난이도로 분석하였다. 연구참여자는 사례관리를 주 업무로 하는 3년 이상의 사회복지사 10명이 세평적사례선택을 통해 선택되었으며 자료분석은 매몰된 분석(embedded analysis) 유형을 따라 이루어졌다. 연구결과에 대한 함의에서 연구자들은 본 연구 참여자들의 사례관리실천 경험을 "이용자 중심의 서비스와 제도적 압력 사이에서 긴장을 유지하며 균형점을 찾는 과정"으로 기술했다. 연구결과를 근거로 지역사회복지네트워크 구성, 사례관리자들의 직무권한을 보장하는 제도적 장치 마련, 균형과 상향평준화를 위한 표준매뉴얼의 개발을 제안했다.

정보 입자기반 연속전인 최적화를 통한 자기구성 퍼지 다항식 뉴럴네트워크 : 설계와 해석 (Self-Organizing Fuzzy Polynomial Neural Networks by Means of IG-based Consecutive Optimization : Design and Analysis)

  • 박호성;오성권
    • 대한전기학회논문지:시스템및제어부문D
    • /
    • 제55권6호
    • /
    • pp.264-273
    • /
    • 2006
  • In this paper, we propose a new architecture of Self-Organizing Fuzzy Polynomial Neural Networks (SOFPNN) by means of consecutive optimization and also discuss its comprehensive design methodology involving mechanisms of genetic optimization. The network is based on a structurally as well as parametrically optimized fuzzy polynomial neurons (FPNs) conducted with the aid of information granulation and genetic algorithms. In structurally identification of FPN, the design procedure applied in the construction of each layer of a SOFPNN deals with its structural optimization involving the selection of preferred nodes (or FPNs) with specific local characteristics and addresses specific aspects of parametric optimization. In addition, the fuzzy rules used in the networks exploit the notion of information granules defined over system's variables and formed through the process of information granulation. That is, we determine the initial location (apexes) of membership functions and initial values of polynomial function being used in the premised and consequence part of the fuzzy rules respectively. This granulation is realized with the aid of the hard c-menas clustering method (HCM). For the parametric identification, we obtained the effective model that the axes of MFs are identified by GA to reflect characteristic of given data. Especially, the genetically dynamic search method is introduced in the identification of parameter. It helps lead to rapidly optimal convergence over a limited region or a boundary condition. To evaluate the performance of the proposed model, the model is experimented with using two time series data(gas furnace process, nonlinear system data, and NOx process data).

공동주택 조경관리 입찰 실태와 개선방안 (Improvement Strategy & Current Bidding Situation on Apartment Management of Landscape Architecture)

  • 홍종현;박현빈;윤종면;김동필
    • 한국조경학회지
    • /
    • 제48권4호
    • /
    • pp.41-54
    • /
    • 2020
  • 본 연구는 공동주택의 조경업과 관련한 공사·용역에 대한 입찰실태 분석을 통해 문제점을 파악하고, 개선 방안을 제시하여 투명하고 공정한 입찰시스템 운영을 위한 기초자료로 제공되고자 하였다. 이를 위해 공동 주택 유지관리 이력, 입찰 정보, 전자입찰제 등을 제공하는 '공동주택관리정보시스템(K-apt)'의 자료를 활용하여 조경 분야 공사·용역에 대한 낙찰현황, 낙찰금액, 연중 낙찰 규모와 동향, 공종별 사업자 선정결과 등을 살펴보았다. 그 결과, 한 해 낙찰된 총 건수(36,831건) 중 조경업에 해당하는 건은 4.4%(1,631건)를 차지하고 있으며, 평균 낙찰금액은 약 2,400만 원으로 조사되었다. 건별 낙찰금액 현황으로 조경업 관련 건 중 73%가 3백만 원에서 3천만 원 사이에서 낙찰되었으며, 공종별로는 병충해방제와 유지관리에 해당하는 건이 58.6%를 차지하였다. 월별 낙찰현황으로는 2~4월에 전체 건수의 36%가 집중되었으며, 입찰방법에서는 '일반경쟁입찰'이 59.8%를 차지하였다. 낙찰자 선정방법과 투찰방법에서는 55%가 '최저낙찰제'와 '전자입찰방식'을, 45%가 '적격심사제'와 '직접입찰방식'을 채택한 것으로 나타났다. 입찰 현황에서 도출된 문제점에 대한 개선사항으로 첫째, 현행 '전자입찰방식' 적용 규정에 관한 예외 조항을 최소화하여 전자입찰방식 전면 적용하여 공정한 입찰제도가 운용되도록 한다. 둘째, 공동주택의 녹지환경 품질에 대한 조경 관리 기준을 마련한다. 셋째, 입찰 공고 전 내역서 및 도면 등의 설계 도서를 작성하고, 기초금액을 산출하도록 하는 근거 규정을 마련하여, 사업의 내용을 구체적이고 객관적으로 특정함으로써 공정한 입찰이 가능하도록 한다. 넷째, '사업자 선정지침'의 각종 입찰조건에 대해 선택이 아닌 조건별 세부지침을 마련하여 공정성과 일관성을 확보한다. 이와 같은 연구결과는 공동주택의 조경업 사업자 선정과 조경시설 및 녹지환경 유지관리에 있어 객관적이고 합리적인 기준 마련에 활용될 수 있을 것으로 판단된다.

지하주차장 리모델링 공사시 주동진입방법 선정 모델 개발 (The Development of a Model for Selecting Method of Entry for Apartment in Remodeling an Underground Parking Lot)

  • 송낙현;정인수;이찬식
    • 한국건설관리학회논문집
    • /
    • 제10권2호
    • /
    • pp.65-74
    • /
    • 2009
  • 20년 이상 경과된 노후 공동주택의 세대수는 향후 10년 이내에 350만 세대 이상으로 급격히 증가될 전망이고 이에 대한 대책으로 리모델링이 활성화되고 있다. 주차장확대는 리모델링에 대한 요구사항 중 큰 비중을 차지하고 있다. 주차장확대 중 지하주차장에서 공동주택의 주동으로 진입하는 방법(이하 '주동진입방법'이라고 함)은 기존 엘리베이터의 수직 확장, 주차공간의 대소, 공사기간과 공사비 등에 매우 큰 영향을 미친다. 그러나 공동주택의 지하주차장 확대 시 단지특성, 주동과 주차장의 연계성, 주민의 요구 등에 대한 정확한 평가 없이 경험적인 방법으로 주동진입방법이 결정되고 있다. 이러한 문제를 해결하기 위해서는 체계적이고 합리적인 방법과 절차에 따라 주동진입방법을 선정하여 지하주차장을 확대할 필요가 있다. 본 연구에서는 합리적인 의사결정을 위해 '지하주차장 리모델링 공사시 주동진입방법 선정 모델'을 제시하였다. 연구방법은 주차장확대 방식과 주동진입방법에 대해 조사하였다. 조사된 자료를 바탕으로 전문가들과의 심층면담을 통해 주동진입방법별 특징을 분석하였고 주동진입방법 선정 영향요인을 도출하였다. 영향요인은 시공성, 편의성, 경제성이 도출되었다. 그 후 AHP기법을 적용하여 선정된 영향요인에 대한 가중치를 산정하였다. 가중치 산정 결과 편의성이 가장 높은 값을 받아 주동 진입방법 선정에 제일 중요한 고려사항임을 밝혔다. 또 리모델링이 가능한 단지를 선정하여 주동진입방법별 현장적용성을 평가한 후 단지에 가장 적합한 주동진입방법을 제시하였다. 본 연구는 노후공동주택의 지하주차장 리모델링 공사시 주동진입방법 선택을 위한 참고자료로 활용될 것이다.

ANALYSIS ON THE EVALUATION OF PROJECT EFFICIENCY BASED ON BUDGET EXECUTION: PLANNED OUTAGE MAINTENANCE (POM) FOR ELECTRICITY POWER PLANT

  • Sungkon Moon;Sangwon Han;Myoungwon Kang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.66-73
    • /
    • 2011
  • With rapid industrialization, electric power consumption has been increasing every year in Korea and in other countries. The provision of additional power stations to produce more electricity is one possible response to this steady increase in consumption. Another alternative is to improve the efficiency of existing stations through timely and effective maintenance works. Since the construction of a new power plant involves a large amount of capital as well as difficulties in the selection of sites, the improvement of existing power stations' efficiencies is often a preferred solution. Therefore, this paper focuses on maintenance project management to address this issue. Among several types of maintenance works, this paper concentrates on planned outage maintenance (POM). This focus arises from the critical impact of POM on other maintenance work, as well as the entire process of electricity production. Unlike other maintenance work, POM is done on the basis of mid and long-term plans. In addition, only POM works are conducted during the outage of all power plants. To evaluate the efficiency of POM works, budget data relating to 164 POM projects between 2001 and 2008 was collected from 7 sites in South Korea. Data envelopment analysis (DEA) was selected as a methodology for evaluation. From this analysis, comparative study was used to determine the categories of projects that had performed well, and those with the most optimized budget structures. Moreover, through discussion with industry, this research develops a feasible proposed method by which to enhance the efficiency of POM projects.

  • PDF

영광3,4호기 안전감압계통 추가설비 설계최적화를 위한 시스템엔지니어링 적용연구 (Systems Engineering Approach to Reengineering of YGN 3&4 Safety Depressurization System Retrofit Design)

  • 최문원;김규완;한기인
    • 시스템엔지니어링학술지
    • /
    • 제11권1호
    • /
    • pp.1-7
    • /
    • 2015
  • The purpose of this paper is to present the results of reengineering of the YGN 3&4 (Yonggwang Nuclear Power Plant, Units 3&4) SDS (Safety Depressurization System) retrofit design and to make recommendations for the improvement in design and design procedure implementing the Systems Engineering (SE) process. YGN 3&4 is a basic model for OPR1000 (the Korean standard 1000 MWe plant). The basic model, herein, represents the reference plant for the OPR1000 development. In the middle of the YGN 3&4 construction, the Korean Nuclear Regulatory Body requested a retrofit of this plant with a means to rapidly depressurize the plant in conformance with a severe accident mitigation requirement. For the reengineering of the SDS in YGN 3&4, V-model and functional and physical architectures have been developed. A SE decision making method has been used for the selection of SDS valves. Finally, recommendations have been made to improve OPR1000 design for the improved operation and enhanced safety.

A Design-Decision Support Framework for Evaluation of Design Options in Passenger Ship Engine Room

  • 김수웅
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2006년 창립20주년기념 정기학술대회 및 국제워크샵
    • /
    • pp.277-280
    • /
    • 2006
  • Most real world design evaluation and risk-based decision support combine quantitative and qualitative (linguistic) variables. Decision-making based on conventional mathematics that combines qualitative and quantitative concepts always exhibit difficulty in modelling actual problems. The successful selection process for choosing a design/procurement proposal is based on a high degree of technical integrity, safety levels and low costs in construction, corrective measures, maintenance, operation, inspection and preventive measures. However, the objectives of maximising the degree of technical performance, maximising the safety levels and minimising the costs incurred are usually in conflict, and the evaluation of the technical performance, safety and costs is always associated with uncertainties, especially for a novel system at the initial concept design stage. In this paper, a design-decision support framework using a composite structure methodology grounded in approximate reasoning approach and evidential reasoning method is suggested for design evaluation of machinery space of a ship engine room at the initial stages. It is a Multiple Attribute Decision-Making (MADM) or Multiple Criteria Decision Making (MCDM) framework, which provides a juxtaposition of cost, safety and technical performance of a system during evaluation to assist decision makers in selecting the winning design/procurement proposal that best satisfies the requirement in hand. An illustrative example is used to demonstrate the application of the proposed framework.

  • PDF

A FRF-based algorithm for damage detection using experimentally collected data

  • Garcia-Palencia, Antonio;Santini-Bell, Erin;Gul, Mustafa;Catbas, Necati
    • Structural Monitoring and Maintenance
    • /
    • 제2권4호
    • /
    • pp.399-418
    • /
    • 2015
  • Automated damage detection through Structural Health Monitoring (SHM) techniques has become an active area of research in the bridge engineering community but widespread implementation on in-service infrastructure still presents some challenges. In the meantime, visual inspection remains as the most common method for condition assessment even though collected information is highly subjective and certain types of damage can be overlooked by the inspector. In this article, a Frequency Response Functions-based model updating algorithm is evaluated using experimentally collected data from the University of Central Florida (UCF)-Benchmark Structure. A protocol for measurement selection and a regularization technique are presented in this work in order to provide the most well-conditioned model updating scenario for the target structure. The proposed technique is composed of two main stages. First, the initial finite element model (FEM) is calibrated through model updating so that it captures the dynamic signature of the UCF Benchmark Structure in its healthy condition. Second, based upon collected data from the damaged condition, the updating process is repeated on the baseline (healthy) FEM. The difference between the updated parameters from subsequent stages revealed both location and extent of damage in a "blind" scenario, without any previous information about type and location of damage.

설계VE 제안평가 절차 및 방법에 관한 연구 (A Study on Procedures and Methods for Evaluating VE Alternatives at Design Phase in Construction Projects)

  • 최인수;현창택;홍태훈;김윤식
    • 한국건설관리학회논문집
    • /
    • 제10권4호
    • /
    • pp.129-138
    • /
    • 2009
  • 최근 국내 VE에 관한 이슈가 대두되고 있으며, 이에 따른 연구가 활발히 진행되고 있다. 하지만 기능분석 및 VE분석절차에 관한 연구에 머물러 있을 뿐이고, 합리적인 제안 채택을 위한 연구는 미흡한 실정이다. 이에 본 연구에서는 특히 발주자의 입장에서 실행단계 업무처리와 VE활성화에 일조할 수 있도록, VE프로세스에서 제안채택 여부를 결정하는 최종단계의 평가 절차와 기준에 관한 체계적인 방안을 제인하고자 한다. 우선, 국내외 문헌고찰 및 설문조사를 통하여 문제점을 파악하고 개선방향을 도출한다. 이어서 제안채택 여부 결정을 위한 세부절차를 설정하고 표준평가쉬트를 제안하였다. 마지막으로, 본 논문은 프로젝트의 성격에 따라 발주자 측에서 적절히 조정하여 적용한다면 VE관리업무에 효율적으로 활용될 수 있을 것으로 기대된다.